La Trinidad Projects



Municipality Barangay Project Title Appropriation Source of Fund Contractor Status Remarks Actions
Municipality Barangay Project Title Appropriation Source of Fund Contractor Status Remarks Actions
La TrinidadWangalImprovement of Existing Cold Chain Building at the Benguet Cold Chain Project2,000,000.0020% PDF CY 2014 Resolution No. 2017-74Anitos ConstructionCompletedCompleted with change order.
La TrinidadWangalReconstruction of Walkway Shed from Main road to Benguet National High School, Benguet Sped Center and Benguet Sports Center Multi-Purpose Gym1,500,000.0020% PDF CY 2015Sharamelle Construction & Gen. Eng'gCompleted1) Completed with Liquidated Damages 2) Revised Target Date of Completion is on September 12, 2018
La TrinidadBetagCementing and Fencing with-in the PHO Compound1,700,000.00General Fund CY 2015 PHOSummerlin ConstructionCompletedCompleted on February 18, 2018
La TrinidadPoblacionConstruction of additional cell rooms at the Benguet Provincial Jail, Construction of 3 cell rooms at the Benguet Provincial Jail2,000,000.00General Fund CY 2015 PGO, General CY 2014 PGO JailAlmond Engineering and ConstructionCompletedDate of project completion
La TrinidadWangalConstruction of Equipment Shed at PEO1,000,000.00General Fund CY 2016 - PEOanitos construction/ marty manayosCompleted
La TrinidadWangalImprovement of PEO Perimeter Fence700,000.00General Fund - All Offices CY 2016EaJr De Leon Construction - Edwardo De Leon JrCompletedCompleted
La TrinidadBetagExtension of Provincial Water Analysis Laboratory, Phase I; PHO, La Trinidad Benguet700,000.00General Fund CY 2016RNAA BuildersCompleted
La TrinidadPuguisConstruction of Box Culvert at Lamtang200,000.00General Fund CY 2016Completed
La TrinidadWangalConstruction of Perimeter Fence, Wangal, La Trinidad, Benguet995,000.00General Fund All Offices CY 2017Sangin ConstructionCompletedCompleted with liquidated damages
La TrinidadPoblacionConstruction of Capitol Building II, 4th Floor15,000,000.00General Fund Non Office CY 2017 COBuganheirs Engineering ConstructionCompleted1) Ongoing with 78.06% completion as of January 2019 2) 1 Suspension 3) On Going w/ LD. Revised target date= 03/03/19.
La TrinidadWangalExtension/Improvement of PEO Building3,500,000.00General Fund All Offices CY 2017Buganheirs Engineering ConstructionCompletedcompleted on September 5, 2018
La TrinidadPoblacionImprovement of Capitol Main Building3,000,000.00General Fund CY 2017Sharamelle Construction and General EngineeringCompleted1) 1 Suspension 2) Revised Target Date of Completion is on October 12, 2018
La TrinidadPoblacionUpgrading of Provincial Jail Electrical System400,000.00General Fund - 2017 All OfficesOrganic ConstructionCompletedCompleted
La TrinidadBetagImprovement of Pharmacy and Installation of Cooling System and Ventilation1,100,000.0020% PDF CY 2017ADL ConstructionCompleted
La TrinidadWangalA.)Construction Of PCL-LNB Multi-Purpose Building(Phaseii), Wangal; B.) A.)Construction Of PCL-LNB Multi-Purpose Building(Phaseii), Wangal, La Trinidad, Benguet14,000,000.00General Fund (GF) 2018 / GF 2016 / GF 2017 Non-Office RNAA BuildersCompletedUpdate as of January 24, 2020.
La TrinidadPuguisImprovement of Lamtang FMR500,000.0020% PDF CY 2017Pulicay Grandson's ConstructionTerminatedFor Termination
La TrinidadBaliliConstruction of Drainage Canal with cover, Central Balili150,000.0020% PDF CY 2017Pulicay Grandson's ConstructionTerminatedFor termination
La TrinidadPoblacionImprovement and upgrading of Electrical System (PGSO)1,000,000.00General Fund CY 2017On Top ConstructionCompletedcompleted
La TrinidadBeckelConstruction of drainage canal at sitio sapsing497,958.15SB#2 2017Haight's ConstructionCompletedStill ongoing as of April 30, 2019
La TrinidadPoblacionConstruction of Capitol Entrance Rotunda Sculpture and Upgrading of Provincial Jail Electrical System800,000.00SB #1 CY 2017 & SB #2 CY 2015QPJ General Eng'g Construction and SupplyCompletedActual date of completion: April 23, 2021.
La TrinidadWangalPerimeter fencing of Benguet Sports Complex, Wangal (Phase I) ; Perimeter Fencing of Benguet Sports Complex (Phase II)5,000,000.00General Fund 2017 & General Fund 2018 PGSOSEJ Construction & AggregateCompleted
La TrinidadTawangImprovement of Boted Tawang FMR500,000.0020% PDF CY 2018Sangin General ConstructionCompleted
La TrinidadBeckelCompletion of Lamut Elementary School Perimeter Fence, Lamut, Beckel, LTB1,000,000.002018 GF- PEOPulicay Grandsons ConstructionCompletedCompleted and usable.
La TrinidadBeckelRoad improvement of Pagal Barangay Road2,000,000.0020% PDF 2018On Top ConstructionCompleted
La TrinidadWangalExtension of Benguet Indigenous People Building, Wangal, La Trinidad1,000,000.00General Fund 2018On Top ConstructionCompleted
La TrinidadWangalConstruction of Power House Benguet Cold Chain Project La Trinidad, Benguet500,000.00General Fund 2018Akip Construction & EnterpriseCompleted
La TrinidadBaliliRehabilitation of footpath with drainage at Mamaga, Balili, La Trinidad (starting from Guinodan's Residence)500,000.00LDRRMF 2018Hillstone BuildersCompletedInspection was done on March 19, 2019
La TrinidadPicoImprovement of POCNA Road1.,500,0002018 SB #2Malco Construction2CompletedCompleted and Geotag on October 3, 2019
La TrinidadWangalConstruction of Comfort Room with Lavatory (Cold Chain) at Wangtal,La Trinidad,Benguet1,615,000.00General Fund-2018Four Brothers ConstructionCompleted
La TrinidadPoblacionConstruction of Material Recovery Facility, Capitol, LTB210,000.00General Fund 2018Four Brothers ConstructionCompletedCompleted
La TrinidadPoblacionImprovement of the Provincial Library Building2,500,000.00General fund (All Offices) 2018Cialmar BuildersCompleted
La TrinidadPoblacionImprovement of Water Works System of Capitol Main Building, Legislative Building and Annexes (Phase I)500,000.00General Fund CY 2018Alber and Seven ConstructionCompleted
La TrinidadWangalConstruction of a New Automotive Building with Ground Improvement (Phase I)4,000,000.0020% PDF CY 2018LBJ ConstructionCompleted1.) Revised date of completion: February 25, 2020. 2.) Actual date of completion: February 14, 2020.
La TrinidadAmbiongImprovement of Ambiong Elementary School Perimeter Fencing500,000.00SEF CY 2018Efler Construction and EnterpriseCompleted
La TrinidadAmbiongImprovement of Ambiong Elementary School Open Gymnasium1,000,000.00SEF CY 2018Efler Construction and EnterpriseCompletedActual date of completion: June 7, 2021
La TrinidadWangalConstruction of PDRRM Office Building (Phase II)LDRRMF 2018CompletedDate completed: July 13, 2021
La TrinidadBahongConstruction of Retaining Riprap along upper Sadag Provincial Road (near Comiles Residence)1,500,000.00SB #1, CY 2017MACGAT ConstructionCompletedCompleted with Liquidated Damages (LD).
La TrinidadBetagConstruction of Extension of Provincial Water Analysis Laboratory (Phase II)1,000,000.00General Fund 2018Hillstone BuildersCompleted
La TrinidadPoblacionConstruction of Annex Building (Phase I); and Construction of Annex Building Capitol (Phase II)43,000,000.00SB #4 CY 2017; GF CY 2018; and SB#1 CY 2018Jomarcann General ConstructionCompletedActual date of completion: March 17, 2020.
La TrinidadPoblacionInstallation of Razor Barbed Wire400,000.00General fund 2019, PGO-JailHaight's ConstructionCompletedcompleted with slippage
La TrinidadBaliliRehabilitation of footpath and drainage canal along Gungabon Residence, Mamaga, Balili1,000,000.00General Fund CY 2019Rigne ConstructionCompletedActual completion: December 27, 2019
La TrinidadBahongImprovement along Bahong - Sadag Provincial Road4,000,000.0020% PDF CY 2019Efler Construction and EnterpriseCompleted
La TrinidadPuguisImprovement of Kibungan Village FMR500,000.0020% PDF - 2019Sangin General ConstructionTerminatedTerminated as of Jan 30, 2020.
La TrinidadPuguisImprovement of Kibungan Village Farm to Market Road500,000.0020% PDF, CY 2019Layad General Engineering, Construction & AggregatesCompletedActual date of completion: September 8, 2020.
La TrinidadWangalConstruction of Drainage Canal at the Benguet Sports Center3,000,000.00General Fund CY 2019MXC ConstructionCompletedActual date of completion: March 3, 2021.
La TrinidadTawangConstruction of Open Gymnasium at Tawang Elementary School4,000,000.00SEF - SB #2 CY 2019 CompletedDate of completion: May 21, 2021
La TrinidadWangalConstruction of Sidewalk with Railings and Fence along Stockfarm Road (near PDRRMO and Allied Building)1,500,000.00LDRRMF Trust FundMXC ConstructionCompletedActual date of completion: October 7, 2020.
La TrinidadAlapangConstruction of Flood Control at Alapang Proper (Sagubo Area towards Ogas Area)1,000,000.0020% PDF CY 2020Anitos ConstructionCompleted
La TrinidadTawangConstruction of footpath with railings near Bautista Area to Boted, Tawang500,000.00General Fund CY 2020QPJ General Engineering Construction and SupplyCompletedActual date of completion: November 14, 2020.
La TrinidadAlnoImprovement / Rehabilitation along Alno-Tuel-Balway Provincial Road2,000,000.00LDRRMF CY 2020Sandstream ConstructionCompletedActual date of completion: January 18, 2021
La TrinidadWangalPerimeter Fencing at Bahay Pag-asa1,500,000.00General Fund CY 2020CompletedDate completed: April 21, 2021
La TrinidadWangalImprovement of the Provincial DRRM Building500,000.00LDRRMF CY 2020CompletedDate completed: July 13, 2021
La TrinidadPoblacionConstruction of Provincial Jail MPB at the Capitol Compound1,000,000.00General Fund CY 2015 All Office, SB No. 9 CY 2015almond engineering and construction/ rogelio alimoCompleted
La TrinidadBaliliConstruction of Sidewalk Shed-Halsema Road to UCCP Church, Balili, La Trinidad, Benguet700,000.00SB No. 2 GF CY 2016SEJ Construction and AggregateTemporarily suspended1) The contractor submitted a letter for suspension due to the site issues 2) Suspended on April 30, 2018 because the BSU management is against the project since part of the structure to be put up will encroach their property. 3) Update as of June 2019
La TrinidadPoblacionImprovement of access road (phase II) at Windy Hill, Central Buyagan1,000,000.00SB #2 2018 General Fund PEOBTCJR Construction and Eng'g ServicesCompleted
La TrinidadBeckelInstallation of complete electrical system of Barangay Beckel Senior Citizens100,000.00SB#1 2018Haight's ConstructionCompletedInspection was done on March 1, 2019. Electrical wiring was completed but, the there is no connection yet with BENECO Power and electrical post and meter is not yet installed.
La TrinidadBeckelConstruction of Waterworks System, Beckel Community, Beckel, La Trinidad, Benguet400,000.0020% PDF - 2014Bemeda ConstructionCompleted
La TrinidadBetagConstruction of Hospital Waste Management Facility500,000.0020% PDF CY 2015almond engineering and construction/ rogelio alimoCompletedCompleted with approved Change Order.
La TrinidadWangalImprovement of BTS Building and Entrance Gate1,000,000.0020% PDF CY 2015Guava Construction / Evelyn F. Balag-eyCompletedCompleted - August 27, 2016
La TrinidadPuguisConstruction of 8x8x10 Water Tank at Paswek, Puguis, La Trinidad, Benguet200,000.0020% PDF 2015Four Brothers ConstructionCompleted
La TrinidadWangalConstruction of Multi-Purpose Shed for Horse Back Riding Area, Children's Park950,000.0020% PDF CY 2016On Top ConstructionCompletedCLUSTERED b) Control No.: 02-16-00110 - On Top Construction
La TrinidadBetagImprovement of EQA Laboratory at BeGH137,000.00 (clustered)20% PDF CY 2016ICO ConstructionCompletedcontract under cluster g: a) concreting of shilan-jappa brgy road, shilan, la trinidad; b) imp of eqa laboratory, begh, la trinidad
La TrinidadLubasImprovement of Sidewalk along Proper Lubas950,000.00 (clustered)20% PDF CY 2016On Top ConstructionCompletedCLUSTERED a) Control No.: 02-16-001016 - On Top Construction contract under cluster "O" projects - b)imp of sidewalk along proper lubas, L Trinidad; c)const of covered canal @ upper bayabas, pico, LTB
La TrinidadWangalImprovement of School Building at Benguet Technical School1,000,000.0020% PDF CY 2016Leo Heirs ConstructionCompleted
La TrinidadAmbiongConstruction of Footbridge at Lanas Creek, Takinan300,000.0020% PDF CY 2016Pulicay Grandson's ConstructionCompletedInput the accurate coordinates
La TrinidadPuguisFinishing of Waiting Lounge at CTS Puguis200,000.0020% PDF CY 2016JURICMARC CONSTRUCTIONCompleted
La TrinidadShilanImprovement along Shilan - Sagpawe Provincial Road1,000,000.0020% PDF CY 2016Drichloui ConstructionCompletedCompleted on March 26, 2017
La TrinidadAlnoConstruction of PCCP along Alno - Pangablan Provincial Road1,000,000.0020% PDF CY 2016Universal De Leon Construction and AggregatesCompleted
La TrinidadWangalImprovement along Wangal - Banengbeng Provincial Road3,500,000.0020% PDF CY 2016Cliff Construction and Aggregates, Junifer BoslengCompletedwith Liquidated Damages
La TrinidadBeckelImprovement along Beckel - Balangbang Provincial Road1,000,000.0020% PDF CY 2016Sej General Construction and Aggregates, Eric De LCompleted
La TrinidadBahongImprovement along Camp Dangwa - Bahong - Sadag Provincial Road1,000,000.0020% PDF CY 2016EaJr De Leon Construction, Edwardo De Leon JrCompleted
La TrinidadBahongConstruction of Flood Control at Tomay Creek1,000,000.0020% PDF CY 2016Illstone Builders, Hudson DepolioCompletedCompleted on September 19, 2016
La TrinidadShilanImprovement of Road in Balukas, Shilan1,000,000.0020% PDF CY 2016Sej Construction & Aggregates, Mr. Eric De LeonCompletedCompleted on September 26, 2016
La TrinidadShilanImprovement of Road at Besil-Safid700,000.0020% PDF CY 2016Babecor Builders/ Marcos P. BacoyCompletedCompleted on August 8, 2016
La TrinidadWangalConstruction of Perimeter Fence at Wangal Nursery250,000.00General Fund - All Offices CY 2016Anas ConstructionCompleted
La TrinidadPuguisConstruction of Drainage Canal at DSWD-Veterans Building500,000.0020% PDF CY 2016Drichloui ConstructionCompleted
La TrinidadShilanImprovement of Roads in Jappa - Shilan700,000.0020% PDF CY 2016Hillstone Builders, Hudson DepolioCompletedCompleted on October 13, 2016
La TrinidadAlnoConstruction of Concrete Fence at the Southwest Portion of the BeNHS Alno Annex150,000.0020% PDF CY 2016Hillstone BuildersCompletedCompleted on October 7, 2016
La TrinidadBeckelConstruction of Centralized Drainage Canal at Beckel200,000.0020% PDF CY 2016ICO ConstructionCompleted100% Completed as of April 3, 2018 with 199,474.44 Total Cost Incurred.
La TrinidadPuguisImprovement of Buhao Road in Puguis, La Trinidad, Benguet500,000.0020% PDF CY 2017SEJ Construction and AggregatesCompleted10% completed as of April 15, 2018 with 43,509.54 total cost incurred. (-) 3.95% slippage. Completed as of June 1, 2018
La TrinidadWangalFencing of School Perimeter with Ground Improvement at Benguet Technical School800,000.0020% PDF CY 2017Drichloui ConstructionCompletedCompleted on February 5, 2018.
La TrinidadShilanConcreting of Shilan - Jappa Barangay Road500,000.0020% PDF CY 2017CompletedCompleted on January 14, 2018
La TrinidadPoblacionImprovement of Drainage Canal at Upper Central Buyagan500,000.0020% PDF CY 2017ICO ConstructionCompletedCompleted on January 12, 2018 with liquidated damages.
La TrinidadBetagConstruction of Septic Tank Drainage at BeGH1,000,000.0020% PDF CY 2017RNAA BuildersCompleted
La TrinidadLubasFencing of La Trinidad National High School, Lubas500,000.0020% PDF CY 2017SEJ ConstructionCompleted100%Completed - Total Cost Incurred PhP 479,663.72 as of April 30, 2018
La TrinidadAlapangImprovement of Bahong Dapiting - Alapang BENECO Road500,000.0020% PDF CY 2017SEJ ConstructionCompletedCompleted on October 23, 2018
La TrinidadAlnoConstruction of Footpath with Railings from Elementary to National High School, Alno586,000.0020% PDF CY 2017DMCD Engineering and ConstructionCompletedCompleted with slippage on April 23, 2018
La TrinidadPuguisConstruction of Irrigation Tank at CTS, Puguis200,000.0020% PDF 2017JURICMARC CONSTRUCTIONCompleted
La TrinidadBinengImprovement of Sitio Kagiskis Barangay Road at Bineng, La Trinidad, Benguet500,000.0020% PDF 2017On Top ConstructionCompleted
La TrinidadWangalConstruction of 3rd Floor Roofing and Improvement of Buildings, Benguet Technical School, Wangal, La Trinidad2,500,000.0020% PDF 2017On Top ConstructionCompletedOngoing with 45.90% completion as of January 2019
La TrinidadBaliliCompletion of Shed From BSU Horticulture Along CHED, Ogas Store UCCP Church Balili, La Trinidad, Benguet500,000.0020% PDF 2017Haight's ConstructionTerminatedMutually terminated Recommended for reprogramming
La TrinidadWangalImprovement of Access Road and Site Development of Bahay Pag-asa Center Wangal5,000,000.0020% PDF 2018SEJ Construction & AggregateCompleted
La TrinidadWangalConstruction of PCCP with Drainage Canal at Provincial Housing Project,Phase II,Wangal2,000,000.0020% PDF-2018Pulicay Grandson's ConstructionCompleted
La TrinidadAmbiongConstruction of Concrete Perimeter Fence (Phase II) to Enclose the Ambiong Elementary School200,000.0020% PDF CY 2017CompletedOn-going with 85.08% accomplishment as of January 8, 2018 with liquidated damages.
La TrinidadBinengImprovement along La Trinidad - Capitol - Bineng Provincial road5,000,000.0020% PDF 2018Sangin Gen. ConstructionCompleted- Completed as of October 4, 2019. - 6 sections
La TrinidadBahongRehabilitation along Bahong-Sadag Provincial Road1,000,000.0020% PDF 2019SEJ ConstructionCompleted
La TrinidadBeckelImprovement along Beckel - Balangbang Provincial Road5,000,000.0020% PDF 2019Drichloui Construction (Roy M. Balay-odao)Completed
La TrinidadWangalGround Improvement and Completion of Indigenous Building500,000.00SB # 2 2020On Top ConstructionCompletedProject Engineer: Ceasar Wacay Geotagged by: J G. C
La TrinidadWangalRepair of PEO Building, Wangal, La Trinidad, Benguet1,000,000.002018 20% PDFLBJ ConstructionCompletedProject Engineer: Porter B. Camsol Geotagged by: Jeffrey G. Cabato
La TrinidadWangalImprovement of PEO Building/Extension Phase II (Planning ROW, Survey Section & Motor-pool Division6,500,000.00GSO-2019LBJ ConstructionCompletedProject Engineer: Porter B. Camsol Geotagged by: JC
La TrinidadWangalConstruction of Multi-purpose Building at Wangal2,000,000.0020% PDF CY 2016 General Fund CY 2015JCA Construction anfd Engineering ServicesTemporarily suspendedSuspended effective July 18, 2017 due to site problem. 1 suspension. Mutual Termination on process.
La TrinidadTawangConstruction of Senior Citizen's Building at Barangay Tawang1,600,000.0020% PDF CY 2015 , SB No. 2 CY 2015 CCO - 20% PDFLeo Heirs ConstructionCompletedBased from the picture taken on May 18, 2018, the building is not yet physically completed.
La TrinidadAmbiongImprovement of Gulon Road at Ambiong1,800,000.0020% PDF CY 2015, SB No. 5 CY 2015Drichloui ConstructionCompleted
La TrinidadPoblacionImprovement of Benguet Museum Building1,000,000.00SB No. 03 CY 2015 GFHaight's ConstructionCompleted1) Completed March 21, 2018 2) This project was suspended on December 1, 2017 to January 17, 2018
La TrinidadBeckelImprovement of Barangay Road at Pagal150,000.00SB No. 5 CY 2015 GFSEJ ConstructionCompleted75.43% Completed with under run.
La TrinidadBetagImprovement of Walkway at Benguet General Hospital500,000.00SB No. 1 CY 2015Balangcod ConstructionCompleted
La TrinidadBetagImprovement of Benguet General Hospital Building265,000.00SB No. 1 CY 2015Balangcod ConstructionCompleted
La TrinidadTawangImprovement of Tawang Viewdeck300,000.00SB No. 2 CY 2016Universal De Leon Construction and AggregatesCompletedWriting were found on the viewdeck
La TrinidadPuguisImprovement of Guadayan Road1,200,000.00SB No. 2 CY 2016RNAA BuildersCompleted
La TrinidadAmbiongConstruction of Perimeter Fence of Ambiong Elementary School200,000.00SB No. 2 CY 2016Universal De Leon Construction and AggregatesCompletedCompleted with liquidated damages
La TrinidadTawangImprovement of Cruz - Tawang Road500,000.00SB No. 2 CY 2016Universal De Leon Construction and AggregatesCompleted
La TrinidadTawangImprovement of Road from Barangay Hall to Cemetery500,000.00SB No. 2 CY 2016Completed
La TrinidadBeckelConstruction of Senior Citizen's Building (Phase II)800,000.00SB No. 5 CY 2015, GFICO ConstructionCompleted1) Completed 2) Suspended January 31, 2018 - March 21, 2018 3) Revised target date of completion = April 2, 2018
La TrinidadPoblacionCompletion of Fencing Jail Perimeter at PGO Jail200,000.00SB No. 2 CY 2016Completed
La TrinidadPoblacionImprovement of School Ground at La Trinidad Central School400,000.00SB No. 2 CY 2016RNAA builders, Roy k. KepesCompleted
La TrinidadBeckelRoad Improvement - Sapsing and Beckel (Phase II)500,000.00SB No. 2 CY 2016SEJ Construction and AggregatesTemporarily suspended1) Suspended Aug. 18, 2017; The Barangay officials and end users had requested for the mutual termination of this project to pave way for the preparation of a new program of work. 2) Update as of June 2018
La TrinidadBetagImprovement of Betag Road (Passing by INC Church)2,000,000.00SB No.1 CY 2017 GFBuganheirs Engineering ConstructionCompletedCompleted on June 26, 2018
La TrinidadWangalConstruction of Corridor and Upper Bleachers for the Multi-Purpose Gym at Benguet Sports Center416,000.00SB No. 1 CY 2017RNAA BuildersCompletedCompleted on February 23, 2018
La TrinidadWangalConstruction of Four Bathrooms (2 Male Bathrooms, 2 Female Bathrooms) and Laundry Area with Water Tank at Benguet Bahay Pag-asa Center La Trinidad, Benguet1,000,000.00SB # 1-2017NAIR Construction & EngineeringCompletedCompleted and usable.
La TrinidadBetagImprovement of Sewage Treatment Plant (Phase II), BeGH, Betag, La Trinidad, Benguet1,000,000.0020% PDF 2017AKIP Construction and EnterpriseCompleted1 suspension
La TrinidadPoblacionImprovement/ Installation of Roofing for the Third Floor of the Warehouse (DILG Office)300,000.00LDRRMF Trust fundHillstone BuildersCompleted
La TrinidadBinengImprovement along Capitol - Bineng Provincial Road1,500,000.00LDRRMF CY 2017SEJ ConstructionCompleted82.09% Completed - Total Cost Incurred PhP 1,230,086.50 as of March 2018
La TrinidadWangalImprovement/ Upgrading of PDRRM Equipment Shed Multi-purpose warehouseLDRRMF CY 2017Hillstone BuildersCompleted
La TrinidadPicoConstruction of Drainage Canal at Lower Capjaran - Obudan, Km. 4700,000.00LDRRMF, Trust FundHillstone BuildersCompletedcompleted
La TrinidadBeckelRehabilitation of Lamut Elementary School500,000.00PSBF CY 2016ICO ConstructionCompleted99.84% Completed with under run.
La TrinidadWangalConstruction of Multi-Purpose Gymnasium at the Benguet Sports Center (Phase VII), Wangal, La Trinidad4,993,676.18Trust Fund 2015 DILG PamanaAnitos construction / marty manayosCompletedPartial accomplishment (86.67..%)of his contract due on const. of multi-purpose gymnasium at benguet sports center (phase IV),wangal,la trinidad
La TrinidadBeckelConstruction of Gymnasium for Beckel Elementary School in Beckel, La Trinidad (additional)1,000,000.00SEF CY 2016Completed
La TrinidadPoblacionRepair of Benguet National High School Slope Protection and Drainage500,000.00SEF CY 2017ICO ConstructionCompletedCompleted on January 26, 2018 with liquidated damages
La TrinidadPoblacionRepair of Buyagan Elementary School Building150,000.00SEF CY 2017Ico Construction Services, Jerico PalangdanCompletedcontract under cluster h: a) repair of benhs slope protection and drainage, wangal; b) repair of buyagan e/s building , poblacion, la trinidad
La TrinidadWangalRepair of SPED Center Slope Protection in Wangal500,000.00SEF CY 2017Guardian ConstructionCompleted1) Completed 2) Suspended effective February 27, 2018 pending preparation and approval of Change Order No. 01
La TrinidadWangalConstruction of Covered Court for Regional Science High School, Wangal, La Trinidad Benguet1,500,000.00SEF CY 2017SEJ ConstructionCompleted
La TrinidadShilanRepair of Pagal Elementary School, La Trinidad, 3 Classrooms8000,000.00SEFOn Top ConstructionCompletedCompleted and usable.
La TrinidadShilanRehabilitation of Drainage Canal along Shilan - Sagpawe Provincial Road1,960,000.00SLRF CY 2015ICO ConstructionCompletedwith liquidated damages
La TrinidadWangalRehabilitation of Drainage Canal along Buyagan - Wangal Banengbeng Provincial Road2,438,073.40SLRF CY 2015Cliff ConstructionCompletedwith liquidated damages
La TrinidadBahongRehabilitation along Bahong - Sadag Provincial Road2,340,000.005% Calamity Fund 2015 and LDRRMF 2015EaJr De Leon Construction/ Edwardo De Leon JrCompletedCompleted with Liquidated damages equivalent to 6,429.48
La TrinidadAmbiongConstruction of of Open Gymnasium Phase II Ambiong Elementary School4,000,000.00GF 2017NORBANO BUILDERSCompletedBy J G. C
La TrinidadWangalConstruction of Comfort Rooms With Lavatory (Cold Chain)1,500,000.00GF 2018Four Brothers ConstructionCompletedby JC
La TrinidadWangalConstruction of Multi-Purpose Gymnasium at the Benguet Sports Center (Phase VIII)4,000,000.00SNAPB 2015 Trust FundCompleted
La TrinidadBeckelConstruction of Slope Protection at Beckel8,013,000.00PRDP 2016APB ConstructionCompletedCompleted on March 23, 2018 with liquidated damages and under run
La TrinidadAlnoConstruction of Slope Protection at Alno1,763,000.00PRDP 2016Rocky 5G BuildersCompleted1) Completed June 30, 2018 with liquidated damages 2) Suspended on December 1, 2017 due to Variation Change Order No. 2.
La TrinidadAlapangConstruction of Slope Protection at Alapang4,086,000.00PRDP 2016Rocky 5G BuildersCompletedCompleted September 6, 2017
La TrinidadPuguisImprovement along Pico - Stockfarm Provincial Road6,994,870.60PCF DILG 2015jca general construction and engineering servicesCompletedwith under run
La TrinidadWangalConstruction of PDRRMF Office Building Located at Wangal4,000,000.00Performance Challenge Fund (PCF) 2016Remnant BuildersCompletedCompleted on May 24, 2018 with 3,994,112.23 total cost incurred