Buguias | Amlimay | Opening of Bana-ao - Mangakew FMR | 500,000.00 | General Fund CY 2014 | Jamil Sean Construction | Completed | Completed with underrun and LD |
|
Buguias | Sebang | Completion of Sebang Barangay Hall | 300,000.00 | General Fund Non Office CY 2015 | On Top Construction | Completed | |
|
Buguias | Catlubong | Construction of Gymnasium (Phase 3) at Bot-oan E/S | 2,000,000.00 | General Fund | SEJ Construction and Aggregates/ Mr. Eric De Leon | Completed | |
|
Buguias | Catlubong | Construction of Bekes-Palakad Tirepath FMR | | 2016 SB No. 2 | | Completed | Completed for post inspection |
|
Buguias | Poblacion | Opening of Lower Naybo-Benged FMR Poblacion | 1,000,000.00 | 2016 SB No. 2 | | Completed | Completed for Post Inspection |
|
Buguias | Sebang | Abatan - Kabayan - Gurel National Road to Alapang Elementary School road opening | 500,000.00 | SB #2, CY 2016 | JYP Construction | Temporarily suspended | Temporarily suspended due to the procurement of CNC |
|
Buguias | Natubleng | Construction of CR (with PWD room) and ramp with handrail at Pakpakitan | 1,000,000.00 | General Fund 2016 | Dipas Builders | Temporarily suspended | 1) 1 Suspension
2) Temporarily suspended pending resolution of boundary dispute between barangays natubleng and amgaleyguey which had affected the proposed site where the project will be constructed.
|
|
Buguias | Buyacaoan | Road opening / Extension and improvement of Tagpaya - Peggueyna FMR | 100,000.00 | 20% PDF CY 2016 | Juricmarc Construction | Completed | 1) 1 suspension
2) Completed. Revised target Date = 12/17/2018
|
|
Buguias | Amlimay | Completion of Barangay Health Station (Clinic) Amlimay, Buguias, Benguet | 1,000,000.00 | SB No. 1 - 2017 | Pulicay Grandsons Construction | Completed | Completed: 09/15/2018 |
|
Buguias | Abatan | Completion of Tabbacan Barangay Health Station or Birthing Facility | 600,000.00 | SB #4, CY 2017 | Juricmarc Construction | Completed | |
|
Buguias | Abatan | Construction of Septic Tank and Installation of pipeline system and Improvement of Ramp and Handrails | 346,400.00 | SB #1, CY 2017 | On Top Construction | Completed | |
|
Buguias | Baculongan Norte | Improvement of JBR Mandal-em Salidet FMR | 500,000.00 | 20% PDF CY 2017 | MACGAT Construction | Completed | 1 suspension; Completed |
|
Buguias | Catlubong | Completion of Closed Gym, Bot-oan, Catlubong, Buguias, Benguet | 2,000,000.00 | SB #1, CY 2017 | Mel-Soc Construction | Completed | |
|
Buguias | Sebang | Improvement of Pasbol-Impugong FMR, Sebang | 500,000.00 | 20% PDF 2018 | MACGAT Construction | Completed | 1) 1 Suspension
2) Revised target date of completion - October 8, 2018 |
|
Buguias | Baculungan Sur | Improvement of Obanga Crossing FMR, Baculungan Sur (Construction of Retaining Wall) | 500,000.00 | 20% PDF CY 2018 | Juricmarc Construction | Completed | |
|
Buguias | Baculongan Sur | Improvement of Balintag-Dekan Road (Makbas Section) | 500,000.00 | 20% PDF CY 2018 | MACGAT Construction | Completed | |
|
Buguias | Amlimay | Concreting of Dagway Box culvert approach | 200,000.00 | PDF CY 2018 | | Completed | |
|
Buguias | Sebang | Construction of slab bridge and improvement along Paneg-an, Tamangan (Lutaan Section) FMR | 2,000,000.00 | 20% PDF CY 2018 | JYP General Construction | Completed | 1.) With extension of 20 calendar days.
2.) Revised target date of completion: January 23, 2020
3.) Actual date of completion: February 13, 2020. |
|
Buguias | Loo | Improvement/Widening of Lanas Panayaoan FMR (JCT NHS) | 2,000,000.00 | 20% PDF 2018 | JYP General Construction | Completed | Suspended until such time that Loo NHS will allow the construction of PCCP within the school compound.
|
|
Buguias | Amgaleyguey | Construction of Sagandoy Elementary School | 2,020,075.00 | SB #1, SEF 2018 | Mel-soc Construction | Completed | |
|
Buguias | Buyacaoan | Improvement of Tagpaya Peggueyna Farm to Market Road | 1,000,000.00 | General Fund 2019 | Tepanlu Construction and Supply | Completed | 1.) With suspension.
2.) Revised target date of completion: February 11, 2020. |
|
Buguias | Natubleng | Completion of Police Substation and Tourism Information / Assistance Center | 500,000.00 | General Fund 2019 | On Top Construction | Completed | |
|
Buguias | Loo | Rehabilitation of J207 Becaeg-Kitongan Farm to Market Road | 800,000.00 | LDRRMF Trust Fund CY 2019 | On Top Construction | Completed | |
|
Buguias | Amgaleyguey | Improvement of Km. 73 Amgaleyguey Proper Barangay Road | 500,000.00 | 20% PDF CY 2019 | Ebtitiwa General Engineering and Construction Services | Completed | |
|
Buguias | Loo | Construction of Alakan flood control, Dagdag-Nagubgubbang section | 3,000,000.00 | 20% PDF 2019 | BTCJR Constrution & Engineering Services | Completed | |
|
Buguias | Sebang | Improvement of Panig-an - Bot-oan Farm to Market Road | 500,000.00 | General Fund CY 2019 | JYP General Construction | Completed | |
|
Buguias | Sebang | Improvement of Panig-an - Tamangan, Sebang Farm to Market Road (Longilong Section) | 1,000,000.00 | SB #3, CY 2019 | On Top Construction | Completed | Actual date of completion: February 29, 2020. |
|
Buguias | Sebang | Improvement of Pasbol - Impugong Farm to Market Road | 2,500,000.00 | SB #1 CY 2019 | JYP General Construction | Completed | |
|
Buguias | Poblacion | Rehabilitation of Retaining Wall along Walayan-Naybo-Padang FMR | 1,000,000.00 | LDRRM Trust | ICO Construction Services | Completed | 1.) Revised target date of completion: February 3, 2020.
2.) Actual date of completion: February 22, 2020. |
|
Buguias | Catlubong | Improvement of Ponopon - Lusab Farm to Market Road | 1,000,000.00 | SB #3 CY 2019 | On Top Construction | Completed | |
|
Buguias | Buyacaoan | Construction of Gusadan Creek Flood Control | 1,000,000.00 | 20% PDF 2019 | | Completed | |
|
Buguias | Sebang | Construction of Waterworks System for Bacasen - Wakit Elementary School | 1,500,000.00 | SEF 2019 | JYP General Construction | Completed | |
|
Buguias | Buyacaoan | Construction of concrete pavement along Peggueyna FMR | 1,000,000.00 | SB # 01- CY 2019 | Tepanlu construction & Supply | Completed | 1.) Suspended on November 19, 2019;
2.) Resumed on March 5, 2020;
3.) Suspended again on March 17,2020 due to community quarantine;
4.) Resumed on September 12, 2020;
5.) Actual date of completion: September 16, 2020. |
|
Buguias | Poblacion | Improvement of insalong-lower naybo-bengad FMR | 3,000,000.00 | SB # 03- CY 2019 & 20% PDF | MXC Construction | On going | Suspended on March 17,2020 due to community quarantine.
|
|
Buguias | Poblacion | Improvement of Giweng - Kimpit - Amlimay Farm to Market Road | 1,000,000.00 | SB #3, CY 2019 | MXC Construction | Completed | Original target completion date: September 4, 2020. |
|
Buguias | Baculungan Sur | Improvement of Paneg-an - Obanga Farm to Market Road | 2,000,000.00 | 20% PDF & SB #3, CY 2019 | JYP General Construction | Completed | |
|
Buguias | Sebang | Improvement of Pasbol - Motyokna Farm to Market Road | 2,000,000.00 | SB #3, CY 2019 | JYP General Construction | Completed | |
|
Buguias | Loo | Improvement of Modayan Becaeg Kitongan Farm to Market Road | 1,000,000.00 | 20% PDF CY 2019 | Potpotan General Construction | Completed | |
|
Buguias | Bangao | Improvement of Cotcot - Bolinaca Farm to Market Road | 500,000.00 | General Fund CY 2020 | On Top Construction | Completed | |
|
Buguias | Sebang | Improvement Suyong - Malmalbeng Farm to Market Road | 1,000,000.00 | 20% PDF CY 2020 | On Top Construction | Completed | Original target date of completion: August 26, 2020 |
|
Buguias | Baculongan Sur | Improvement of Obanga - Dekan - Lengaoan Farm to Market Road | 500,000.00 | 20% PDF, CY 2020 | JNA Construction and Supply | Completed | Actual date of completion: October 10, 2020. |
|
Buguias | Natubleng | Concreting of Apanberang ABB - Upper Patkiaw Road | 1,000,000.00 | 20% PDF, CY 2020 | Potpotan General Construction | Completed | |
|
Buguias | Loo | School Improvement of Pan-ayaoan Elementary School, Pan-ayaoan, Loo | 1,000,000.00 | SEF CY 2020 | On Top Construction | Completed | |
|
Buguias | Amgaleyguey | Improvement of Junction 204 - Aguday Amgaleyguey Road | 500,000.00 | 20% PDF CY 2020 | | Completed | |
|
Buguias | Baculongan Norte | Improvement of JPMR-BPLS-PUGO-CUDAL-LAMMANGAN-JFMR OCDL (Tupinaw Section) | 1,000,000.00 | 20% PDF CY 2020 | Potpotan General Construction | Completed | |
|
Buguias | Loo | Improvement of JPMR - LANAS - TABA-AO Sumilalaw JPMR BPLS (Upper Togtogyon Section) | 1,000,000.00 | 20% PDF CY 2020 | Potpotan General Construction | Completed | |
|
Buguias | Amgaleyguey | Improvement of JFMR - NMS Baso Road | 1,500,000.00 | 20% PDF CY 2020 | BTCJR Construction and Engineering Services | Completed | Actual date of completion: January 17, 2021. |
|
Buguias | Abatan | Improvement of Hospital Canal at Northern Benguet District Hospital | 500,000.00 | 20% PDF CY 2020 | Potpotan General Construction | Completed | |
|
Buguias | Baculongan Norte | Improvement of Pugo Farm to Market Road | 1,000,000.00 | 20% PDF CY 2020 | On Top Construction | Completed | |
|
Buguias | Sebang | Improvement of Panig-an Tamangan Farm to Market Road (Suyong Section) | 1,000,000.00 | 20% PDF CY 2020 | On Top Construction | Completed | Actual date of completion: January 12, 2021. |
|
Buguias | Baculungan Sur | Improvement of Man-asok Kaula-an to Sabeng Anito Farm to Market Road | 1,000,000.00 | PDF CY 2020 | On Top Construction | Completed | |
|
Buguias | Poblacion | Improvement of Open Gym | 500,000.00 | General Fund CY 2020 | Wacaden Construction | Completed | |
|
Buguias | Loo | Construction of Pusong Flood Control | 500,000.00 | 20% PDF CY 2020 | Potpotan General Construction | Completed | |
|
Buguias | Loo | Improvement of Togtogyon, Loo Road Section Farm to Market Road | 1,000,000.00 | 20% PDF CY 2020 | Potpotan General Construction | Completed | |
|
Buguias | Bad-ayan | Improvement along Bad-ayan - Manhuyhoy Provincial Road | 5,000,000.00 | 20% PDF 2019 | JYP General Construction | Completed | |
|
Buguias | Amlimay | Improvement of Guioeng Kimpit FMR, Amlimay, Buguias, Benguet | 200,000.00 | SB#02CY2016-GF Non Office | Juricmarc Construction | Completed | |
|
Buguias | Catlubong | Construction of Padang - Palakad Footpath in Catlubong | 350,000.00 | SB # 2-2016, GF | On Top Construction | Completed | |
|
Buguias | Sebang | Construction of Tamangan - Wakit - Bacasen Primary School Gymnasium, Construction of Bacasen - Wakit Elementary School Gymnasium (Phase 2) | 5,000,000.00 | 20% PDF CY 2016 SB No. 2 CY 2016 | JYP General Construction | Completed | final payment - a) const of tamangan-wakit-bacasen P/S gym, sebang (phase I); b) const of bacasen wakit E? gym (phase II) @ sebang |
|
Buguias | Baculungan Sur | Improvement Along Palinta-Ang-Abbao FMR, Baculungan Sur | 1,000,000.00 | GF 2019 | On Top Construction | Completed | Project Engineer: Arthur P. Banasan
QC Representative: Engr. Teofilo Lacaden |
|
Buguias | Baculungan Sur | Improvement along Bad-ayan - Balintag -Deckan - BPI Baculungan Sur, Buguias, Benguet (156 Malsema Creek Riprap) Buguias, Benguet | 1,000,000.00 | SB # 3 2019 | Potpotan General Construction | Completed | Project Engineer: Arthur P. Banasen
Quality Control Representative : Engr. Teofilo Lacaden |
|
Buguias | Abatan | Construction of Concrete Pavement of Nakiangan FMR to the Turning Point | 400,000.00 | 20% PDF CY 2015 | hgw=3 engineering & construction/hilbert willie | Completed | For Post Inspection |
|
Buguias | Baculongan Sur | Completion of Box Culvert at Wakallan Creek along Balintag-Dekkan-Nakga-an Road | 250,000.00 | 20% PDF CY 2015 | jyp general construction/yonie palonan | Completed | |
|
Buguias | Catlubong | Construction of Padang Footpath (Phase 1) | 100,000.00 | 20% PDF CY 2015 | On Top Construction/ Thomas R. Palileng Sr. | Completed | |
|
Buguias | Sebang | Construction of Riprap (Protective Wall) at Kamanbagang FMR | 800,000.00 | 20% PDF CY 2015 | Random Builders | Completed | |
|
Buguias | Sebang | Improvement of Paneg-an - Takadang - Tamangan FMR | 400,000.00 | 20% PDF CY 2016 | JYP General Construction | Completed | Completed - January 20, 2017
project under cluster "C": a) improvement of Paneg-an-Takadang-Tamangan FMR in Sebang b) Improvement of Panig-an-Tamangan FMR in Sebang, Bugias |
|
Buguias | Baculongan Sur | Completion of Maselselne Footbridge | 350,000.00 | 20% PDF CY 2016 | on top construction/ thomas palileng | Completed | Project Completed with underrun.
project contract under cluster "B" a) completion of Maselselne Footbridge at Buculungan, Bugias b)construction of Sebseb Flood Control at Buculungan Norte, Bugias, Benguet |
|
Buguias | Baculongan Norte | Construction of Sebseb Flood Control | 500,000.00 | 20% PDF CY 2016 | on top construction/ thomas palileng | Completed | Completed - January 20, 2017, Project completed with LD.
project contract under cluster "B" a) completion of Maselselne Footbridge at Buculungan, Bugias b)construction of Sebseb Flood Control at Buculungan Norte, Bugias, Benguet |
|
Buguias | Sebang | Improvement of Pasbol - Motyokna - Mankaet FMR | 1,000,000.00 | 20% PDF CY 2016 | JYP General Construction | Completed | Completed - January 30, 2017
contract under cluster "B" projects with same funding source but different project titles. a)improvement and extension of makaet-motyokna fmr, sebang buguias benguet. b)improvement of p |
|
Buguias | Baculongan Sur | Improvement Along Bad-ayan - Obanga (Paing Crossing) | 1,000,000.00 | 20% PDF CY 2016 | JYP General Construction | Completed | Completed - February 3, 2017 |
|
Buguias | Baculongan Norte | Improvement of Sumill - Palaan FMR | 150,000.00 | 20% PDF CY 2016 | Mel-Soc Construction | Completed | Completed - January 10, 2017
clustered a project - a)imp of sumili-palaan FMR; b) const of calamagan-baglaw pathway; c)const of padang-palakad footpath @ buguias, benguet |
|
Buguias | Calamagan | Construction of Calamagan - Baglaw Pathway | 100,000.00 | 20% PDF CY 2016 | mel-soc construction/engr. marveluz patian | Completed | Completed - January 5, 2017
clustered a project - a)imp of sumili-palaan FMR; b) const of calamagan-baglaw pathway; c)const of padang-palakad footpath @ buguias, benguet |
|
Buguias | Catlubong | Construction of Padang - Palakad Footpath | 500,000.00 | 20% PDF CY 2016 | mel-soc construction/engr. marveluz patian | Completed | Completed - January 20, 2017, deducted PHP 500.00 due to the substandard billboard.
clustered a project - a)imp of sumili-palaan FMR; b) const of calamagan-baglaw pathway; c)const of padang-palakad footpath @ buguias, benguet |
|
Buguias | Catlubong | Improvement of Bot-oan Elementary School Grounds | 1,000,000.00 | 20% PDF CY 2016 | Donato Sakiwat Construction | Completed | Completed February 14, 2016, revised target completion date to March 5, 2017 |
|
Buguias | Amgaleyguey | Improvement of Katodtoda FMR in Amgaleyguey | 500,000.00 | 20% PDF CY 2016 | JYP General Construction | Completed | Completed - January 23, 2017 |
|
Buguias | Baculongan Norte | Construction of Multi-purpose Building (Additional), Baculongan Norte | 700,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Completed on April 26, 2017 |
|
Buguias | Abatan | Completion of Buguias Federation Senior Citizen's Association Multi-Purpose Building, Completion of Buguias Federation Senior Citizen's Association MPB Phase II | 2,000,000.00 | 20% PDF CY 2016 | JYP General Construction | Completed | Satisfactorily Completed with LD. Revised target completion date to May 6, 2017
A)completion of buguias federation senior citizen ass'n. multi-purpose bldg. B)completion og Buguias federation ass'n multi-purpose bldg. phase II @ abatan buguias |
|
Buguias | Bangao | CLUSTER: Improvement of Halsema - Gulodan FMR at Bangao | 650,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Clustered b) Control No.: 02-16-00057 - On Top Construction
Completed on July 1, 2017 |
|
Buguias | Loo | Construction of Loo Elementary School Athletic Oval Retaining Wall | 850,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | CLUSTERED b) Control No. 02-16-00063 c) 02-16-00056- On Top Construction
Clustered "H" Projects - a) const of Loo E/S athletic Oval Retaining Wall @ Loo, Buguias; b)impv't of Obanga Day Care Center Grounds @ Baculungan Sur, Buguias |
|
Buguias | Baculongan Sur | Improvement of Obanga Day Care Center Grounds | 850,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | CLUSTERED- a) Control No.: 02-16-00055 b) 02-16-00063 - On Top Construction
Completed on June 19, 2017 |
|
Buguias | Poblacion | Improvement of Asinan Creek and Hot Spring | 650,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Clustered a) Control No.: 02-16-00054- On Top Construction Completed on June 25, 2017 |
|
Buguias | Baculongan Norte | Improvement of Lam-ayan FMR | 600,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Clustered b) Control No.: 02-16-00059 - On Top Construction
Completed on June 16, 2017 |
|
Buguias | Baculongan Norte | Construction of Sebseb - Takadang Creek Flood Control | 600,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Clustered a) Control No.: 02-16-00058 - On Top Construction
Completed on June 23, 2017 |
|
Buguias | Amlimay | Construction of Tonglo Domestic Water Supply | 200,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Revised target completion date to November 24, 2017 |
|
Buguias | Amlimay | Extension/Improvement of Damang - Besbes FMR | 500,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Completed and post inspected on April 4, 2018 |
|
Buguias | Amgaleyguey | Construction of Riprap along Nansabatan - Baso FMR | 400,000.00 | 20% PDF CY 2016 | Bosongan Construction | Completed | |
|
Buguias | Loo | Construction of Baybay Footbridge | 850,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | CLUSTERED- a) Control No.: 02-16-00055 C) 02-16-00056 - On Top Construction |
|
Buguias | Catlubong | Improvement / Extension of Abatan - Gatiley Luboy FMR | 1,000,000.00 | 20% PDF CY 2016 | ICO Construction | Completed | Temporarily suspended November 6, 2017 pending issuance of CNC from DENR. |
|
Buguias | Poblacion | Opening of Lower Naybo - Benged FMR, Cayabyab | 1,000,000.00 | 20% PDF CY 2016 | Hillstone Builders | Completed | 75% Completed - Total Cost Incurred PhP 746,153.25 as of April 30, 2018 |
|
Buguias | Amlimay | Improvement of Guioeng - Kimpit FMR | 500,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Completed on December 16, 2017 |
|
Buguias | Catlubong | Improvement of Ponopon-Lusab FMR | 500,000.00 | 20% PDF CY 2016 | SEJ Construction and Aggregates | Completed | |
|
Buguias | Catlubong | Improvement of Wallayan-Abbatan FMR | 1,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Amgaleyguey | Improvement of Polis Kiok Road | 100,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Baculongan Sur | Improvement of Bad-ayan E/S Ground | 200,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Natubleng | Construction of Concrete Footpath, Lamut | 100,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Amgaleyguey | Amgaleyguey FMR | 1,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Abatan | Improvement of Bauknit FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Baculongan Sur | Improvement of Balintag - Aligan FMR | 1,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Sebang | Improvement of Paneg-an FMR | 1,500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Baculongan Norte | Improvement of Lagan - Naduguan FMR | 1,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Loo | Improvement along Loo-Modayan-Kitongan FMR | 800,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Baculongan Sur | Improvement of Nangodey - Baney FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Buyacaoan | Improvement of Tablaan - Godogodan FMR at Bekes | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Buyacaoan | Improvement of Bayoyo FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Abatan | Improvement of Galudan FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Baculongan Sur | Improvement of Sinto - Lamagan FMR | 500,000.00 | 20% PDF CY 2016 | JYP Construction | Completed | Cluster "A" - JYP Construction a) Control No. 02-16-00243 b) Control No. 02-16-00234 |
|
Buguias | Bangao | Construction of Labayan Vehicular Bridge | 2,000,000.00 | 20% PDF CY 2016 | | Completed | with liquidated damages |
|
Buguias | Sebang | Improvement of Guipadan - Pasbol FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Sebang | Improvement of Pasbol - Ibisan FMR | 100,000.00 | 20% PDF CY 2016 | JYP Construction | Completed | Cluster "A" - JYP Construction |
|
Buguias | Amlimay | Construction of Barangay Multi-Purpose Hall Comfort Room | 500,000.00 | 20% PDF CY 2016 | JuricMarc Construction | Completed | |
|
Buguias | Baculongan Norte | Construction of Pugo Day Care Center Baculongan Norte | 1,200,000.00 | 20% PDF CY 2016 | HGW=3 Engineering & Construction | Completed | 1) 2 suspensions
2) 100% Completed
3) Revised target date completion - October 19, 2018 |
|
Buguias | Lengaoan | Improvement of Pilando - Igang Footpath | 150,000.00 | 20% PDF CY 2016 | | Completed | Completed with LD |
|
Buguias | Buyacaoan | Improvement of Northern Benguet District Hospital Kitchen, Bekes, Buyacaoan, Buguias, Benguet | 300,000.00 | 20% PDF - 2016 | AIP Construction | Completed | |
|
Buguias | Poblacion | Improvement of Bolo - Tocdo FMR | 500,000.00 | 20% PDF CY 2017 | ICO Construction | Completed | Completed on December 4, 2017 |
|
Buguias | Bangao | Improvement of Cotcot - Labayan FMR | 500,000.00 | 20% PDF CY 2017 | On Top Construction | Completed | Completed on December 2, 2017 |
|
Buguias | Loo | Rehabilitation of JNR Modayan - Kitongan FMR | 500,000.00 | 20% PDF CY 2017 | HGW=3 Engineering & Construction | Completed | Completed on November 22, 2017 with under run |
|
Buguias | Buyacaoan | Construction of Flood Control at Gusadan (a,b,c,d) | 2,400,000.00 | 20% PDF CY 2017 | Kalahan General Construction and Supply | Completed | Completed on December 10, 2017 |
|
Buguias | Lengaoan | Improvement of Beling - Paingan FMR | 500,000.00 | 20% PDF CY 2017 | | Completed | Completed on December 15, 2017 |
|
Buguias | Baculongan Sur | Improvement along Bad-ayan - Cayapas Road at Lamangan Section | 500,000.00 | 20% PDF CY 2017 | | Completed | Completed on November 27, 2017 |
|
Buguias | Natubleng | Construction of Lamut Flood Control | 500,000.00 | 20% PDF CY 2017 | | Completed | Completed on December 26, 2017 |
|
Buguias | Catlubong | Improvement of Bot-oan - Ponopon FMR | 500,000.00 | 20% PDF CY 2017 | Juricmarc Construction | Completed | For post inspection |
|
Buguias | Sebang | Improvement of Mankaet-Pasbol FMR (Extension) | 500,000.00 | 20% PDF CY 2017 | Random Builders | Completed | Completed on February 26, 2018 |
|
Buguias | Buyacaoan | Construction of flood control, Gusadan | 500,000.00 | 2017 20% PDF | MacGat Construction | Completed | Completed: 07/18/2018 with 1 suspension
Revised target date of completion: 07/24/2018 |
|
Buguias | Bangao | Improvement of Loading Platform-Quarantine Checkpoint Located at Cotcot, Bangao, Buguias, Benguet | 300,000.00 | 20% PDF - 2017 | On Top Construction | Completed | |
|
Buguias | Baculongan Sur | Completion of Obanga CDC Building | 700,000.00 | 20% PDF 2017 | MACGAT Construction | Completed | Completed, Rough Phase. |
|
Buguias | Amlimay | Completion of Dagway Box Culvert | 500,000.00 | 20% PDF 2017 | SEJ Construction | Completed | |
|
Buguias | Calamagan | Construction of Camanbeey - Calamagan Road Pavement/Tirepath | 500,000.00 | 20% PDF - 2017 | JYP Construction | Completed | |
|
Buguias | Abatan | Improvement of Halsema - Upper Nakiangan FMR,Abatan,Buguias,Benguet | 500,000.00 | 20% PDF - 2018 | NAIR Construction | Completed | Completed with LD |
|
Buguias | Loo | Improvement of Loo-Panayaoan FMR, Loo, Buguias | 250,000.00 | 20% PDF - 2018 | MACGAT Construction | Completed | |
|
Buguias | Baculongan Sur | Improvement along Nakagang-Sayangan-Beleng-Paing,Baculungan Sur | 1,000,000.00 | 20% PDF - 2018 | MACGAT Construction | Completed | Revised Target Date=08/12/2018. 1 Suspension
|
|
Buguias | Loo | Improvement of Nabellang (Nagutikan Section) | 1,500,000.00 | 20% PDF 2018 | | Completed | |
|
Buguias | Baculungan Sur | Construction of Obanga Drainage Canal (Bad-ayan - Obanga - Paing FMR) | 1,000,000.00 | 20% PDF 2018 | JYP Construction | Completed | |
|
Buguias | Abatan | Improvement of Hospital Building and Annexes:Construction of Dental Room with Annexes,Construction of Gen. Expert Room,Abatan,Buguias | 1,800,000.00 | 20% PDF-2018 | AIP Construction | Completed | |
|
Buguias | Amgaleyguey | Completion of Km. 73 Multi-Purpose Hall, Amgaleyguey | 1,500,000.00 | 20% PDF 2018 | Drichloui Construction | Completed | |
|
Buguias | Baculungan Sur | Improvement along Bad-ayan - Manhuyuhuy Provincial Road | 5,000,000.00 | 20% PDF - 2018 | Drichloui Construction | Completed | Completed on June 24, 2019 with liquidated damages
|
|
Buguias | Baculungan sur | Rehabilitation of Nakagang-Sayangan-Beleng-Paing-Obanga FMR | 600,000.00 | 20% PDF-2019 | Macgat Construction | Completed | |
|
Buguias | Loo | Slope Protection and Improvement of Panayaoan - Loo Barangay Road | 1,000,000.00 | 20% PDF 2019 | HGW=3 Engineering and Construction | Completed | |
|
Buguias | Buyacaoan | Improvement of Bekes - Bayoyo FMR, Buyacaoan | 500,000.00 | 20% PDF 2019 | Macgat Construction | Completed | |
|
Buguias | Poblacion | Improvement of Posel-Demang FMR, Poblacion, Buguias | 500,000.00 | 20% PDF 2019 | Macgat Construction | Completed | |
|
Buguias | Poblacion | Improvement of Insalong-Padongay FMR | 1,000,000.00 | 20% PDF 2019 | BTCJR Construction and Eng'g Services | Completed | |
|
Buguias | Poblacion | Improvement of Sidel Balakbak-Nilawitan FMR | 500,000.00 | 20% PDF 2019 | On Top Construction | Completed | |
|
Buguias | Lengaoan | Construction of Gymnasium at Lengaoan - Waking Elementary School | 5,000,000.00 | 20% PDF CY 2016 PSBF CY 2016 | Almond Engineering and Construction | Completed | Completed on June 9, 2017 |
|
Buguias | Loo | Construction of Taba-ao Waterworks System at Patpat | 100,000.00 | SB No. 2 CY 2014 | | Completed | For post inspection |
|
Buguias | Abatan | Improvement of Buguias Federated Senior Citizen's Building Located at Abatan | 100,000.00 | SB No. 2 CY 2014 | Juricmarc Construction | Completed | |
|
Buguias | Loo | Improvement of Lanas - Taba-ao - Nagutikan FMR | 150,000.00 | SB No. 2 CY 2016 GF | | Completed | Completed on December 21, 2017 |
|
Buguias | Catlubong | Construction of Bekes-Palakad Tirepath at Bekes-Palakad | 500,000.00 | SB No. 5 CY 2015 | Mel-Soc Construction | Completed | Revised target completion date on April 16, 2017. Deducted PhP 500.00 due to substandard billboard. |
|
Buguias | Buyacaoan | Cementing of Tirepath at Duntog | 300,000.00 | SB No. 5 CY 2015 | | Completed | Completed on December 12, 2017 |
|
Buguias | Amgaleyguey | Concrete Tirepathing of Dangwa FMR at Guiwe | 300,000.00 | SB No. 5 CY 2015 GF | | Completed | Completed on December 15, 2017 |
|
Buguias | Catlubong | Wallayan-Abbatan Road Construction | 1,000,000.00 | SB No. 5 CY 2015 | | Completed | |
|
Buguias | Abatan | Construction of Concrete Riprap along Gal-udan - Abatan Access Road | 150,000.00 | SB No. 5 CY 2015 | Mel-Soc Construction | Completed | |
|
Buguias | Loo | Puputak - Beka Road Construction | 1,000,000.00 | SB No. 5 CY 2015 | | Completed | |
|
Buguias | Sebang | Repair of Alapang - Lengaoan Footbridge | 300,000.00 | SB No. 2 CY 2016 GF | On Top Construction | Completed | Completed on March 6, 2017 |
|
Buguias | Sebang | Improvement of Pasbol - Ibisan in Sebang | 300,000.00 | SB No. 2 CY 2016 | SEJ Construction | Completed | Completed on March 7, 2017 |
|
Buguias | Catlubong | Improvement of Ponopon - Lusab FMR (Additional) | 500,000.00 | SB No. 2 CY 2016 | SEJ Construction | Completed | Completed on March 20, 2017 |
|
Buguias | Poblacion | Improvement of Padang - Naytoyab FMR | 2,000,000.00 | SB No. 2 CY 2016 | | Completed | Completed on March 18, 2017 |
|
Buguias | Baculongan Norte | Road Improvement at Pugo - Yuko-an Section | 800,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on March 28, 2017 |
|
Buguias | Poblacion | Construction of Pavement at Bolo - Tocdo - FMR at Poblacion | 1,000,000.00 | SB No. 2 CY 2016 | | Completed | |
|
Buguias | Catlubong | Improvement of Mansoysoy - Ambanglo FMR | 1,000,000.00 | SB No. 2 CY 2016 | | Completed | Project Completed with underrun and Liquidated Damages |
|
Buguias | Baculongan Norte | Improvement along Puo - Apunan - Ketang FMR | 500,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on September 22, 2017 |
|
Buguias | Amgaleyguey | Construction of Tirepath Junction Polis - Akiki FMR | 500,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on August 7, 2017 |
|
Buguias | Amgaleyguey | Construction of Basketball Court at Sagandoy Elementary School (Phase 2) | 250,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on August 16, 2017 with liquidated damages |
|
Buguias | Loo | Construction of Balakbak - Magubgubang Flood Control at Pusong | 500,000.00 | SB No. 2 CY 2016 | | Completed | Completed on September 22, 2017 |
|
Buguias | Bangao | Road Improvement at Macascasa | 500,000.00 | SB No. 2 CY 2016 | | Completed | Completed on September 26, 2017. |
|
Buguias | Bangao | Construction of Pavement at Amdodon FMR, Tinapan Section | 300,000.00 | SB No. 2 CY 2016 | | Completed | Completed on September 26, 2017. |
|
Buguias | Calamagan | Tirepathing at Palonsay | 400,000.00 | SB No. 2 CY 2016 | | Completed | Completed on September 12, 2017 |
|
Buguias | Calamagan | Construction of Comfort Room for Calamagan Elementary School | 400,000.00 | SB No. 2 CY 2016 | | Completed | Revised project completion date to September 25, 2017 |
|
Buguias | Sebang | Improvement of Panig-an - Butiki - Tamangan FMR | 500,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on September 9, 2017
Clustered E1 Project, a)imp of panig-an - butiki - tamangan FMR, Buguis (Add'l) @ Sebang, Buguias, Benguet |
|
Buguias | Amlimay | Improvement of Dagway - Toplac Waterworks System | 300,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on December 30, 2017 |
|
Buguias | Poblacion | Construction of Kiosk at Poblacion | 50,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on December 13, 2017 |
|
Buguias | Poblacion | Improvement of Sabyatan - Tocdo - Nilawitan FMR | 1,000,000.00 | SB No. 2 CY 2016 | ICO Construction | Completed | Completed on January 21, 2018 |
|
Buguias | Bangao | Road Improvement at Camanggaan, Natugtugan | 500,000.00 | SB No. 2 CY 2016 GF | ICO Construction | Completed | Completed on February 26, 2018 |
|
Buguias | Baculongan Norte | Ground Improvement of Bano-oy Elementary School | 500,000.00 | SB No. 2 CY 2016 | | Completed | Completed - December 30, 2017 For post inspection |
|
Buguias | Buyacaoan | Improvement of Day Care Center at Magmagaling | 450,000.00 | SB # 2 - 2016 | On Top Construction | Completed | |
|
Buguias | Poblacion | Construction of 2 Classroom Building for Enggay - Willie Primary School | 1,900,000.00 | SB No. 2 CY 2016 PSBF | HGW=3 Engineering & Construction | Completed | 1) Revised target completion date April 12, 2018 |
|
Buguias | Buyacaoan | Improvement of Day Care Center at Magmagaling | 450,000.00 | SB # 2 - 2016 | On Top Construction | Completed | |
|
Buguias | Catlubong | Construction of Waiting shed at Padang - Palakad | 450,000.00 | SB # 2 - 2016 | On Top Construction | Completed | |
|
Buguias | Abatan | Improvement of Halsema - Nakiangan Barangay Road, Abatan, Buguias, Benguet | 500,000.00 | 20% PDF CY 2017 | Cliff Construction | Completed | |
|
Buguias | Poblacion | Improvement of the School Ground of Buguias Central School in Poblacion, Buguias, Benguet | 500,000.00 | SB No. 3 CY 2016 | SEJ Construction | Completed | |
|
Buguias | Abatan | Improvement of Hospital Building, NBDH Bekes | 800,000.00 | SB No. 2 CY 2016 | AIP Construction | Completed | 1) 1 Suspension
2) Revised Target Date of Completion is on November 11, 2018
3) Completed, 2nd Revised Target Date of Completion = 11/11/2018
|
|
Buguias | Baculongan Sur | Construction of Tirepath at Kelong Section along Balintag-Palintaang FMR | 200,000.00 | SB No. 2 CY 2016 GF | Macgat Construction | Completed | Completed on February 20, 2018 |
|
Buguias | Baculongan Sur | Construction of Box Culvert at Kandapig Creek | 500,000.00 | SB No. 1 CY 2017 | Macgat Construction | Completed | 1) 98.23% Completed - Total Cost Incurred PhP 498,093.66 as of April 30, 2018 - For post inspection
2) Revised Target Completion Date April 19, 2018 |
|
Buguias | Bangao | Construction of Vegetable Processing Center | 3,200,000.00 | SB No. 1 CY 2017 | AIP Construction | Completed | Revised target date of completion: 07/09/2018
2 suspensions |
|
Buguias | Baculongan Sur | Improvement along Balintag - Teguing - Palintaang FMR | 500,000.00 | SB No. 2 CY 2016 | Macgat Construction | Completed | 1) 100% Completed - Total Cost Incurred PhP 497,216.36 as of April 30, 2018
2) Revised Target Completion Date May 2, 2018
3) For post inspection |
|
Buguias | Amlimay | Completion of Barangay Health Station (Clinic) Amlimay,Buguias,Benguet | 1,000,000.00 | SB # 01-2017 | Pulicay Grandsons Construction | Completed | |
|
Buguias | Buyacaoan | Construction of Salingao to Ikip Flood Control (Batbatoan Section) | 1,000,000.00 | SB no. 2-2017 | Juricmarc Construction | Completed | |
|
Buguias | Natubleng | Construction of Police Substation and Tourism Information and assistance Center at Natubleng (Additional) | 450,000.00 | SB # 1 - 2017 | On Top Construction | Completed | |
|
Buguias | Natubleng | Construction of Natubleng E/S Open Gym (Phase 1), Construction of Gym (Additional) Natubleng E/S, Construction of Gymnasium at Natubleng E/S | 5,000,000.00 | SB No. 4 CY 2015 GF, 20% PDF CY 2016, SEF CY 2016 | | Completed | Completed on March 27, 2017 |
|
Buguias | Amgaleyguey | Construction of Divsersion Canal and Open Tank Protected by Gabion | 835,000.00 | LDRRMF CY 2013 | | Completed | For Post Inspection |
|
Buguias | Bangao | Rehabilitation of Bailey Bridge, Lapalap | 330,000.00 | LDRRMF CY 2015 | On Top Construction | Completed | |
|
Buguias | Loo | Construction of Retaining Wall and Restoration of Concrete Pavement along Lanas- Taba-ao Farm to Market Road | 700,000.00 | LDRRMF 2016 | Drich Loui Construction | Completed | |
|
Buguias | Baculungan Sur | Rehabilitation along Bad-ayan-Manhuyohoy Provincial Road | 1,500,000.00 | LDRRMF 2016 | | Completed | |
|
Buguias | Catlubong | Construction of Drainage Canal along Padang - Mankilet FMR | 350,000.00 | LDRRMF CY 2016 | Macgat Construction | Completed | Revised target completion date (May 2, 2018).
Completed with 340,717.06 total cost incurred.
For post inspection |
|
Buguias | Abatan | Construction of Drainage Canal System and Concrete Retaining Wall Along the Sinking Section of the Central Business District Area, Buguias | 1,500,000.00 | LDRRMF 2018 | Wacaden Construction | Completed | |
|
Buguias | Baculongan Norte | Improvement of Bano-oy Elementary School of Baculongan Norte, Buguias | 780,000.00 | PSB No. 9 CY 2015 | | Completed | |
|
Buguias | Poblacion | Completion of Gymnasium for Stage and Bleachers of Buguias Central School in Central Buguias (Additional) | 780,000.00 | PSBF CY 2015 | Random Builders | Completed | Revised target completion date to October 1, 2017. |
|
Buguias | Abatan | Completion of School Building for Abatan Elementary School | 500,000.00 | PSBF CY 2016 | On Top Construction | Completed | For post inspection |
|
Buguias | Loo | Loo Farm to Market Road | 1,000,000.00 | 2015 SP Res. No. 15-377 Trust Fund | | Completed | |
|