Tuba | Yagyagan | Improvement along Yagyagan-Ampusa Provincial Road | 3,500,000.00 | 20% PDF 2019 | Pulicay Grandsons | Completed | |
|
Sablan | Banangan | Improvement of FBB AWASAI Water Works System | 2,500,000.00 | 20% PDF CY 2018 | Anas Construction | Completed | |
|
Kapangan | Lomon | Improvement of Lomon - Kapangan Provincial Road | 4,600,000.00 | 20% PDF CY 2019 | | Completed | |
|
Itogon | Ampucao | Improvement of FMR at Pasiday-Tocod-Sigsiglay, Ampucao, Itogon | 1,000,000.00 | 20% PDF 2019 | | Completed | |
|
Itogon | Tinongdan | Construction of Shed Leading Towards the Emergency Room | 1,000,000.00 | General Fund - All Offices CY 2016 | Reko Gen. Konstruct | Completed | Completed on June 7, 2018. |
|
Buguias | Amlimay | Opening of Bana-ao - Mangakew FMR | 500,000.00 | General Fund CY 2014 | Jamil Sean Construction | Completed | Completed with underrun and LD |
|
La Trinidad | Wangal | Improvement of Existing Cold Chain Building at the Benguet Cold Chain Project | 2,000,000.00 | 20% PDF CY 2014 Resolution No. 2017-74 | Anitos Construction | Completed | Completed with change order.
|
|
Itogon | Tinongdan | Construction of Guardhouse at Itogon District Hospital | 180,000.00 | SB No. 2 CY 2015 & 2015 20% PDF | Bemada Construction | Completed | completed and usable |
|
La Trinidad | Wangal | Reconstruction of Walkway Shed from Main road to Benguet National High School, Benguet Sped Center and Benguet Sports Center Multi-Purpose Gym | 1,500,000.00 | 20% PDF CY 2015 | Sharamelle Construction & Gen. Eng'g | Completed | 1) Completed with Liquidated Damages
2) Revised Target Date of Completion is on September 12, 2018 |
|
Bokod | Ambuklao | Construction of Comfort Rooms at Patadan, Banao, Ambuklao, Bokod, Benguet | 400,000.00 | General Fund - 2015 | Pulicay Grandsons Construction | Completed | |
|
Sablan | Banangan | Construction of Keddeng - Batag Footpath | 150,000.00 | SB #5, CY 2015 | Anas Construction | Terminated | Suspended as of October 2018.
Mutual termination. |
|
Tuba | San Pascual | Construction of Perimeter and divisional fence | 1,000,000.00 | 20% PDF 2015 | DMCD Engineering and Construction | Completed | Ongoing. Revised Target Date = 06/27/2019. Issued w/ Notice of Pre-termination.Show cause letter was submitted by the contractor for verification.
|
|
La Trinidad | Tawang | Improvement of Barangay Hall Ground (Basketball Court) | 100,000.00 | General Fund 2015 Non Office | AKIP Construction and Enterprises | Completed | |
|
Tuba | Taloy Sur | Improvement of Extension of Asinan-Soysoyan-Doyong FMR, Taloy Sur, Tuba, Benguet | 1,500,000.00 | General Fund 2015 Non Office | Ruben Ronas Construction | Terminated | Recommended for mutual termination due to site problem |
|
Kapangan | Gaswiling | Improvement of Barangay Hall Toilet | 120,000.00 | General Fund-2015 | Vanket Engineering & Construction | Completed | Completed w/ LD |
|
Atok | Caliking | Completion of 4-classroom two-storey building in Atok National High School - Annex | 2,000,000.00 | SEF-2015 | Rigne Construction | Completed | Suspended due to community quarantine. |
|
Kapangan | Balakbak | Repair of public comfort room and installation of waterworks system, Balakbak, Kapangan | 500,000.00 | GENERAL FUND - NON OFFICE CY 2015 | | Completed | |
|
Kapangan | Labueg | Construction of Labueg Barangay Hall | 500,000.00 | GENERAL FUND - NON OFFICE CY 2015 | | Completed | |
|
Kapangan | Datakan | Improvement of Datakan Multi-purpose Building (Barangay Hall) Datakan | 700,000.00 | GENERAL FUND - NON OFFICE CY 2015 | | Completed | |
|
Buguias | Sebang | Completion of Sebang Barangay Hall | 300,000.00 | General Fund Non Office CY 2015 | On Top Construction | Completed | |
|
Bokod | Ekip | Improvement of Multi-Purpose Building(Phase II), Benguet | 1,700,000.00 | General Fund CY 2015 | Aroboan Construction | Completed | CLUSTERED a) Control No.:03-15-00007 - Aroboan Construction
clustered projects: a) imp of multi-purpose hall, pethal, ekip, bokod; b) imp of multi-purpose bldg (phase II) located at ekip, bokod |
|
Kabayan | Pacso | Improvement of Multi-Purpose Hall, Apanberang | 300,000.00 | SB No. 5 CY 2015 GF | Almond Engineering and Construction Rogelio Alimondo | Completed | |
|
Kibungan | Tacadang | Construction of Toilet at Batangan Elementary School, Tacadang | 800,000.00 | General Fund - Non Office 2015 | Akip Construction and Enterprises/ Bobby wayan | Completed | |
|
Mankayan | Taneg, Guinaoang and Suyoc | Construction of COMPAC building, Panat area, the tri political boundaries of barangay Taneg, Guinaoang and Suyoc, Mankayan | 800,000.00 | General Fund CY 2015 | Malco Construction | Temporarily suspended | 1) Suspended on October 25, 2017 due to site problem
2) Update as of June 2019 |
|
Tuba | Poblacion | Construction of Police sub-station at Sto. Tomas | 1,200,000.00 | 20% PDF CY 2016 | Roben Runas Construction | Terminated | Mutually terminated due to site problems |
|
Tuba | Twin Peaks | Opening of Dalabi FMR | 1,000,000.00 | General Fund CY 2015 - Capital outlay | Aguinsod Construction | Completed | |
|
Tublay | Tuel | Opening of Degwey-Deg-ong FMR | 650,000.00 | General Fund - Non Office CY 2015 | | Completed | Project with underrun, needs additional fund for additional works for the road to be completely usable |
|
La Trinidad | Betag | Cementing and Fencing with-in the PHO Compound | 1,700,000.00 | General Fund CY 2015 PHO | Summerlin Construction | Completed | Completed on February 18, 2018 |
|
Sablan | Banangan | Continuation (Extension) of Keddeng Footpath | 400,000.00 Clustered | General Fund - Non Office CY 2015 | Anas Construction | Completed | |
|
Buguias | Catlubong | Construction of Gymnasium (Phase 3) at Bot-oan E/S | 2,000,000.00 | General Fund | SEJ Construction and Aggregates/ Mr. Eric De Leon | Completed | |
|
Kibungan | Tacadang | Construction of Multi-Purpose Pavement with Complete Bleachers at Batangan Barrio School | 300,000.00 | General Fund - Non Office 2015 | Safelink Builders/ Ponciano Andiso | Completed | |
|
Kabayan | Pacso | Construction of Barangay Health Station (Phase III) | 500,000.00 | General Fund - Non Office 2015 | Solonio Construction | Completed | |
|
Mankayan | Balili | Completion of Balili Multi-Purpose Building, Atayan, Balili | 1,000,000.00 | General Fund - Non Office 2015 | Donato-Sakiwat Construction/ Jerome-Stephen Sakiwa | Completed | |
|
Sablan | Banengbeng | Construction of Barangay Hall (Additional), Banengbeng | 1,000,000.00 | General Fund CY 2015 | Guardian Construction - Ruben B. Pacheco Jr. | Completed | |
|
La Trinidad | Poblacion | Construction of additional cell rooms at the Benguet Provincial Jail, Construction of 3 cell rooms at the Benguet Provincial Jail | 2,000,000.00 | General Fund CY 2015 PGO, General CY 2014 PGO Jail | Almond Engineering and Construction | Completed | Date of project completion |
|
Sablan | Balluay | A) Completion of Public CR Beside Multi-Purpose Hall, Balluay; B) Construction of Public CR at Balluay Barangay Hall, Balluay, Sablan (Additional) | 450,000.00 | General Fund 2015 & General Fund 2017 | Guardian Construction | Temporarily suspended | 1 suspension.
Suspended as of December 28, 2018 |
|
Bakun | Sinacbat | Improvement of Safety Railings and Improvement of Foottrail | 200,000.00 | General Fund CY 2016 | Pulicay Grandsons Construction | Completed | 1) Cluster "G" - Pulicay Grandsons Construction
2) Completed on April 8, 2018
|
|
La Trinidad | Wangal | Construction of Equipment Shed at PEO | 1,000,000.00 | General Fund CY 2016 - PEO | anitos construction/ marty manayos | Completed | |
|
La Trinidad | Poblacion | Improvement of Reception Area at Benguet Provincial Jail | 350,000.00 | General Fund All Offices 2016 | | Completed | Completed on May 16, 2018, with 349,263.84 total cost incurred |
|
Atok | Naguey | Completion of Day Care Center and Multi-Purpose Hall | 600,000.00 | General Fund - Non Office CY 2017 | Balangcod Construction | Completed | |
|
La Trinidad | Wangal | Improvement of PEO Perimeter Fence | 700,000.00 | General Fund - All Offices CY 2016 | EaJr De Leon Construction - Edwardo De Leon Jr | Completed | Completed |
|
Sablan | Bagong | Construction of Palva Footbridge Connecting Asin, Pappa to Sadul | 1,500,000.00 | General Fund CY 2016 - Tourism | Guardian Construction | Completed | Completed on July 10, 2018 with revised target date of completion changed to August 11, 2018 |
|
La Trinidad | Betag | Extension of Provincial Water Analysis Laboratory, Phase I; PHO, La Trinidad Benguet | 700,000.00 | General Fund CY 2016 | RNAA Builders | Completed | |
|
Buguias | Catlubong | Construction of Bekes-Palakad Tirepath FMR | | 2016 SB No. 2 | | Completed | Completed for post inspection |
|
La Trinidad | Puguis | Restoration of the retaining wall along Timoy-Paswek Road; Puguis, La Trinidad, Benguet | 300,000.00 | General Fund CY 2016, LDRRMF-2017 | | Completed | Completed on June 30, 2018, with 258,543.60 total cost incurred to date |
|
Buguias | Poblacion | Opening of Lower Naybo-Benged FMR Poblacion | 1,000,000.00 | 2016 SB No. 2 | | Completed | Completed for Post Inspection |
|
Bokod | Karao | Improvement of Karao FMR | 1,000,000.00 | General Fund 2016 | MALCO Construction | Completed | 1) 1 Suspension
2) Completed; Revised Target Date of Completion = 11/13/2018 |
|
Kabayan | Pacso | Improvement of Mankeo FMR | 600,000.00 | SB #2, CY 2016 | QPJ General Engineering Const. & Supply | Completed | |
|
Buguias | Sebang | Abatan - Kabayan - Gurel National Road to Alapang Elementary School road opening | 500,000.00 | SB #2, CY 2016 | JYP Construction | Temporarily suspended | Temporarily suspended due to the procurement of CNC |
|
Buguias | Natubleng | Construction of CR (with PWD room) and ramp with handrail at Pakpakitan | 1,000,000.00 | General Fund 2016 | Dipas Builders | Temporarily suspended | 1) 1 Suspension
2) Temporarily suspended pending resolution of boundary dispute between barangays natubleng and amgaleyguey which had affected the proposed site where the project will be constructed.
|
|
Buguias | Buyacaoan | Road opening / Extension and improvement of Tagpaya - Peggueyna FMR | 100,000.00 | 20% PDF CY 2016 | Juricmarc Construction | Completed | 1) 1 suspension
2) Completed. Revised target Date = 12/17/2018
|
|
Kabayan | Tawangan | Improvement Along Talabing - Tinoc Road, Tawangan, Kabayan | 8,974,516.34 | Pamana 2016 | Jamil - Sean Construction | Completed | 1) Completed on February 3, 2018 |
|
Kibungan | Tacadang | Improvement of foot rail and provision of hand rail at Mt. Oten | | GF 2016 - Tourism | Malco Construction | Completed | |
|
Atok | Paoay | Construction of Comfort Room Station with water works system at Paoay, Atok | 1,000,000.00 | GF-2017 Tourism | Haight's Construction | Completed | Completed with LD |
|
Kibungan | Palina | Construction of toilet and water works system at Mayos, Palina | 700,000.00 | GF-2016 | Four Brothers Construction | Completed | Completed |
|
Kabayan | Bashoy | Reconstruction of Mt. Pulag Elementary School Building (3 Classroom) | 3,000,000.00 | Trust Fund LDRRMF 2016 | Jamil Sean Construction | Completed | |
|
Atok | Naguey | Rehab. of Naguey - Pasdong Vehicular Bridge, Naguey (Abutment), Atok, Benguet | 2,000,000.00 | LDRRM TRUST FUND 2019 | EMNAR Construction and Engineering Services | Completed | |
|
Kibungan | Poblacion | Construction of Polis Barrio School Cottage Building | 1,000,000.00 | 20% PDF CY 2016 | Ebtitiwa General Engineering and Construction Services | Completed | 1.) Suspended on March 17,2020 due to community quarantine;
2.) Actual date of completion: October 26, 2020.
|
|
Bakun | Bagu | Improvement of Barbarit Primary School | 400,000.00 | SEF 2016 | FMC Warriors Construction | Completed | Suspended on March 17, 2020, due to community quarantine. |
|
La Trinidad | Puguis | Construction of Box Culvert at Lamtang | 200,000.00 | General Fund CY 2016 | | Completed | |
|
Atok | Paoay | Fencing of Benguet-Kochi Sisterhood Park at Haights Place | 1,000,000.00 | General Fund-All Offices CY 2017 | Compass Rose Builders | Completed | |
|
Atok | Caliking | Improvement of Caliking Proper - Anapol FMR | 500,000.00 | General Fund - Non Office CY 2017 Capital Outlay | Sangin Construction | Completed | |
|
Atok | Topdac | Improvement of Powal - Nalseb Barangay Road | 500,000.00 | General Fund - Non Office CY 2017 Capital Outlay | Drichloui Construction | Completed | Project Completed on January 8, 2018. |
|
Atok | Paoay | Construction of Footpath at Half Tunnel to Osokan | 500,000.00 | General Fund - Non Office CY 2017 Capital Outlay | | Completed | |
|
Itogon | Ucab | Construction of 2 Classrooms at Goldcreek E/S Aleb | 2,000,000.00 | General Fund CY 2015 Non Office CY 2017 | WDG Construction and Suppy | Completed | 1) Needs additional funding (cluster)
2) Contract under cluster a: a) const of 2 classroom at goldcreek e/s, b) const of 2 classroom at goldcreek e/s at ucab, itogon. Total amount paid includes the additional fund of Php 100,000.00
3) Completed on April 1, 2018 |
|
Itogon | Virac | Construction of Virac E/S Gymnasium (Phase II) | 2,600,000.00 | General Fund - Non Office CY 2017 | ICO Construction | Completed | 1) 100.00% Completed
2) 1 suspension |
|
La Trinidad | Wangal | Construction of Perimeter Fence, Wangal, La Trinidad, Benguet | 995,000.00 | General Fund All Offices CY 2017 | Sangin Construction | Completed | Completed with liquidated damages |
|
La Trinidad | Wangal | Improvement of Indigenous Building Compound | 1,000,000.00 | General Fund Non Office 2017 | SEJ Construction and Aggregate | Completed | 1) 1 Suspension
2) Revised Target Date of Completion is on October 20, 2018 |
|
La Trinidad | Poblacion | Construction of Capitol Building II, 4th Floor | 15,000,000.00 | General Fund Non Office CY 2017 CO | Buganheirs Engineering Construction | On going | 1) Ongoing with 78.06% completion as of January 2019
2) 1 Suspension
3) On Going w/ LD. Revised target date= 03/03/19. |
|
Mankayan | Taneg | Completion of Lupa-ac Footbridge | 900,000.00 | General Fund - Non Office CY 2017 | Malco Construction | Completed | |
|
Sablan | Bayabas | Riprapping of a portion along Sawili-Boliweng FMR | 500,000.00 | General Fund - Non Office CY 2017 | Sangin Construction | Completed | "Cluster" contract under cluster q: a) const of deep well with jet matic at matal-og, poblacion, sablan; b)riprapping of a portion along sawili-boliweng fmr at sawili, poblacion, sablan |
|
Tuba | Taloy Sur | Improvement along Taloy - Bayacsan Provincial Road | 5,000,000.00 | General Fund Non-Office CY 2017 | hdg construction and enterprises/Hanivall Guilando | Completed | partial accomplishment, re:imp along Taloy-Bayacsan Prov'l Road @ Tuba, Benguet |
|
La Trinidad | Wangal | Construction of Nursery Shed and Storage Room, Wangal | 240,000.00 | General Fund All Offices 2017 | ICO Construction | Completed | Completed on March 15, 2018 |
|
La Trinidad | Wangal | Construction of Perimeter Fence at Wangal Nursery (Phase II) | 250,000.00 | General Fund All Offices 2017 | ICO Construction | Completed | Completed on March 19, 2018 |
|
La Trinidad | Poblacion | Construction of Rice Storage Room | 500,000.00 | General Fund All Offices 2017 | Random Builders | Completed | Completed on April 22, 2018 |
|
Kapangan | Datakan | Construction of Extension and Comfort Room Station of the SLT Training Center | 300,000.00 | General Fund All Offices 2017 | Vanket Engineering and Construction | Terminated | |
|
La Trinidad | Poblacion | Vertical Extension of Jail Perimeter Fence | 200,000.00 | General Fund All Offices 2017 | ADL Construction | Completed | Completed on May 12, 2018, with 199,048.67 total cost incurred. |
|
La Trinidad | Wangal | Extension/Improvement of PEO Building | 3,500,000.00 | General Fund All Offices CY 2017 | Buganheirs Engineering Construction | Completed | completed on September 5, 2018 |
|
La Trinidad | Poblacion | Improvement of Capitol Main Building | 3,000,000.00 | General Fund CY 2017 | Sharamelle Construction and General Engineering | Completed | 1) 1 Suspension
2) Revised Target Date of Completion is on October 12, 2018 |
|
Kibungan | Madaymen | Improvement of Tagpaya-Vemayoca FMR, Madaymen, Kibungan, Benguet | 2,000,000.00 | SB No. 1 2017 | | Completed | Completed: July 9, 2018
Revised Target Date of Completion: July 26, 2018 |
|
Tuba | Taloy Norte | Improvement of Dang-ay - Bontagel FMR, Taloy Norte, Tuba | | 20% PDF CY 2017 | | Completed | Completed on May 16, 2018, with 480,273.68 total cost incurred. |
|
Itogon | Ucab | Construction of two (2) Classrooms at Goldcreek Elementary School Aleb | 2,500,000.00 | 20% PDF CY 2017 | WDG Construction and Suppy | Completed | CLUSTERED - a) Control No.: 01-17-00005 - WDG Construction and Suppy |
|
Bokod | Pito | Construction of Quarantine Checkpoint Along Bokod Viscaya Road, Bokod, Benguet | 450,000.00 | 20% PDF CY 2017 | BLDY Engineering & Construction | Completed | |
|
Mankayan | Tabio | Improvement/ Construction along Mankayan - Bato Provincial Road. Tabio, Mankayan, Benguet | 1,500,000.00 | SB no. 1 2017 | | Completed | |
|
Buguias | Amlimay | Completion of Barangay Health Station (Clinic) Amlimay, Buguias, Benguet | 1,000,000.00 | SB No. 1 - 2017 | Pulicay Grandsons Construction | Completed | Completed: 09/15/2018 |
|
La Trinidad | Poblacion | Upgrading of Provincial Jail Electrical System | 400,000.00 | General Fund - 2017 All Offices | Organic Construction | Completed | Completed |
|
Itogon | Poblacion | Installation of Gate and Road Improvement Going to Sitio Suyo, Poblacion | 150,000.00 | 20% PDF 2017 | Bemada Construction | Completed | Update as of October 9, 2018 |
|
Kibungan | Tacadang | Improvement of School Ground and Fencing, Tacadang, Kibungan, Benguet | 500,000.00 | 20% PDF 2017 | Malco Construction | Completed | completed on 9/11/2018 |
|
La Trinidad | Betag | Improvement of Pharmacy and Installation of Cooling System and Ventilation | 1,100,000.00 | 20% PDF CY 2017 | ADL Construction | Completed | |
|
Tuba | Ansagan | Improvement along Kias-Ansagan FMR (Lumandi Section) | 500,000.00 | 20% PDF CY 2017 | Reasons Construction and Supplies | Completed | |
|
La Trinidad | Wangal | A.)Construction Of PCL-LNB Multi-Purpose Building(Phaseii), Wangal; B.) A.)Construction Of PCL-LNB Multi-Purpose Building(Phaseii), Wangal, La Trinidad, Benguet | 14,000,000.00 | General Fund (GF) 2018 / GF 2016 / GF 2017 Non-Office | RNAA Builders | Completed | Update as of January 24, 2020. |
|
Mankayan | Colalo | Construction of Pacda FMR Riprap, Suyoc | 500,000.00 | SB #1, CY 2017 | A.L. Saganday Construction | Completed | 1) 1 Suspension |
|
Tuba | Tabaan Sur | Improvement of Indaoac-Pasiday FMR | 500,000.00 | 20% PDF CY 2017 | Roben R. Runas Construction | Completed | |
|
Bakun | Dalipey | Construction of View Deck with Comfort Room at Liwang, Dalipey | 800,000.00 | SB #2, CY 2017 | NAIR Construction & Engineering | Completed | Completed and usable. |
|
Buguias | Abatan | Completion of Tabbacan Barangay Health Station or Birthing Facility | 600,000.00 | SB #4, CY 2017 | Juricmarc Construction | Completed | |
|
Buguias | Abatan | Construction of Septic Tank and Installation of pipeline system and Improvement of Ramp and Handrails | 346,400.00 | SB #1, CY 2017 | On Top Construction | Completed | |
|
Kapangan | Pudong | Construction of Loading Platform and Waiting Shed at Tadayan Proper | 500,000.00 | SB #1, CY 2017 | Ebtitwa General Eng'g & Construction | Completed | |
|
La Trinidad | Puguis | Improvement of Lamtang FMR | 500,000.00 | 20% PDF CY 2017 | Pulicay Grandson's Construction | Terminated | For Termination |
|
La Trinidad | Balili | Construction of Drainage Canal with cover, Central Balili | 150,000.00 | 20% PDF CY 2017 | Pulicay Grandson's Construction | Terminated | For termination |
|
Bokod | Daclan | Improvement and widening of footrail leading to DMMH-bejeng to Mariano Lake Asin Hot Spring | 300,000.00 | SB #1, CY 2017 | SRBA General Construction | Completed | 1) 1 suspension resumed on 1/14/2019 |
|
Buguias | Baculongan Norte | Improvement of JBR Mandal-em Salidet FMR | 500,000.00 | 20% PDF CY 2017 | MACGAT Construction | Completed | 1 suspension; Completed |
|
Kabayan | Lusod | Improvement of Proper Lusod-Landing FMR | 1,000,000.00 | SB #1, CY 2017 | Jamil Sean Construction | Temporarily suspended | 1) 1 suspension
2) Suspended since May 9, 2018 up to present (awaiting for CNC)
3) Update as of July 2019 |
|
Kabayan | Lusod | Construction of Lusod Footbridge | 1,000,000.00 | SB #1, CY 2017 | Haight's Construction | Completed | Completed with revised target date of November 29, 2018 for preparation of voucher |
|
Mankayan | Taneg | Construction of Mabilig - Aquili Footbridge (Additional) | 880,000.00 | 20% PDF - 2018 | On Top Construction | Completed | 1 Suspension due to road closure |
|
Tuba | Camp 4 | Improvement of flood control structure at Riverside, Camp 6 | 2,000,000.00 | SB #1, CY 2017 | Anas Construction | Completed | On Going.Revised Target Date = 08/07/2019
|
|
Tublay | Ambongdolan | Improvement of Trail and provision of handrail at paterno cave, Ambongdolan, Tublay | 400,000.00 | GF tourism 2017 | E.B. Titiwa General Eng'g & Construction | Completed | |
|
Bokod | Tickey | Concreting of Camanggaan - Liboong FMR | 300,000.00 | SB #1 CY 2017 | SRBA General Construction | Completed | |
|
La Trinidad | Poblacion | Improvement and upgrading of Electrical System (PGSO) | 1,000,000.00 | General Fund CY 2017 | On Top Construction | Completed | completed
|
|
Kibungan | Tacadang | Construction of Barangay Hall with Tourism Information Center of Barangay Tacadang, Kibungan, Benguet | 1,000,000.00 | GF 2017 All Offices | Malco Construction | Completed | |
|
Mankayan | Balili | Construction of Water Tank at Nagawaan, Balili, Mankayan, Benguet | 200,000.00 | 20% PDF | Baldas Construction | Completed | Completed, final inspection, March 12, 2019 |
|
Bokod | Bobok-Bisal | Completion of Comfort Room, Bobok-Bisal, Bokod, Benguet | 400,000.00 | N/A | SRBA Gen. Construction | Completed | |
|
Itogon | Ampucao | Construction of Senior Citizen's Building (phase II) Dalicno, Itogon | 500,000.00 | GF-2017 | Renton Eng'g Services/Enrique Waldo | Completed | 1.) Inspection was done on March 19, 2019. There is a contract variation from tiles to riprap.
2.) Post-inspection was done on June 27, 2019. |
|
La Trinidad | Beckel | Construction of drainage canal at sitio sapsing | 497,958.15 | SB#2 2017 | Haight's Construction | Completed | Still ongoing as of April 30, 2019 |
|
Itogon | Tinongdan | Construction of Waterworks System Binga Riverside, Tinongdan | 500,000.00 | 20% PDF | Aljune Builders | Completed | Completed and usable as to the final inspection on March 22, 2019. |
|
La Trinidad | Poblacion | Construction of Session Hall at the Capitol Legislative Building | 1,000,000.00 | General Fund-2017,PGSO,Capital Outlay | Hillstone Builders | Completed | |
|
Bokod | Bobok-Bisal | Construction of Bisal Waterworks System | 500,000.00 | 20% PDF CY 2017 | QPJ General Eng'g Construction and Supply | Completed | |
|
Itogon | Dalupirip | Construction of Water tank at Kawadan, Dalupirip, Itogon, Benguet | 500,000.00 | 20% PDF CY 2017 | Aljune Builders | Completed | |
|
Itogon | Tuding | Construction of three classroom building with basic facilities at Pacalso Elementary School | 6,500,000.00 | CSR Program Mitigation Fund, SN Aboitiz | Compass Rose Builders | Completed | |
|
Bakun | Ampusongan | Completion of Ampusongan Multi-Purpose Building, Ampusongan | 3,000,000.00 | General Fund 2017 | Reasons Construction | Completed | Images taken on June 18, 2019 |
|
Itogon | Ucab | Completion of Two Classroom at Goldcreek E/S at Aleb | 1,200,000.00 | 20% PDF CY 2017 | Reko Gen. Konstruct | Completed | |
|
Buguias | Catlubong | Completion of Closed Gym, Bot-oan, Catlubong, Buguias, Benguet | 2,000,000.00 | SB #1, CY 2017 | Mel-Soc Construction | Completed | |
|
Bokod | Tikey | Construction of Domestic Water System for Tikey Proper | 668,000.00 | 20% PDF CY 2017 and Brgy. counterpart | YKJ-LHAT General Construction | Completed | |
|
Kabayan | Bashoy | Improvement of Abukot - Nandupit FMR | 500,000.00 | 20% PDF CY 2017 | Vanvin Construction and Supply | Completed | |
|
La Trinidad | Balili | Improvement of viewdeck & Construction of comfort room w/ Septic Tank at Km. 3 | 657,934.93 | SB #01 CY 2017 | Vanvin Construction and Supply | Completed | |
|
Mankayan | Cabiten | Rehabilitation along Baguyos-Maduto FMR | 1,680,000.00 | SB #03 CY 2019 GF | Layad General Engineering Construction & Aggregates | Completed | 1.) Suspended 2/24/20 due to closed access road.
2.) Actual date of completion: September 29, 2020.
|
|
La Trinidad | Wangal | Construction of multi-purpose gym | 1,000,000.00 | SB #04 CY 2017 | On Top Construction | On going | |
|
Tuba | Poblacion | Construction of Senior Citizens Multipurpose Building | 1,500,000.00 | 20% PDF 2017 & General Fund CY 2017-Non Office | Ruben Runas Construction | Completed | Suspended on March 17,2020 due to community quarantine.
|
|
Bokod | Ekip | Improvement of Poodan Water System | | SB #1, CY 2017 | N-J Construction | Completed | Original target completion date: June 4, 2020. |
|
La Trinidad | Wangal | Perimeter fencing of Benguet Sports Complex, Wangal (Phase I) ; Perimeter Fencing of Benguet Sports Complex (Phase II) | 5,000,000.00 | General Fund 2017 & General Fund 2018 PGSO | SEJ Construction & Aggregate | Completed | |
|
Kapangan | Datakan | Construction of Waiting Shed, Sitio Proper, Datakan, Kapangan | 500,000.00 | General Fund 2018 | Sandstream Construction | Completed | Completed on July 19, 2018 |
|
Kapangan | Paykek | Improvement of Agro-Eco Park, Lomon, Kapangan | 1,000,000.00 | GF 2018 | EBTITIWA Gen. Eng'g & Construction Services | Completed | |
|
Mankayan | Sapid | Improvement of Marivic to Gravel Pit Road, Sapid Mankayan, Benguet | 1,000,000.00 | General Fund CY 2018 | Eugao Construction | Completed | |
|
La Trinidad | Tawang | Improvement of Boted Tawang FMR | 500,000.00 | 20% PDF CY 2018 | Sangin General Construction | Completed | |
|
Sablan | Bagong | Improvement of Asham-Cayapes FMR, | 500,000.00 | 20% PDF 2018 | Guardians | Completed | |
|
Buguias | Sebang | Improvement of Pasbol-Impugong FMR, Sebang | 500,000.00 | 20% PDF 2018 | MACGAT Construction | Completed | 1) 1 Suspension
2) Revised target date of completion - October 8, 2018 |
|
Buguias | Baculungan Sur | Improvement of Obanga Crossing FMR, Baculungan Sur (Construction of Retaining Wall) | 500,000.00 | 20% PDF CY 2018 | Juricmarc Construction | Completed | |
|
Buguias | Baculongan Sur | Improvement of Balintag-Dekan Road (Makbas Section) | 500,000.00 | 20% PDF CY 2018 | MACGAT Construction | Completed | |
|
Kabayan | Ballay | Improvement of Barangay Road at Toneleg, Ballay | 500,000.00 | 20% PDF CY 2018 | Jamil Sean Construction | Completed | Completed - October 5, 2018 |
|
La Trinidad | Lubas | Improvement of Guitley Barangay Road,Lubas,La Trinidad,Benguet | 2,000,000.00 | 20% PDF CY 2018 | On Top Construction | Completed | Revised Target Date of Completion is on October 12, 2018 |
|
Bakun | Gambang | Improvement of Cagam-is to Ingaan Farm to Market Road, Gambang, Bakun | 400,000.00 | 20% PDF CY 2018 | SRBA General Construction | Completed | Project Completed on 11-29-2018 |
|
Bokod | Ekip | Construction of Footpath from Gwetig going to Poodan | 500,000.00 | 20% PDF CY 2018 | Hillbrand Engineering | Completed | Completed with LD |
|
Kapangan | Sagubo | Construction of Comfort Room at Kapangan National High School - Sagubo Annex | 500,000.00 | 20% PDF CY 2018 | Vanket Engineering and Construction | Completed | |
|
Tuba | Tadiangan | Improvement of Tawangan-Pacac Road | 500,000.00 | 20% PDF CY 2018 | Juricmarc Construction | Completed | |
|
Bakun | Ampusungan | Rehab of Ay-ay to Cabutotan Farm to Market Road | 1,000,000.00 | SB #1, CY 2018 | Pulicay Grandson's Construction | Completed | Ongoing
1 suspension
Recommended for suspension to undergo variation
Revised Target Date =04/09/2019
|
|
Bokod | Ekip | Construction of Dirty Kitchen at the Barangay Health Sub-Station, Sitio Poodan | 500,000.00 | 20% PDF CY 2018 | Sangin General Construction | Completed | |
|
Bakun | Sinacbat | Improvement of Macbas-Beyeng FMR | 1,000,000.00 | 20% PDF CY 2018 | Pulicay Grandsons Construction | Completed | Completed and usable |
|
Mankayan | Bedbed | Construction of pavement of Aliwandey FMR | 500,000.00 | 20% PDF CY 2018 | Sapid Builders | Completed | 1) 1 suspension
2) Temporarily suspended due to the closed road because of the typhoon/monsoon.
3) Completed
4) Revised Target Date=02/19/2019
|
|
Tuba | Taloy Norte | Construction of BPATS Outpost | 500,000.00 | General Fund 2018 | Roben B. Runas Construction | Terminated | Recommended for mutual termination |
|
La Trinidad | Beckel | Completion of Lamut Elementary School Perimeter Fence, Lamut, Beckel, LTB | 1,000,000.00 | 2018 GF- PEO | Pulicay Grandsons Construction | Completed | Completed and usable. |
|
Sablan | Bayabas | Bulala warehouse ground improvement, Agri-eco farm, Bulala | 1,500,000.00 | 20% PDF 2018 | Anas Construction | Completed | |
|
Atok | Topdac | Construction of Pavement, Topdac Elementary School, Atok, Benguet | 500,000.00 | GF CY 2018 | | Completed | |
|
Mankayan | Cabiten | Construction of Clipper Foot Bridge Las-igan, Cabiten, Mankayan, Benguet | 250,000.00 | 20% PDF - 2018 | Baldas Construction | Completed | |
|
La Trinidad | Beckel | Road improvement of Pagal Barangay Road | 2,000,000.00 | 20% PDF 2018 | On Top Construction | Completed | |
|
Bokod | Bobok-Bisal | Construction of Comfort Room at Japas | 500,000.00 | 20% PDF 2017 | Summerlin Construction and Development Corporation | Completed | |
|
Mankayan | Tabio | Improvement along Mankayan - Bato Provincial Road | 5,000,000.00 | 20% PDF CY 2018 | Donato - Sakiwat Construction (Jerome Stephen Sakiwat) | Completed | Completed |
|
Tuba | Tadiangan | Improvement along Yagyagan - Ampusa Provincial Road | 5,000,000.00 | 20% PDF CY 2018 | Sapdoy Enterprise (William W. Sapdoy) | Completed | Update as of July 11, 2019
On-going
with liquidated damages |
|
Itogon | Dalupirip | Improvement of Access Going to Mt. Pigingan, Dalupirip, Itogon, Benguet | 500,000.00 | GF 2018 - Tourism | SRBA General Construction | Completed | Completed |
|
La Trinidad | Wangal | Extension of Benguet Indigenous People Building, Wangal, La Trinidad | 1,000,000.00 | General Fund 2018 | On Top Construction | Completed | |
|
La Trinidad | Wangal | Construction of Power House Benguet Cold Chain Project La Trinidad, Benguet | 500,000.00 | General Fund 2018 | Akip Construction & Enterprise | Completed | |
|
Atok | Poblacion | Completion of Banayakew Multi-Purpose Building, Banayakew | 800,000.00 | General Fund 2018-Tourism | Four Brothers Construction | Completed | Completed |
|
Bakun | Gambang | Improvement of Alam-am - Nasyotean FMR, Gambang | 1,000,000.00 | General Fund 2018 | Drichloui Construction | Completed | |
|
Itogon | Ampucao | Construction of Basketball Court at Pasiday | 400,000.00 | General Fund CY 2018 and General Fund Non Office CY 2015 | BABECOR BUILDERS | Completed | |
|
Bokod | Poblacion | Construction of fence at Bulo Elementary School | 850,000.00 | SB #1 - SEF 2018 | SRBA General Construction | Completed | |
|
Itogon | Dalupirip | Improvement of Comfort Room, Barangay Hall, Dalupirip, Itogon | 600,000.00 | GF 2018 | Aljune Builders | Completed | |
|
Sablan | Bayabas | Construction of Reception Building and CR with Lavatory, Bulala Agri-Eco Farm, Bulala | 3,000,000.00 | General Fund 2018 | Anas | Completed | Completed |
|
Tublay | Caponga | Improvement along Acop - Kapangan JCT- Ambongdolan Provincial Road | 1,000,000.00 | LDRRMF 2018 | Family Circle Construction | Completed | |
|
Bokod | Tikey | Completion of Basketball Court at Tikey | 270,000.00 | SB #1, CY 2018 | N. J. Construction | Completed | |
|
Kapangan | Beleng Belis | Construction of Multi-purpose cottage, Proper Beleng Belis | 1,687,000.00 | SB #1, CY 2018 | Norbano Builders | Completed | Ongoing with LD
|
|
Itogon | Tuding | Rehabilitation of canal and ripraping along upper Mangga - Luneta Road | 500,000.00 | 20% PDF 2018 | ARJY Construction | Completed | Inspection was done on March, 26, 2019 |
|
La Trinidad | Balili | Rehabilitation of footpath with drainage at Mamaga, Balili, La Trinidad (starting from Guinodan's Residence) | 500,000.00 | LDRRMF 2018 | Hillstone Builders | Completed | Inspection was done on March 19, 2019 |
|
Kapangan | Balakbak | Concreting of Entrance Road at Governor Bado Dangwa Agro - Industrial School Main and Balakbak E/S, Kapangan | 500,000.00 | General Fund 2018 | EBTitiwa Gen Engineering and Construction Services | Completed | |
|
Kapangan | Kapangan Central | Completion / Finishing of the basement of the garage / warehouse at Kapangan, Benguet | 300,000.00 | GF 2018 | Family circle construction | Completed | |
|
La Trinidad | Pico | Improvement of POCNA Road | 1.,500,000 | 2018 SB #2 | Malco Construction2 | Completed | Completed and Geotag on October 3, 2019 |
|
La Trinidad | Wangal | Construction of Comfort Room with Lavatory (Cold Chain) at Wangtal,La Trinidad,Benguet | 1,615,000.00 | General Fund-2018 | Four Brothers Construction | Completed | |
|
Itogon | Loacan | Rehabilitation of Loacan Elementary School Building, Itogon | 1,000,000.00 | GF-LDRRMF | Reko Construction | Completed | completed |
|
La Trinidad | Wangal | Construction Of Training Center At Wangal (Phase II), La Trinidad,Benguet | 8,047,000.00 | General Fund-2018 | Random Builders | Completed | |
|
Sablan | Bayabas | Construction of Agri-Eco Farm Cottages at Bulala Agri-Eco Farm,Bulala,Bayabas | 5,000,000.00 | General Fund-2018 | Anas Construction | Completed | |
|
Sablan | Pappa | Completion of Barangay Hall at Pappa | 800,000.00 | General Fund-2018 | Anas Construction | Completed | |
|
Bakun | Gambang | Repair of Bagtangan Elementary School, Bakun - 3 classrooms at Gambang, Bakun | 900,000.00 | N/A | Drichloui Construction | Completed | Completed |
|
La Trinidad | Poblacion | Construction of Material Recovery Facility, Capitol, LTB | 210,000.00 | General Fund 2018 | Four Brothers Construction | Completed | Completed |
|
Bokod | Karao | Construction of Gweling to Santaan / Busok Waterworks | 1,800,000.00 | 20% PDF CY 2017 & SB#1 CY 2018 | Summerlin Construction and Development Corporation | Completed | |
|
Tuba | San Pascual | Construction of Comfort Room and Lavatories | 2,000,000.00 | General Fund 2018 | Pulicay Grandsons Construction | Completed | Project Engineer: John Pilay
QC: Jaypee Cayamdas
Geotagged by JC |
|
Kabayan | Ballay | Construction of Flood Control at Kubo-Ballay | 250,000.00 | 20% PDF 2018 | YKL-LHAT General Construction | Completed | |
|
Tublay | Ambassador | Improvement of Nalseb-Los-oc Barangay Road. | 1,000,000.00 20% PDF | 20% PDF 2018 | Sangin | Completed | Completed and Geo-tagged on October 18, 2019 |
|
Buguias | Amlimay | Concreting of Dagway Box culvert approach | 200,000.00 | PDF CY 2018 | | Completed | |
|
Sablan | Bayabas | Improvement of Nursery Site Access Road at Agri-Eco Farm, Bulala | 1,500,000.00 | 20% PDF CY 2018 | Anas Construction | Completed | |
|
La Trinidad | Poblacion | Improvement of the Provincial Library Building | 2,500,000.00 | General fund (All Offices) 2018 | Cialmar Builders | Completed | |
|
Buguias | Sebang | Construction of slab bridge and improvement along Paneg-an, Tamangan (Lutaan Section) FMR | 2,000,000.00 | 20% PDF CY 2018 | JYP General Construction | Completed | 1.) With extension of 20 calendar days.
2.) Revised target date of completion: January 23, 2020
3.) Actual date of completion: February 13, 2020. |
|
Bokod | Ambuklao | Construction of Multi-Purpose Open Gym at Sombrero | 4,000,000.00 | 20% PDF 2018 | Sharamalle Construction and General Engineering | Completed | |
|
Bokod | Ambuklao | Construction of flood control | 2,000,000.00 | 20% PDF 2018 | Hillstone Builders | Completed | Completed on February 12, 2020. |
|
Bokod | Karao | Construction of Barangay Health Station at Karao | 2,500,000.00 | 20% PDF CY 2018 | Hillbrand Engineering | On going | Update as of February 21, 2020. |
|
La Trinidad | Poblacion | Improvement of Water Works System of Capitol Main Building, Legislative Building and Annexes (Phase I) | 500,000.00 | General Fund CY 2018 | Alber and Seven Construction | Completed | |
|
La Trinidad | Wangal | Construction of a New Automotive Building with Ground Improvement (Phase I) | 4,000,000.00 | 20% PDF CY 2018 | LBJ Construction | Completed | 1.) Revised date of completion: February 25, 2020.
2.) Actual date of completion: February 14, 2020. |
|
Atok | Caliking | Installation of Semi-Permanent Fence for the Old Cagui-ing Elementary School | 800,000.00 | SEF 2018 | Sangin General Construction | Completed | |
|
Buguias | Loo | Improvement/Widening of Lanas Panayaoan FMR (JCT NHS) | 2,000,000.00 | 20% PDF 2018 | JYP General Construction | Completed | Suspended until such time that Loo NHS will allow the construction of PCCP within the school compound.
|
|
Kibungan | Sagpat | Construction of Comfort Room at Sagpat Proper | 500,000.00 | General Fund CY 2018 | Akip Construction and Enterprise | Temporarily suspended | Suspended on November 12, 2019 due to awaiting for the implementation of the additional slope protection on the project site.
|
|
Sablan | Poblacion | Construction of Multi-purpose Building at Sitio Sabdang | 2,000,000.00 | 20% PDF - 2018 | HGW=3 Engineering & Construction | Temporarily suspended | Suspended on July 17,2019 due to site problem. |
|
La Trinidad | Betag | Clustered Project for BeGH (8 Projects, A-H): A. Improvement of Roads & Sidewalks at BeGH B. Rehabilitation of Oxygen Generator System BeGH La Trinidad, Benguet C. Rehabilitation of Sewage Treatment Plant at BeGH D. Repair of Damages Brought by Typhoon Ompong "Mangkhut" at BeGH E. Repair of Damages of Morgue Building F. Repair of Damages at CT Scan Building G. Repair & Maintenance of Canteen Building H. Repair & Maintenance of Farmer Maternity Building | A. 1,500000.00 B. 1,500000.00 C. 1,760,592.77 D. 1,500,000.00 E. 442,469.13 F. 92,852.76 G. 377,196.19 H. 393,731.81 | A. DOH 2018-11-12A B.DOH 2018-10-12B C. DOH 201 | QPJ General Eng'g Construction & Supply | On going | Suspended on March 17,2020 due to community quarantine.
|
|
La Trinidad | Wangal | Construction of PDRRMO Office Building Phase II | 8,000,000.00 | LDRRMF 2018 | Anitos Construction | Completed | Suspended on March 17,2020 due to community quarantine.
|
|
Mankayan | Tabio | Construction of Quarantine Checkpoint/Outpost (Mankayan) Madaymen | 1,500,000.00 | 20% PDF CY 2018 | BTCJR Construction & Engineering Services | Completed | Suspended on March 17,2020 due to community quarantine.
|
|
Bokod | Ambuklao | Improvement of Waterworks System | | 20% PDF CY 2018 | Sherfelias Construction | Completed | Actual date of completion: August 7, 2020. |
|
Tublay | Caponga | Improvement of Paoad Elementary School | 1,500,000.00 | SEF 2018 | Skalyndra Construction and Supply | Completed | Actual date of completion: October 7, 2020 |
|
Tuba | San Pascual | Construction of Apni - Colon Waterworks System | 500,000.00 | 20% PDF CY 2018 | Roben Runas Construction | Completed | |
|
La Trinidad | Ambiong | Improvement of Ambiong Elementary School Perimeter Fencing | 500,000.00 | SEF CY 2018 | Efler Construction and Enterprise | Completed | |
|
Kabayan | Pacso | Repair of Asokong Pacso Elementary School | 900,000.00 | SEF 2018 | Four Brothers Construction | Completed | |
|
Bokod | Ambuclao | Construction of Lower Minac Flood Control | 1,000,000.00 | LDRRMF | BLDY Eng'g & Construction | Completed | Completed with LD |
|
La Trinidad | Bahong | Construction of Retaining Riprap along upper Sadag Provincial Road (near Comiles Residence) | 1,500,000.00 | SB #1, CY 2017 | MACGAT Construction | Completed | Completed with Liquidated Damages (LD). |
|
La Trinidad | Betag | Construction of Extension of Provincial Water Analysis Laboratory (Phase II) | 1,000,000.00 | General Fund 2018 | Hillstone Builders | Completed | |
|
La Trinidad | Poblacion | Construction of Annex Building (Phase I); and Construction of Annex Building Capitol (Phase II) | 43,000,000.00 | SB #4 CY 2017; GF CY 2018; and SB#1 CY 2018 | Jomarcann General Construction | Completed | Actual date of completion: March 17, 2020. |
|
Tuba | Twin Peaks | Completion of Open Gymnasium | 500,000.00 | 20% PDF CY 2017 | BABECOR BUILDERS | Completed | Final inspection was made on March 11, 2019 |
|
Tuba | San Pascual | Construction of Quarantine Checkpoint/Outpost at San Pascual, Tuba | 1,500,000.00 | 20% PDF CY 2018 | Roben Runas Construction | Completed | Revised target date of completion from July 12, 2019 to August 30, 2019. |
|
Bakun | Gambang | Improvement of Liwang - Bolbolo Farm to Market Road, Bagtangan | 3,000,000.00 | SB #3, CY 2019 | Apaklo Kin Construction & Eng'g Services | Completed | 1.) Original target date of completion: June 25, 2020; Suspended due to community quarantine;
2.) Date resumed: June 24, 2020. |
|
Tuba | San Pascual | Improvement of Native Pig Multiplier Farm | 1,000,000.00 | General Fund CY 2018 | Roben B. Runas Construction | Completed | |
|
Atok | Paoay | Fencing of the Beng. Kochi Sisterhood Park at Haight's Place | 1,000,000.00 | GF 2017 | Four Brothers Construction | Temporarily suspended | Suspended due to the inappropriate program of work (From hollow blocks to square bar/interlinks) |
|
Bokod | Nawal | Rehabilitation of Nawal Elementary School Waterworks System | 315,000.00 | 20% PDF 2018 | N-J Construction | Completed | ntp as of January 2019 |
|
Sablan | Bayabas | Perimeter fencing at Agro-Eco farm (Phase IV) | 1,000,000.00 | 20% PDF CY 2018 | Anas Construction | Completed | |
|
Tuba | Tadiangan | Rehabilitation along Yagyagan-Ampusa Provincial Road | 1,000,000.00 | 20% PDF 2019 | Anas Construction | Completed | |
|
Bokod | Pito | Rehabilitation of Pilpiloy Waterworks System at Pito, Bokod, Benguet | 450,000.00 | N/A | BLDY Engineering and Construction | Completed | |
|
Bokod | Pito | Construction of Administrative Building with Comfort Room | | N/A | Hillbrand Engineering | Completed | |
|
Kapangan | Kapangan Central | Repair & Repainting of the Hospital Main Building (door jambs,ceilings,etc.,including damaged roofs) at Central,Kapangan,Benguet | 1,500,000.00 | General Fund 2019 | Haight's Construction | Completed | |
|
La Trinidad | Poblacion | Installation of Razor Barbed Wire | 400,000.00 | General fund 2019, PGO-Jail | Haight's Construction | Completed | completed with slippage
|
|
Sablan | Banangan | Rehabilitation of Calot - Wassit FMR | 600,000.00 | General Fund CY 2019 | Anas Construction | Completed | |
|
Sablan | Bayabas | Construction of Waiting Shed at Calamay | 200,000.00 | General Fund CY 2019 | Anas Construction | Completed | |
|
Buguias | Amgaleyguey | Construction of Sagandoy Elementary School | 2,020,075.00 | SB #1, SEF 2018 | Mel-soc Construction | Completed | |
|
Kibungan | Palina | Repair of Palina Elementary School Building, Palina Kibungan, Benguet | 1,100,000.00 | 20% PDF 2019 | LBJ Construction | Completed | Completed and geo-tagged on Oct. 15, 2019 by JC |
|
Kabayan | Ballay | Improvement of Indaoac - Tinaleb - Barangay Road | 1,500,000.00 | 20% PDF CY 2019 | Jamil Sean Construction | Completed | |
|
Tuba | Camp 6 | Construction of Flood Control along Bued River Riverside Camp 6 | 2,500,000.00 | 20% PDF 2019 | Boyet Builders | Completed | Completed and geo-tagged on October 25, 2019 by JC |
|
Tuba | Tabaan Norte | Improvement of along Pugo-Balangabang Provincial Road | 5,000,000.00 | 20% PDF 2019 | Remnant Builders | Completed | Completed and geo-tagged by JC on November 14, 2019. |
|
Buguias | Buyacaoan | Improvement of Tagpaya Peggueyna Farm to Market Road | 1,000,000.00 | General Fund 2019 | Tepanlu Construction and Supply | Completed | 1.) With suspension.
2.) Revised target date of completion: February 11, 2020. |
|
Buguias | Natubleng | Completion of Police Substation and Tourism Information / Assistance Center | 500,000.00 | General Fund 2019 | On Top Construction | Completed | |
|
Buguias | Loo | Rehabilitation of J207 Becaeg-Kitongan Farm to Market Road | 800,000.00 | LDRRMF Trust Fund CY 2019 | On Top Construction | Completed | |
|
Buguias | Amgaleyguey | Improvement of Km. 73 Amgaleyguey Proper Barangay Road | 500,000.00 | 20% PDF CY 2019 | Ebtitiwa General Engineering and Construction Services | Completed | |
|
Buguias | Loo | Construction of Alakan flood control, Dagdag-Nagubgubbang section | 3,000,000.00 | 20% PDF 2019 | BTCJR Constrution & Engineering Services | Completed | |
|
Kabayan | Eddet | Construction of Retaining Wall & Widening of Sharp Curve | 500,000.00 | SB #1 CY 2019 | Vanvin Construction and supply | Completed | |
|
Kabayan | Gusaran | Construction of Flood Control with Spillway at Basil, Asokong | 6,000,000.00 | 20% PDF 2019 | Jamil Sean Construction | Completed | |
|
Kabayan | Pacso | Road opening - Pacso | 500,000.00 | SB #1 CY 2019 | Jamil Sean construction | Completed | |
|
Kabayan | Poblacion | Construction of Abapang Cotcot Access Road | 800,000.00 | 20% PDF CY 2019 | Jamil Sean Construction | Completed | |
|
Sablan | Bayabas | Rehabilitation of Tamaan - Bayabas Farm to Market Road | 1,200,000.00 | 20% PDF CY 2019 | Anas Construction | Completed | |
|
La Trinidad | Balili | Rehabilitation of footpath and drainage canal along Gungabon Residence, Mamaga, Balili | 1,000,000.00 | General Fund CY 2019 | Rigne Construction | Completed | Actual completion: December 27, 2019 |
|
Buguias | Sebang | Improvement of Panig-an - Bot-oan Farm to Market Road | 500,000.00 | General Fund CY 2019 | JYP General Construction | Completed | |
|
Mankayan | Bedbed | Rehabilitation of Mankayan - Bedbed Provincial Road | 3,000,000.00 | LDRRMF CY 2019 | Cliff Construction and Aggregates | Completed | |
|
Buguias | Sebang | Improvement of Panig-an - Tamangan, Sebang Farm to Market Road (Longilong Section) | 1,000,000.00 | SB #3, CY 2019 | On Top Construction | Completed | Actual date of completion: February 29, 2020. |
|
Buguias | Sebang | Improvement of Pasbol - Impugong Farm to Market Road | 2,500,000.00 | SB #1 CY 2019 | JYP General Construction | Completed | |
|
La Trinidad | Bahong | Improvement along Bahong - Sadag Provincial Road | 4,000,000.00 | 20% PDF CY 2019 | Efler Construction and Enterprise | Completed | |
|
Buguias | Poblacion | Rehabilitation of Retaining Wall along Walayan-Naybo-Padang FMR | 1,000,000.00 | LDRRM Trust | ICO Construction Services | Completed | 1.) Revised target date of completion: February 3, 2020.
2.) Actual date of completion: February 22, 2020. |
|
Buguias | Catlubong | Improvement of Ponopon - Lusab Farm to Market Road | 1,000,000.00 | SB #3 CY 2019 | On Top Construction | Completed | |
|
Kabayan | Adaoay | Improvement of Lt. Alisandro Marquez Barangay Center | 500,000.00 | SB #1, CY 2019 | Vanvin Construction and Supply | Completed | |
|
Mankayan | Cabiten | Completion of Multi-Purpose Building at Camanpaguey | 500,000.00 | SB #1, CY 2019 | Baldas Construction | Completed | |
|
Kabayan | Gusaran | Improvement of Bakbakan - Akikian Farm to Market Road | 1,000,000.00 | SB #3 CY 2019 & 20% PDF CY 2019 | Vanvin Construction and Supply | Completed | 1.) Revised target date of completion is: March 17, 2020;
2.) Actual date of completion is: March 17, 2020;
|
|
Kabayan | Pacso | Completion of Barangay Hall Extension | 500,000.00 | General Fund | Vanvin Construction and Supply | Completed | Actual date of completion: February 27, 2020. |
|
Buguias | Buyacaoan | Construction of Gusadan Creek Flood Control | 1,000,000.00 | 20% PDF 2019 | | Completed | |
|
Sablan | Poblacion | Construction of Multi-Purpose Gym, at Poblacion Elementary School, Sablan, Benguet | 4,000,000.10 | 20% PDF CY 2019 | Anas Construction | Completed | |
|
Itogon | Tuding | Rehabilitation of Tuding - Manga - Luneta Road | 1,000,000.00 | LDRRMF Trust Fund 2019 | ICO Construction Services | Completed | |
|
Buguias | Sebang | Construction of Waterworks System for Bacasen - Wakit Elementary School | 1,500,000.00 | SEF 2019 | JYP General Construction | Completed | |
|
Kapangan | Balakbak | Construction of Balakbak Elementary School Comfort Room and Wash Station | 500,000.00 | SNAP Benguet & SB #1 CY 2019 | Vanvin Construction and Supply | Completed | 1.) Suspended on March 17, 2020 due to COVID;
2.) Date resumed: July 20, 2020. |
|
Bokod | Nawal | Construction of Slope Protection along Nawal FMR | 600,000.00 | General Fund CY 2019 | N-J Construction | Completed | 1.) Original target date of completion: December 21, 2019; Suspended due to ongoing DPWH widening project;
2.) Date resumed: August 22, 2020.
|
|
Buguias | Buyacaoan | Construction of concrete pavement along Peggueyna FMR | 1,000,000.00 | SB # 01- CY 2019 | Tepanlu construction & Supply | Completed | 1.) Suspended on November 19, 2019;
2.) Resumed on March 5, 2020;
3.) Suspended again on March 17,2020 due to community quarantine;
4.) Resumed on September 12, 2020;
5.) Actual date of completion: September 16, 2020. |
|
Buguias | Poblacion | Improvement of insalong-lower naybo-bengad FMR | 3,000,000.00 | SB # 03- CY 2019 & 20% PDF | MXC Construction | On going | Suspended on March 17,2020 due to community quarantine.
|
|
Kapangan | Paykek | Construction of Flood Control w/ slope protection at the Municipal ground | 4,000,000.00 | 20% PDF CY 2019 | Bolos Engineering and Construction | On going | Suspended on March 17,2020 due to community quarantine.
|
|
La Trinidad | Puguis | Improvement of Kibungan Village FMR | 500,000.00 | 20% PDF - 2019 | Sangin General Construction | Terminated | Terminated as of Jan 30, 2020.
|
|
Bakun | Sinacbat | Opening of Makbas to Tenglawan Farm to Market Road | 1,000,000.00 | SB #03 CY 2019 & 20% PDF | FMC Warriors Construction | Completed | 1.) Suspended effective on March 10,2020 due to procurement of ECC;
2.) Original target date of completion: April 28, 2020.
|
|
Kabayan | Ballay | Improvement of Darat-Lower Tamangan Farm to Market Road | 3,000,000.00 | SB #03 CY 2019 | Jamil Sean Construction | Completed | |
|
Kabayan | Ballay | Improvement along Taaw-Luban FMR | 1,000,000.00 | SB #03 CY 2019 | Jamil Sean Construction | Completed | |
|
Kabayan | Ballay | Improvement along Akikian-Lindawan (Besocol) FMR | 1,000,000.00 | SB #03 CY 2019 | Jamil Sean Construction | Completed | 1.) Suspended on March 17, 2020 due to community quarantine;
2.) Date resumed: September 4, 2020;
3.) Actual date of completion: October 12, 2020. |
|
Kapangan | Gadang | Rehabilitation of Gadang FMR | 1,200,000.00 | 20% PDF CY 2019 | EKC Construction & Aggregates | Terminated | Project lapsed, recommended for termination.
|
|
Mankayan | Balili | Improvement of Mogao-Dimoyog FMR | 1,000,000.00 | SB #03 CY 2019 - 20% PDF | ZMC General Construction | Terminated | Recommended for termination due to blacklisting.
|
|
Mankayan | Bulalacao | School perimeter riprapping at Balili National High School-Cabacab annex | 750,000.00 | SEF CY 2019 SB# 02 | Layad General Engineering Construction & Aggregates | Completed | 1.) Suspended on March 19,2020 due to community quarantine.
2.) Resumed on July 11, 2020.
3.) Completed on August 1, 2020.
|
|
Mankayan | Bulalacao | Improvement of Caew (Posdo)- Bulalacao FMR | 2,000,000.00 | SB #03 CY 2019 20% PDF | Sharamelle Construction and Engineering | Completed | 1.) Suspended on March 23, 2020 due to community quarantine;
2.) Resumed on October 4, 2020.
|
|
Sablan | Poblacion | Construction of multi-purpose gym @ Poblacion Elem. School | 4,000,000.00 | 20% PDF CY 2019 | Anas Construction | On going | Suspended on March 17,2020 due to community quarantine.
|
|
Tublay | Tuel | Construction of Slope Protection at Sitio Asin beside Sayangan footbridge | 2,400,000.00 | General Fund CY 2019 | Polo Engineering & Construction | On going | |
|
Bakun | Dalipey | Construction of Flood Control at Sitio Lower Sipitan | 2,000,000.00 | 20% PDF CY 2019 | Apaklo Kin Construction & Eng'g Services | Completed | |
|
Buguias | Poblacion | Improvement of Giweng - Kimpit - Amlimay Farm to Market Road | 1,000,000.00 | SB #3, CY 2019 | MXC Construction | Completed | Original target completion date: September 4, 2020. |
|
Buguias | Baculungan Sur | Improvement of Paneg-an - Obanga Farm to Market Road | 2,000,000.00 | 20% PDF & SB #3, CY 2019 | JYP General Construction | Completed | |
|
Mankayan | Balili | School Perimeter Riprapping at Dagadag Elementary School | | SEF CY 2019 | Baldas Construction | Completed | |
|
Buguias | Sebang | Improvement of Pasbol - Motyokna Farm to Market Road | 2,000,000.00 | SB #3, CY 2019 | JYP General Construction | Completed | |
|
La Trinidad | Puguis | Improvement of Kibungan Village Farm to Market Road | 500,000.00 | 20% PDF, CY 2019 | Layad General Engineering, Construction & Aggregates | Completed | Actual date of completion: September 8, 2020. |
|
Kabayan | Batan | Rehabilitation of Lower Batan Farm to Market Road | 2,000,000.00 | LDRRMF Trust Fund | QPJ General Engineering Construction and Supply | Completed | Actual date of completion: September 23, 2020. |
|
Tublay | Baayan | Reconstruction of Barangay Health Station | 1,500,000.00 | SB #1, CY 2019 | Emnar Construction and Engineering Services | Completed | |
|
Kibungan | Badeo | Improvement of Badeo School Ground and Fencing | 500,000.00 | SEF | JMLP Builders | Completed | 1.) Original target date of completion: June 23, 2020.
2.) Actual date of completion: October 4, 2020. |
|
Tuba | Ansagan | Construction of Concrete Drainage Canal at Evelio Javier Memorial National High School | 500,000.00 | SEF | Aroboan Construction and Supply | Completed | |
|
Kabayan | Gusaran | Construction of Flood Control at Gusaran | 3,000,000.00 | SB #3, 2019 | Vanvin Construction and Supply | Completed | |
|
Mankayan | Balili | Construction of Two-Storey Palpaltogan Child Development Center and Multi-Purpose Hall | 1,500,000.00 | SEF | Layad General Engineering, Construction and Aggregates | Completed | |
|
Tuba | San Pascual | Improvement of the Access Road at the Benguet Animal Learning Site and Farm Tourism | 2,000,000.00 | SB #1, CY 2019 | Roben Runas Construction | Completed | |
|
Kabayan | Kabayan Barrio | Construction of Elbag to Kinapol Footbridge | 1,000,000.00 | SB #3 CY 2019 | Botjack Construction | Completed | Original target date of completion: November 20, 2020 |
|
Buguias | Loo | Improvement of Modayan Becaeg Kitongan Farm to Market Road | 1,000,000.00 | 20% PDF CY 2019 | Potpotan General Construction | Completed | |
|
Kabayan | Tawangan | Improvement of Aw-awa to Ankatit Farm to Market Road | 1,500,000.00 | SB #3 CY 2019 & 20% PDF | Jamil Sean Construction | Completed | |
|
Bakun | Gambang | Improvement of Sookan - Gambang Farm to Market Road | 4,000,000.00 | SB #3 CY 2019 | Drichloui Construction | Completed | |
|
Tublay | Central Tublay | Improvement of Tublay School of Home Industries Extension Grounds | 2,000,000.00 | General Fund 2019 | Apwaltz Construction Services and Supplies | Completed | |
|
Sablan | Bagong | Construction of Riprap along Bito - Cayapes Farm to Market Road | 300,000.00 | LDRRMF Trust Fund CY 2017 | Bolos Construction | Completed | |
|
Buguias | Bangao | Improvement of Cotcot - Bolinaca Farm to Market Road | 500,000.00 | General Fund CY 2020 | On Top Construction | Completed | |
|
Bakun | Dalipey | Improvement along Bengdana - Bao-edan Road | 1,000,000.00 | 20% PDF CY 2020 | Apaklokin Construction & Engineering Services | Completed | |
|
Bakun | Dalipey | Improvement along Sayangan - Toplao Farm to Market Road | 1,000,000.00 | 20% PDF CY 2020 | NAIR Construction and Engineering | Completed | |
|
Buguias | Sebang | Improvement Suyong - Malmalbeng Farm to Market Road | 1,000,000.00 | 20% PDF CY 2020 | On Top Construction | Completed | Original target date of completion: August 26, 2020 |
|
Atok | Paoay | Improvement of Paoay Barangay Hall | | General Fund CY 2020 | Vanvin Construction and Supply | Completed | |
|
Bokod | Bila | Construction of Concrete Pavement at Balangabang Degiw Farm to Market Road | 500,000.00 | 20% PDF, CY 2020 | Sherfelias Construction | Completed | |
|
La Trinidad | Wangal | Construction of Sidewalk with Railings and Fence along Stockfarm Road (near PDRRMO and Allied Building) | 1,500,000.00 | LDRRMF Trust Fund | MXC Construction | Completed | Actual date of completion: October 7, 2020. |
|
Buguias | Baculongan Sur | Improvement of Obanga - Dekan - Lengaoan Farm to Market Road | 500,000.00 | 20% PDF, CY 2020 | JNA Construction and Supply | Completed | Actual date of completion: October 10, 2020. |
|
Tuba | Camp 6 | Construction and Installation of Waterworks System at Golden Eagle Tollgate | 700,000.00 | 20% PDF 2020 | AMPSLEO Construction | Completed | |
|
Mankayan | Colalo | Improvement of Bonie - Salingay Farm to Market Road | 1,000,000.00 | 20% PDF, CY 2020 | DIPAS Builders | Completed | |
|
Buguias | Natubleng | Concreting of Apanberang ABB - Upper Patkiaw Road | 1,000,000.00 | 20% PDF, CY 2020 | Potpotan General Construction | Completed | |
|
Buguias | Loo | School Improvement of Pan-ayaoan Elementary School, Pan-ayaoan, Loo | 1,000,000.00 | SEF CY 2020 | On Top Construction | Completed | |
|
Tuba | Poblacion | Construction of Erosion Control | 1,000,000.00 | 20% PDF, CY 2020 | Roben Runas Construction | Completed | |
|
Sablan | Bagong | Concreting of Footpath with Railings along Bito to Tofil Footpath | 500,000.00 | General Fund CY 2020 | Bolos Engineering and Construction | Completed | |
|
La Trinidad | Alapang | Construction of Flood Control at Alapang Proper (Sagubo Area towards Ogas Area) | 1,000,000.00 | 20% PDF CY 2020 | Anitos Construction | Completed | |
|
Mankayan | Guinaoang | Construction of Riprap (9 meters high by 45 meters long) on the Side of Guinaoang National High School Gymnasium | 1,000,000.00 | SEF CY 2020 | Apwaltz Construction Services and Supplies | Completed | |
|
La Trinidad | Tawang | Construction of footpath with railings near Bautista Area to Boted, Tawang | 500,000.00 | General Fund CY 2020 | QPJ General Engineering Construction and Supply | Completed | Actual date of completion: November 14, 2020. |
|
Buguias | Amgaleyguey | Improvement of Junction 204 - Aguday Amgaleyguey Road | 500,000.00 | 20% PDF CY 2020 | | Completed | |
|
Tublay | Daclan | Improvement of Malanac-Shekdan Road | 1,000,000.00 | 20% PDF 2020 | Anas Construction | Completed | |
|
Mankayan | Bedbed | Rehabilitation of Longlong-Payeo Road | 1,000,000.00 | 20% PDF CY 2020 | Layad General Engineering Construction and Aggregates | Completed | |
|
Mankayan | Bedbed | Construction of Concrete Pavement along Degway-Payeo Road | 1,000,000.00 | 20% PDF CY 2020 | Layad General Engineering Construction and Aggregates | Completed | |
|
Buguias | Baculongan Norte | Improvement of JPMR-BPLS-PUGO-CUDAL-LAMMANGAN-JFMR OCDL (Tupinaw Section) | 1,000,000.00 | 20% PDF CY 2020 | Potpotan General Construction | Completed | |
|
Buguias | Loo | Improvement of JPMR - LANAS - TABA-AO Sumilalaw JPMR BPLS (Upper Togtogyon Section) | 1,000,000.00 | 20% PDF CY 2020 | Potpotan General Construction | Completed | |
|
Mankayan | Balili | Improvement of Pasna-an - Ayosep Community / Barangay Road | 1,000,000.00 | General Fund CY 2020 | Baldas Construction | Completed | |
|
Tuba | Camp 3 | Improvement of eroded portion beside Philex Mines Elementary School | 1,000,000.00 | 20% PDF CY 2020 | Ampsleo Construction | Completed | |
|
Bakun | Poblacion | Installation of hand railings going to Mt. Kabunian, Bakun | 400,000.00 | General Fund 2020 | Pulicay Grandson's Construction | Completed | |
|
Tuba | Camp 6 | Construction of shed with railings from EJMNH to Gusaran, Camp 6, Tuba | 2,000,000.00 | General Fund 2020 | Rigne General Construction | Completed | |
|
Buguias | Amgaleyguey | Improvement of JFMR - NMS Baso Road | 1,500,000.00 | 20% PDF CY 2020 | BTCJR Construction and Engineering Services | Completed | Actual date of completion: January 17, 2021. |
|
Buguias | Abatan | Improvement of Hospital Canal at Northern Benguet District Hospital | 500,000.00 | 20% PDF CY 2020 | Potpotan General Construction | Completed | |
|
Buguias | Baculongan Norte | Improvement of Pugo Farm to Market Road | 1,000,000.00 | 20% PDF CY 2020 | On Top Construction | Completed | |
|
Buguias | Sebang | Improvement of Panig-an Tamangan Farm to Market Road (Suyong Section) | 1,000,000.00 | 20% PDF CY 2020 | On Top Construction | Completed | Actual date of completion: January 12, 2021. |
|
Tuba | Ansagan | Construction of 8x8 water tank with 25 rolls 3/4" hose pipe | 500,000.00 | 20% PDF CY 2020 | Mandiit Construction Services | Completed | |
|
La Trinidad | Alno | Improvement / Rehabilitation along Alno-Tuel-Balway Provincial Road | 2,000,000.00 | LDRRMF CY 2020 | Sandstream Construction | Completed | Actual date of completion: January 18, 2021 |
|
Bakun | Ampusongan | Improvement of Riverside Sawmill Access Road | 600,000.00 | PDF CY 2020 | Apaklo Kin Construction & Engineering Services | Completed | |
|
Buguias | Baculungan Sur | Improvement of Man-asok Kaula-an to Sabeng Anito Farm to Market Road | 1,000,000.00 | PDF CY 2020 | On Top Construction | Completed | |
|
Buguias | Poblacion | Improvement of Open Gym | 500,000.00 | General Fund CY 2020 | Wacaden Construction | Completed | |
|
Mankayan | Poblacion | Construction of Panad Multi-Purpose Building, Panad West (Phase II) | 1,000,000.00 | PDF CY 2020 | Eugao Construction | Completed | Actual date of completion: February 1, 2020. |
|
Buguias | Loo | Construction of Pusong Flood Control | 500,000.00 | 20% PDF CY 2020 | Potpotan General Construction | Completed | |
|
Buguias | Loo | Improvement of Togtogyon, Loo Road Section Farm to Market Road | 1,000,000.00 | 20% PDF CY 2020 | Potpotan General Construction | Completed | |
|
Bakun | Sinacbat | Construction of Permanent Fence of Alicay-Segundo Elementary School | 500,000.00 | SEF CY 2020 | SRBA General Construction | Completed | |
|
Kibungan | Palina | Road Opening at Batbato - Nay-a Access Road | 2,000,000.00 | 20% PDF CY 2020 | LBJ Construction | Completed | Actual date of completion: February 19, 2021. |
|
Itogon | Ampucao | Improvement of Ground and Construction of Basketball Court, Upper Camp, Ampucao | 1,500,000.00 | GF CY 2019 | Babecor Builders | Completed | |
|
Mankayan | Tabio | Improvement along Mankayan Bato Provincial Road | 5,000,000.00 | 20% PDF 2019 | Layad Gen. Engineering, Construction & Aggregates | Completed | |
|
Buguias | Bad-ayan | Improvement along Bad-ayan - Manhuyhoy Provincial Road | 5,000,000.00 | 20% PDF 2019 | JYP General Construction | Completed | |
|
Tuba | Tadiangan | Construction of Police Outpost and Tourism Information and Assistance Center at Tadiangan, Tuba | 1,500,000.00 | 2015 GF & 20% PDF 2015 | SAPDOY Enterprises | Completed | Completed |
|
Tuba | Camp 1 | a.) Reconstruction of Public Market Building, Klondykes, Camp 1; b.) Construction of Market (additional) Camp 1, Tuba | 2,165,000.00 | 20% PDF CY 2015 & 20% PDF CY 2016 | roben runas construction/roben runas | Completed | Clustered project (different fund & titles) a) reconst of Public Market Bldg Klondykes @ Camp , Tuba; b) const of market (add'l) @ Camp 1, Tuba |
|
Tublay | Tublay Central | a) Construction of Tanibao Footbridge; b) Construction of Tanibao Foot Bridge (Additional) | 500,000.00 | 20% PDF - 2016 & SB No. 1 - 2017 | Pulicay's Grandson Construction | Completed | Completed = 07/10/2018 |
|
Itogon | Ampucao | Construction of drainage canal, Dontog, Dalicno | 1,000,000.00 | SB No. 2 CY 2016 | renton engineering and services/ enrique waldo | Completed | |
|
Kapangan | Balakbak | Construction of Barangay Health Station (Phase III and Additional) | 1,500,000.00 | General Fund CY 2017 20% PDF CY 2016 | Balangcod Construction | Completed | |
|
Kabayan | Eddet | Construction of Eddet Barangay Hall Comfort Rooms | 375,000.00 | General Fund CY 2015 SB No. 5 CY 2015 | akiki builders/ ruben aguinse | Completed | Completed and usable with liquidated damages |
|
La Trinidad | Poblacion | Construction of Provincial Jail MPB at the Capitol Compound | 1,000,000.00 | General Fund CY 2015 All Office, SB No. 9 CY 2015 | almond engineering and construction/ rogelio alimo | Completed | |
|
Kapangan | Pudong | Completion of Barangay Health Station at Pudong, Kapangan | 800,000.00 | SB #2 GF 2015 | Four Brothers Construction | Completed | Completed.(Revised target date= 06/24/2019 ) |
|
Bokod | Ambuclao | Rehabilitation of Banao Footbridge | 600,000.00 | GF (2015 LDRRMF lumpsum) | BLDY Eng'g & Construction | Completed | |
|
Sablan | Banangan | Construction of Historical Marker at Dakis Viewdeck ,Sablan | 100,000.00 | SB # 05 - 2015, GF | Anas Construction | Completed | Completed |
|
La Trinidad | Betag | Construction of Multi-purpose Building (DCC), Construction of Building at Betag (Additional), Construction of Betag Barangay Hall (Additional) | 2,000,000.00 | General Fund CY 2015, SB No. 2 CY 2015, SB No. 2 CY 2016 GF | Symon Engineering and Construction | Completed | partial payment poc, const multi purpose bldg dcc betag la trinidad, const multi purpose bldg betag, const betag brgy hall |
|
La Trinidad | Balili | Construction of Sidewalk Shed-Halsema Road to UCCP Church, Balili, La Trinidad, Benguet | 700,000.00 | SB No. 2 GF CY 2016 | SEJ Construction and Aggregate | Temporarily suspended | 1) The contractor submitted a letter for suspension due to the site issues
2) Suspended on April 30, 2018 because the BSU management is against the project since part of the structure to be put up will encroach their property.
3) Update as of June 2019 |
|
Buguias | Amlimay | Improvement of Guioeng Kimpit FMR, Amlimay, Buguias, Benguet | 200,000.00 | SB#02CY2016-GF Non Office | Juricmarc Construction | Completed | |
|
Kapangan | Pudong | Improvement of Cabilisan FMR | | SB # 02-2016,GF | 787,011.57 | Completed | Completed .Revised Target Date= 01/05/2019
|
|
Buguias | Catlubong | Construction of Padang - Palakad Footpath in Catlubong | 350,000.00 | SB # 2-2016, GF | On Top Construction | Completed | |
|
Mankayan | Balili | Fencing of Balili National High school in Balili, Mankayan, Benguet | 100,000.00 | SB # 2 - 2016, GF | Baldas Construction | Completed | |
|
Kapangan | Gadang | Conctruction of Concrete Footbridge at Gadang, Kapangan | 412,000.00 | SB # 02-2016, GF01 | Four Brothers Construction | Completed | Completed with LD
|
|
Tuba | Camp 4 | Construction of Flood Control Riverside, Camp 6, Tuba | 500,000.00 | SB No. 2 & GF CY 2016 | Roben Runas Construction | Completed | |
|
La Trinidad | Wangal | Improvement of Benguet Housing Project, Block 1, Phase II Alley, Wangal, La Trinidad, Benguet | 540,000.00 | SB No.1 GF CY 2017 (PEO) | SEJ Construction and Aggregate | Completed | Completed September 5, 2018 |
|
Mankayan | Bulalacao | Construction of Senior Citizens Building (Phase II), Bulalacao, Mankayan | 1,500,000.00 | SB # 01-2017, GF | Sharamalle Construction & Gen. Engineering | Completed | |
|
Tuba | Tabaan Norte | Improvement of Bonungbong-Toybungan FMR, Tabaan, Norte | 500,000.00 | SB # 01-2017-GF | Juricmarc Construction | Completed | Completed. Revised Target Date = 01/06/2019 |
|
Itogon | Dalupirip | Construction of Laurencio Fianza NHS Annex TLE Classroom at Bantic, Dalupirip, Itogon | 1,000,000.00 | SB # 1-2017, GF | SRBA General Construction | Completed | Completed.Revised Target Date = 26/03/2019
|
|
Itogon | Dalupirip | Construction of Vermi Compost Shed, Bantic, Itogon, Benguet | 220,000.00 | SB # 1-2017, GF | SRBA General Construction | Completed | Completed and Usable. |
|
Kibungan | Tacadang | Construction of Lamagan-Litalit View Deck at Batangan, Tacadang, Kibungan, Benguet | 600,000.00 | SB # 1-2017, GF | Malco Construction | Completed | |
|
Mankayan | Sapid | Improvement/Extension of Senior Citizen's Multi-Purpose Building Sapid, Mankayan, Benguet | 500,000.00 | SB # 1-2017, GF | Sandstream Construction | Completed | Completed |
|
Mankayan | Colalo | Improvement of Busan FMR, Colalo, Mankayan, Benguet | 800,000.00 | SB # 01 - 2017, GF | Malco Construction | Completed | Completed on August 30, 2018
Revised Target date of completion - September 9, 2018 |
|
La Trinidad | Poblacion | Improvement of access road (phase II) at Windy Hill, Central Buyagan | 1,000,000.00 | SB #2 2018 General Fund PEO | BTCJR Construction and Eng'g Services | Completed | |
|
Kibungan | Sagpat | Construction of Sagpat Gymnasium, Sagpat | 2,300,000.00 | General Fund - Non Office CY 2017, PSBF CY 2016 | Drichloui Construction | Completed | Additional fund: Php 1,500,000.00 under PSBF CY 2016;
Has a total ABC of Php 2,300,000.00
Partial accomplishment, Clustered "C" Project - a) const of sagpat gym @ sagpat, kibungan; b) const of gym for sagpat E/S @ Sinagpat, Kibungan (Add'l) |
|
Kapangan | Paykek | Road upgrading and improvement of Lomon-Sagubo provincial road, Kapangan, Benguet | 63,829,590.00 | CMGP 2018 | Jomarcann General Construction | Completed | |
|
Mankayan | Guinaoang, Suyoc, Gambang | Road upgrading and improvement of Guinaoang - Suyoc - Gambang Provincial Road (Phase II) | 44,000,000.00 | CMGP | Rodekom General Construction | Completed | Completed and usable, Geo-tagged on October 30, 2019. |
|
La Trinidad | Beckel | Installation of complete electrical system of Barangay Beckel Senior Citizens | 100,000.00 | SB#1 2018 | Haight's Construction | Completed | Inspection was done on March 1, 2019.
Electrical wiring was completed but, the there is no connection yet with BENECO Power and electrical post and meter is not yet installed. |
|
Buguias | Sebang | Construction of Tamangan - Wakit - Bacasen Primary School Gymnasium, Construction of Bacasen - Wakit Elementary School Gymnasium (Phase 2) | 5,000,000.00 | 20% PDF CY 2016 SB No. 2 CY 2016 | JYP General Construction | Completed | final payment - a) const of tamangan-wakit-bacasen P/S gym, sebang (phase I); b) const of bacasen wakit E? gym (phase II) @ sebang |
|
Kapangan | Sagubo | Rehabilitation of Landing - Bileng FMR at Sitio Bileng | 600,000.00 | Gen. Fund 2019 | Bolos Eng'g and Construction | Completed | |
|
Tublay | Daclan | Improvement of Open Gym, Daclan, Tublay, Benguet | 500,000.00 | SB-03 CY 2019 | Right Achor Construction | Completed | Project Engineer: John G. Pilay
Quality Control Representative: Harris Bill T. Palangdan |
|
Buguias | Baculungan Sur | Improvement Along Palinta-Ang-Abbao FMR, Baculungan Sur | 1,000,000.00 | GF 2019 | On Top Construction | Completed | Project Engineer: Arthur P. Banasan
QC Representative: Engr. Teofilo Lacaden |
|
Buguias | Baculungan Sur | Improvement along Bad-ayan - Balintag -Deckan - BPI Baculungan Sur, Buguias, Benguet (156 Malsema Creek Riprap) Buguias, Benguet | 1,000,000.00 | SB # 3 2019 | Potpotan General Construction | Completed | Project Engineer: Arthur P. Banasen
Quality Control Representative : Engr. Teofilo Lacaden |
|
Bakun | Apusongan | Opening and Improvement of Palitay-Kegangan FMR, Ampusongan, Bakun, Benguet | 800,000.00 | GF 2017 | | Completed | Project Engineer: Devereux Khyle Heinrich A. Oliano
QC: Mosi
Geotagged by: JC |
|
Sablan | kamog | Construction of Retaining Wall Along Balluay-Bagong FMR (Peril Section), Bagong, Sablan | 1,700,000.00 | LDRRMF | Bolos Eng'g and Construction | Completed | Project Engineer: Santos Asan
QC: Engineer Lacaden
Geotagged by: JC |
|
Sablan | Bagong | Construction of Foot Path and Railing Stallation along Depuac, Buyagan, Bagong, SablanAlong Depuac | 500,000.00 | 20% PDF | Bolos Eng'g and Construction | Completed | Project Engineer: Santos Asan
QC: Engr. Teofilo Lacaden
Geotagged by: J G. C |
|
Kapangan | Cayapes | Construction of Daycare Center, at Cayapes, Kapangan, Benguet | 350,000.00 | 20% PDF 2012 | On Top Construction | Completed | |
|
Atok | Paoay | Completion of 2-Storey Multi-Purpose Building | 200,000.00 | 20% PDF CY 2013 | leo heirs construction/ emmanuel leo | Completed | Completed with slippage |
|
La Trinidad | Poblacion | Construction of Daycare Center (Additional), Kesbeng | 1,000,000.00 | 20% PDF CY 2013 | on top construction/ thomas palileng | Completed | |
|
Tuba | Tadiangan | Construction of Water Distribution Tank at Lower Ampusa, Yagyagan, Tuba | 201,408.00 | 20% PDF 2013 | Anas Construction | Completed | |
|
La Trinidad | Beckel | Construction of Waterworks System, Beckel Community, Beckel, La Trinidad, Benguet | 400,000.00 | 20% PDF - 2014 | Bemeda Construction | Completed | |
|
Atok | Paoay | Tirepathing of Togontongao FMR | 500,000.00 | 20% PDF CY 2015 | JCA General Construction and Engineering Services | Completed | Part of Clustered A projects, - b) completion of pathway shed, adoyunan elem school @ abiang, atok; c) concreting of boneng elem school grounds, boneng, naguey at atok d) tirepathing of tagontongaw FMR |
|
Bakun | Ampusongan | Construction of Concrete Tirepath along Gayabasan to Dalipey FMR | 650,000.00 | 20% PDF CY 2015 | Reasons Construction | Completed | Cluster "B" a) Control No. 02-16-00009 b) Control No. 02-16-00010 - Reasons Construction
contract clusterd b, a)imp of nursery bldg, bagtangan e/s; b)concreting of maudong-baoy pathway; c)const of concrete tirepath along gayabasan-dalipey FMR |
|
Bokod | Daclan | Improvement of Supply Room, DMMH | 1,000,000.00 (clustered) | 20% PDF CY 2015 | Summerlin Construction | Completed | contract under cluster d: a) const of mrf dmdh; b) imp of supply room, dmdh; c) const of shaded parking for hospital vehicles, dmdh (daclan, bokod) |
|
Buguias | Abatan | Construction of Concrete Pavement of Nakiangan FMR to the Turning Point | 400,000.00 | 20% PDF CY 2015 | hgw=3 engineering & construction/hilbert willie | Completed | For Post Inspection |
|
Kabayan | Lusod | Construction of Cabulao - Hoyocto FMR | 500,000.00 | 20% PDF CY 2015 | 4 Brothers Construction | Completed | Completed and usable with underrun |
|
Kabayan | Adaoay | Construction of Cattle Barn/Shed at Adaoay | 500,000.00 | 20% PDF CY 2015 | solonio construction/ritchie solonio | Completed | Completed and usable with underrun |
|
Kabayan | Bashoy | Improvement of Grounds Bashoy Multi-Purpose Warehouse and Nursery Site | 500,000.00 | 20% PDF CY 2015 | 4 Brothers Construction | Completed | Completed and usable with underrun |
|
La Trinidad | Wangal | Construction of Soil less Potato Seed and Strawberry Runner Production Center | 2,000,000.00 | 20% PDF CY 2015 | Aguinsod Construction | Completed | |
|
La Trinidad | Wangal | Construction of Benguet Multi-purpse Building (Training Center) | 15,000,000.00 | 20% PDF CY 2015 | | Completed | Input the accurate coordinates of the project.
PARTIAL ACCOMPLISHMENT, re: Construction of Benguet Multi-purpose Building (training center) @ Wangal, LTB |
|
La Trinidad | Betag | Construction of Hospital Waste Management Facility | 500,000.00 | 20% PDF CY 2015 | almond engineering and construction/ rogelio alimo | Completed | Completed with approved Change Order. |
|
Mankayan | Bulalacao | Ripraping of FMR, Caew, Bulalacao, Mankayan | 500,000.00 | 20% PDF CY 2016 | balangcod construction/fermin balangcod | Completed | |
|
Kibungan | Sagpat | Improvement along Sagpat-Sapdaan Provincial Road | 2,500,000.00 | 20% PDF CY 2015 | EaJr De Leon Construction/ Edwardo De Leon Jr | Completed | Usable; 100% completed with Liquidated Damages equivalent to Php 59,766.56 |
|
Tuba | Tadiangan | Improvement along Yagyagan - Ampusa Provincial Road | 1,000,000.00 | 20% PDF CY 2015 | Guava Construction / Evelyn F. Balag-ey | Completed | Usable; 98.846% completed with underrun equivalent to Php 11,409.5 and also with Liquidated Damages equivalent to Php 6,149.03 |
|
Tublay | Caponga | Construction of PCCP along Tublay Gate - Tublay Presidensia Provincial Road | 2,000,000.00 | 20% PDF CY 2015 | balangcod construction/fermin balangcod | Completed | Usable; 97.97% completed due to underrun of Php 40,448.83
payment of partial accomplishment on the const. pccp along tublay gate-tublay presidencia prov'l road |
|
La Trinidad | Poblacion | Improvement along La Trinidad - Capitol - Bineng Provincial Road | 3,000,000.00 | 20% PDF 2015 | Anas Construction/ Dionisio L. Anas | Completed | payment is for partial accomplishment of contract on the imp. along La Trinidad-capitol-Bineng Provincial Road, LA Trinidad, Benguet |
|
Buguias | Baculongan Sur | Completion of Box Culvert at Wakallan Creek along Balintag-Dekkan-Nakga-an Road | 250,000.00 | 20% PDF CY 2015 | jyp general construction/yonie palonan | Completed | |
|
Buguias | Catlubong | Construction of Padang Footpath (Phase 1) | 100,000.00 | 20% PDF CY 2015 | On Top Construction/ Thomas R. Palileng Sr. | Completed | |
|
Kabayan | Lusod | Improvement of Riprap along Portions of Baay-Madayag FMR | 300,000.00 | 20% PDF CY 2015 | Akiki Builders | Completed | with liquidated damages |
|
Tuba | Taloy Sur | Construction of PCCP along Taloy - Bayacsan Provincial Road | 2,000,000.00 | 20% PDF CY 2015 | hdg construction and enterprises/hanivall guilando | Completed | Usable; 100% completed |
|
La Trinidad | Shilan | Improvement / Construction of PCCP along Shilan - Sagpawe Provincial Road | 1,000,000.00 | 20% PDF CY 2015 | drichloui construction/ roy balay-odao | Completed | Usable; 100% completed with Liquidated Damages equivalent to Php 9,410.87 |
|
La Trinidad | Pico | Improvement / Construction of PCCP along Pico-Stockfarm Provincial Road | 7,000,000.00 | 20% PDF 2015 | sej construction and aggregates/ mr. eric de leon | Completed | Suspended since August 12, 2016 with an accomplishment of 55.178594% |
|
Bokod | Bila | Riprapping of Balangabang-Digew FMR - Entrance | 1,500,000.00 | 20% PDF CY 2015 | Jamil Sean Construction/Barmino T. Bugnay | Completed | Completed - September 13, 2016 |
|
Itogon | Tinongdan | Construction of Comfort Room at IMH | 500,000.00 | 20% PDF CY 2015 | Jessie Construction Services | Completed | |
|
La Trinidad | Wangal | Improvement of BTS Building and Entrance Gate | 1,000,000.00 | 20% PDF CY 2015 | Guava Construction / Evelyn F. Balag-ey | Completed | Completed - August 27, 2016 |
|
Atok | Paoay | Opening of Salat - Talongtongao - Boneng FMR | 700,000.00 | 20% PDF CY 2015 SB No. 6 | DJY Construction | Completed | Completed on August 15, 2016 |
|
Buguias | Sebang | Construction of Riprap (Protective Wall) at Kamanbagang FMR | 800,000.00 | 20% PDF CY 2015 | Random Builders | Completed | |
|
Sablan | Bayabas | Construction of Greenhouse at Agri-Eco Farm, Bulala | 300,000.00 | 20% PDF CY 2015 | anas construction/ dionisio anas | Completed | |
|
Bakun | Ampusongan | Improvement and Extension of Namagtey - Mabilig Alternate Road | 500,000.00 | 20% PDF CY 2016 | safelink builders/ ponciano andiso | Completed | Completed - November 14, 2016, with liquidated damages |
|
Tuba | San Pascual | Opening and Slope Protection of Farm Access Road, San Pascual | 1,000,000.00 | 20% PDF CY 2015 | aguinsod general construction/christopher aglolo | Completed | Completed - November 16, 2016 |
|
Mankayan | Balili | Construction of Hilltop Footpath at Mankingao, Cada | 200,000.00 | 20% PDF CY 2015 | On Top Construction/ Thomas Palileng | Completed | Completed - July 18, 2016 |
|
Tuba | San Pascual | Construction of Forage Nursery and Potting Area, Tuba, Benguet | 300,000.00 | 20% PDF CY 2017 | Aguinsod Construction | Completed | Completed on April 23, 2018 |
|
Itogon | Ucab | Construction of Pathway at Sitio Midas | 200,000.00 | 20% PDF CY 2015 | MK Construction | Completed | Completed on February 13, 2018 |
|
La Trinidad | Puguis | Construction of 8x8x10 Water Tank at Paswek, Puguis, La Trinidad, Benguet | 200,000.00 | 20% PDF 2015 | Four Brothers Construction | Completed | |
|
La Trinidad | Wangal | Construction of Tirepath from Windy Hills Turning Point-Upper Gayasi, Wangal La Trinidad | 250,000.00 | 20% PDF CY 2015 | Sangin Construction | Completed | 100% Completed April 7, 2018 - Total Cost Incurred PhP 248,922.86 as of April 30, 2018 |
|
Itogon | Loacan | Concreting of Mangga - Luneta Alternate Road | 1,050,000.00 | 20% PDF 2015 | WDG Construction | Terminated | |
|
Itogon | Tinongdan | Improvement of Delivery Room,Laboratory Room,Operating Room Complex | 1,000,000.00 | 20% PDF-2015 | Boyet Builders | Completed | completed and geotag on October 2, 2019
|
|
Atok | Abiang | Completion of Pathway Shed at Adoyunan Elementary School | 150,000.00 | 20% PDF CY 2016 | JCA General Construction and Engineering Services | Completed | Satisfactorily Completed, Revised target date of completion on August 14, 2017.
Part of Clustered A projects, - a) completion of pathway shed, adoyunan elem school @ abiang, atok; b) concreting of boneng elem school grounds, boneng, naguey @ atok |
|
Atok | Naguey | Concreting of Boneng Elementary School Grounds | 200,000.00 | 20% PDF CY 2016 | JCA General Construction and Engineering Services | Completed | Part of Clustered A projects, - b) completion of pathway shed, adoyunan elem school @ abiang, atok; c) concreting of boneng elem school grounds, boneng, naguey at atok d) tirepathing of tagontongaw FMR
Clustered A projects, - a) completion of pathway shed, adoyunan elem school @ abiang, atok; b) concreting of boneng elem school grounds, boneng, naguey @ atok |
|
Bakun | Gambang | Improvement of Nagawa-Ubbon FMR | 1,000,000.00 | 20% PDF CY 2016 | Drichloui Construction | Completed | Project Completed as per Plan |
|
Bakun | Gambang | Improvement of Alam-am to Kilong FMR | 1,000,000.00 | 20% PDF CY 2016 | Drichloui Construction | Completed | Completed as per plan. |
|
Bakun | Sinacbat | Opening of Pidpid - Lamew FMR | 2,000,000.00 | 20% PDF CY 2016 | FMC Warriors Construction | Completed | 70.44% Completed with underrun. |
|
Bakun | Bagu | Improvement of Ca-ang Waterworks System | 500,000.00 | 20% PDF CY 2016 | Toclo Construction | Completed | Completed as per plan. |
|
Bakun | Gambang | Completion of Sookan Multi-Purpose Building | 500,000.00 | 20% PDF CY 2016 | drichloui construction/ roy balay-odao | Completed | Completed as per plan |
|
Bakun | Ampusongan | Completion of Multi-purpose Gym | 2,000,000.00 | 20% PDF CY 2016 | Reasons Construction | Completed | |
|
Bakun | Gambang | Improvement of School Nursery Building, Bagtangan Elementary School | 650,000.00 | 20% PDF CY 2016 | Reasons Construction | Completed | Cluster "B" - b) 02-16-00010 c) 02-15-00002 Reasons Construction
clustered B projects, a)imp of school nursery bldg, bagtangan E/S @ Gambang, bakun; b)concreting of maudang-baoy pathway, pob, bakun; c) const of concrete tirepath along gayabasan to |
|
Bakun | Poblacion | Concreting of Maudang-Baoy Pathway | 650,000.00 | 20% PDF CY 2016 | Reasons Construction | Completed | Cluster "B" a) Control No. 02-16-00009 c) Control No. 02-15-00002 - Reasons Construction |
|
Bakun | Ampusongan | Improvement of Drainage Canal | 150,000.00 | 20% PDF CY 2016 | Pulicay Grandsons Construction | Completed | Completed as per plan
Clustered, construction of catwalk shed from bakun nhs to bakun cs; b) improvement of drainage canal, ampusongan, bakun, benguet |
|
Mankayan | Suyoc | Concreting of Tambalaken FMR, Suyoc, Mankayan | 450,000.00 | 20% PDF CY 2016 | Eugao Construction | Completed | Need additional fund |
|
Bakun | Gambang | Improvement of Alibacong Child Development Center | 150,000.00 | 20% PDF CY 2016 | srba general construction/ ray angluben | Completed | Completed as per plan.
contract under cluster c: a) imp of kayapa fmr @ kayapa, bakun; b) imp of alibacong child development center @ gambang, bakun
Total payment = 542,854.14 |
|
Mankayan | Balili | Construction of Sayapot Day Care Center, Balili | 1,000,000.00 | 20% PDF CY 2016 | Toclo Construction/Elmer S.Toclo | Completed | Completed as programmed and usable, need additional fund |
|
Mankayan | Cabiten | Improvement of Las-igan Primary School ground | 100,000.00 (Clustered) | 20% PDF CY 2016 | baldas construction/samson b. benny | Completed | Completed as programmed and usable, need additional fund
contract under cluster "E" a) Improvement of Las-igan Primary School Ground, cabiten, Mankayan b)construction of concrete pathway, Camanpaguey, Mankayan, Benguet |
|
Mankayan | Guinaoang | Construction of FMR Pathway, Sakatal, Guinaoang, Mankayan | 350,000.00 | 20% PDF CY 2016 | Baldas Construction | Completed | Cluster "G" a) Control No. 03-15-00027 b) 03-15-00028 - Baldas Construction
a)construction of waiting shed @ poked, las-igan cabiten,mankayan b)tirepathing @lower doweg, guinaoang,mankayan c) const. of FMR pathway @sakatal, guinaoang, mankayan |
|
Mankayan | Bedbed | Improvement of Barangay Road, Bedbed | 500,000.00 | 20% PDF CY 2016 | sandstone mt. general construction & aggregates/ca | Completed | Completed as programmed and usable, need additional fund
|
|
Mankayan | Guinaoang | Concreting of Guinaoang Elementary School Access Road, Guinaoang | 400,000.00 (Clustered) | 20% PDF CY 2016 | malco construction/ malote copite | Completed | Completed as programmed and usable, need additional fund
clustered H project a)imp of brgy road bedbed, mankayan; b)concreting of guinaoang elem school access road |
|
Mankayan | Colalo | Reconstruction of Multi-Purpose Building, Busan, Colalo | 800,000.00 | 20% PDF CY 2016 | Malco Construction | Completed | Completed as programmed and usable, need additional fund |
|
Mankayan | Cabiten | Extension of Lucapan-Lanas to Cabali FMR | 400,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Completed as programmed and usable, need additional fund |
|
Mankayan | Suyoc | Completion of Barangay multipurpose building / hall, Suyoc | 1,000,000.00 | 20% PDF CY 2016 | eugao construction/eugenio aglasi | Completed | Completed as programmed and usable, need additional fund |
|
Mankayan | Paco | Construction of Farm to Market Road, Paco, Mankayan, Benguet | 1,000,000.00 | 20% PDF CY 2016 | jyp general construction/yonie palonan | Completed | Satisfactorily Completed, need additional fund |
|
Mankayan | Paco | Opening/ Concreting of Lamdagan Farm to Market Road | 700,000.00 | 20% PDF CY 2016 | JYP Construction | Completed | Satisfactorily Completed, need additional fund |
|
Bakun | Dalipey | Construction of Tanod Outpost | 200,000.00 | 20% PDF CY 2016 | NAIR Construction & Engineering | Completed | 1) Cluster "D" - NAIR Construction & Engineering
2) Completed on February 13, 2018 with liquidated damages.
cluster d: a) const of tanod outpost, dalipey, bakun; b) imp of alam-am-nasayotean fmr, gambang, bakun |
|
Mankayan | Cabiten | Riprapping-Biwak, Guiweng, Cabiten Mankayan | 900,000.00 | 20% PDF CY 2016 | Eugao Construction | Completed | Satisfactorily Completed and usable
clustered R project - a)riprapping of biwak gueweng, cabiten; b) const of old concrete perimeter fence balili E/S; c) brgy suyoc FMR Side riprapping @ Mankayan, Benguet
Total amount paid - 888,594.74 |
|
Mankayan | Balili | Construction of Old Concrete Perimeter Fence Balili Elementary School, Balili, Mankayan | 900,000.00 | 20% PDF CY 2016 | Eugao Construction | Completed | Completed as programmed and usable, need additional fund
clustered R project - a)riprapping of biwak gueweng, cabiten; b) const of old concrete perimeter fence balili E/S; c) brgy suyoc FMR Side riprapping @ Mankayan, Benguet |
|
Mankayan | Suyoc | Barangay Suyoc Farm to Market Road Side Riprapping | 900,000.00 | 20% PDF CY 2016 | Eugao Construction | Completed | Completed as programmed and usable
clustered R project - a)riprapping of biwak gueweng, cabiten; b) const of old concrete perimeter fence balili E/S; c) brgy suyoc FMR Side riprapping @ Mankayan, Benguet |
|
Mankayan | Cabiten | Construction of Cabiten Elementary School Stage | 800,000.00 | 20% PDF CY 2016 | Malco Construction | Completed | Completed as programmed and usable, need additional fund |
|
Mankayan | Tabio | Construction of Antangila Vehicular bridge | 1,115,000.00 | 20% PDF CY 2016 | Eugao Construction | Completed | Completed as programmed and usable |
|
Atok | Topdac | Improvement of Km. 34-Jappa FMR, Topdac, Atok, Benguet | 800,000.00 | 20% PDF CY 2016 | Hillstone Builders | Completed | |
|
Bokod | Daclan | Completion of Nutrition and Dietary Facility (Phase II) DMMH, Daclan, Bokod, Benguet | 1,000,000.00 | 20% PDF CY 2016 | Almond Engineering and Construction | Completed | with Liquidated Damages |
|
Bokod | Poblacion | Construction of Bogyo-Bolo Footbridge, Poblacion, Bokod, Benguet | 600,000.00 | 20% PDF CY 2016 | Hillbrand Engineering | Completed | Completed and usable |
|
La Trinidad | Beckel | Construction of Footpath, Obulan-Gongel, Beckel, La Trinidad, Benguet | | 20% PDF CY 2016 | | Completed | 100.00% Completed(May 29,2018) with 423,944.47 Total cost incurred |
|
Bokod | Ambuklao | Concreting of Footpath at Alo-o - Eli, Bangao, Ambuklao, Bokod, Benguet | 300,000.00 | SB No. 2 - 2016 | BLDY Eng'g & Construction | Completed | Completed as of July 31, 2018
The revised target date of completion: 07/02/2018 |
|
Bakun | Dalipey | Construction of Waterworks System, Dalipey, Bakun | 150,000.00 | 20% PDF - 2016 | SRBA General Construction | Completed | |
|
Bokod | Bila | Improvement of FMR along Gwiling-Yabo in Palansa | 100,000.00 | SB #2 CY 2016 | SRBA General Construction | Completed | |
|
Bokod | Bobok-Bisal | Daycare Center Stage and Ground Improvement, Kawal, Bobok-Bisal, Bokod | 500,000.00 | 20% PDF CY 2016 | Sangin General Construction | Completed | with Liquidated Damages |
|
Bokod | Karao | Construction of Natural Swimming Pool at Karao, Bokod, Benguet | 1,000,000.00 | 20% PDF CY 2017 | sangin general construction / sandy rafael | Completed | The barangay officials must assign personnel to be responsible for cleaning and maintenance of the swimming pool |
|
Bokod | Pito | Construction of Barangay Health Center, Pito, Bokod, Benguet | 1,500,000.00 | 20% PDF CY 2016 | Solonio Construction | Completed | Completed and usable |
|
Bokod | Karao | Construction of Busok Flood Control, Karao, Bokod | 500,000.00 | 20% PDF CY 2016 | hillbrand engineering/ hildobrando beray | Completed | 100% Completed and usable |
|
Bokod | Karao | Construction of Coral Flood Control, Karao, Bokod | 500,000.00 | 20% PDF CY 2016 | hillbrand engineering/ hildobrando beray | Completed | Completed and usable |
|
Sablan | Banangan | Construction of Socung Footpath | 150,000.00 | 20%PDF-2016 | Anas Consruction | Completed | |
|
Buguias | Sebang | Improvement of Paneg-an - Takadang - Tamangan FMR | 400,000.00 | 20% PDF CY 2016 | JYP General Construction | Completed | Completed - January 20, 2017
project under cluster "C": a) improvement of Paneg-an-Takadang-Tamangan FMR in Sebang b) Improvement of Panig-an-Tamangan FMR in Sebang, Bugias |
|
Buguias | Baculongan Sur | Completion of Maselselne Footbridge | 350,000.00 | 20% PDF CY 2016 | on top construction/ thomas palileng | Completed | Project Completed with underrun.
project contract under cluster "B" a) completion of Maselselne Footbridge at Buculungan, Bugias b)construction of Sebseb Flood Control at Buculungan Norte, Bugias, Benguet |
|
Buguias | Baculongan Norte | Construction of Sebseb Flood Control | 500,000.00 | 20% PDF CY 2016 | on top construction/ thomas palileng | Completed | Completed - January 20, 2017, Project completed with LD.
project contract under cluster "B" a) completion of Maselselne Footbridge at Buculungan, Bugias b)construction of Sebseb Flood Control at Buculungan Norte, Bugias, Benguet |
|
Buguias | Sebang | Improvement of Pasbol - Motyokna - Mankaet FMR | 1,000,000.00 | 20% PDF CY 2016 | JYP General Construction | Completed | Completed - January 30, 2017
contract under cluster "B" projects with same funding source but different project titles. a)improvement and extension of makaet-motyokna fmr, sebang buguias benguet. b)improvement of p |
|
Buguias | Baculongan Sur | Improvement Along Bad-ayan - Obanga (Paing Crossing) | 1,000,000.00 | 20% PDF CY 2016 | JYP General Construction | Completed | Completed - February 3, 2017 |
|
Buguias | Baculongan Norte | Improvement of Sumill - Palaan FMR | 150,000.00 | 20% PDF CY 2016 | Mel-Soc Construction | Completed | Completed - January 10, 2017
clustered a project - a)imp of sumili-palaan FMR; b) const of calamagan-baglaw pathway; c)const of padang-palakad footpath @ buguias, benguet |
|
Buguias | Calamagan | Construction of Calamagan - Baglaw Pathway | 100,000.00 | 20% PDF CY 2016 | mel-soc construction/engr. marveluz patian | Completed | Completed - January 5, 2017
clustered a project - a)imp of sumili-palaan FMR; b) const of calamagan-baglaw pathway; c)const of padang-palakad footpath @ buguias, benguet |
|
Buguias | Catlubong | Construction of Padang - Palakad Footpath | 500,000.00 | 20% PDF CY 2016 | mel-soc construction/engr. marveluz patian | Completed | Completed - January 20, 2017, deducted PHP 500.00 due to the substandard billboard.
clustered a project - a)imp of sumili-palaan FMR; b) const of calamagan-baglaw pathway; c)const of padang-palakad footpath @ buguias, benguet |
|
Buguias | Catlubong | Improvement of Bot-oan Elementary School Grounds | 1,000,000.00 | 20% PDF CY 2016 | Donato Sakiwat Construction | Completed | Completed February 14, 2016, revised target completion date to March 5, 2017 |
|
Buguias | Amgaleyguey | Improvement of Katodtoda FMR in Amgaleyguey | 500,000.00 | 20% PDF CY 2016 | JYP General Construction | Completed | Completed - January 23, 2017 |
|
Kapangan | Gadang | Construction of Spelin Hanging Bridge,Suyoc,Gadang,Kapangan,Benguet | 500,000.00 | 20% PDF-2016 | Family Circle Construction | Completed | |
|
Bokod | Tikey | Construction of Tickey Proper-Aran Footrail | 400,000.00 | 20% PDF CY 2016 | hillbrand engineering/ hildobrando beray | Completed | Cluster "C" a) Control No. 2-16-00268 b) Control No. 02-16-00269 d) Hillbrand Engineering
clustered C projects-a. imp of boning alternate road, pob; b)const of pangawan-eli footpath, bangao; c)const of tickey proper-aran footrail; d)const of lower dabidab footrail, tickey, bokod |
|
Bokod | Tickey | Construction of Lower Badidab Footpath, Tickey, Benguet | 100,000.00 | 20% PDF CY 2016 | hillbrand engineering/ hildobrando beray | Completed | Completed - January 23, 2017
clustered C projects-a) imp of boning alternate road, pob; b)const of pangawan-eli footpath, bangao; c)const of tickey proper-aran footrail; d)const of lower dabidab footrail, ticke |
|
Bokod | Tickey | CLUSTER: Construction of Flood Control in Betongay, Tickey, Bokod | 537,000.00 | 20% PDF CY 2016 | Vanket Engineering and Construction | Completed | Clustered b) Control No.: 02-16-00044 - Vanket Engineering and Construction
Completed - January 23, 2017
cluster e: a) const of flood control in betongay tickey, bokod; b) re-opening of kamura foot trail nawal, bokod |
|
Bokod | Nawal | Re-Opening of Kamura Foot Trail, Nawal, Bokod, Benguet | 537,000.00 | 20% PDF CY 2016 | Vanket Engineering and Construction | Completed | Clustered a) Control No.: 02-16-00043 - Vanket Engineering and Construction
clustered E projects - a) const of flood control in Botengay Tickey Bokod; b) re-opening of kamura foot trail nawal, bokod |
|
Bokod | Daclan | Construction of Material Recovery Facility (MRF) | 300,000.00 | 20% PDF CY 2016 | | Completed | |
|
Bokod | Daclan | Improvement of Supply Room, DMMH | 350,000.00 clustered | 20% PDF CY 2016 | summerlin construction and development corp/anton | Completed | cluster d: a) const of mrf dmdh; b) imp of supply room, dmdh; c) const of shaded parking for hospital vehicles, dmdh (daclan, bokod) |
|
Bokod | Bobok-Bisal | Improvement of Yapos Farm to Market Road-Bobok | 500,000.00 | 20% PDF CY 2016 | Lincee General Construction | Completed | |
|
Bokod | Bobok-Bisal | Widening of Ngano-an to Polis Foot Trail, Bobok-Bisal, Bokod | 70,000.00 | SB No. 2 CY 2016 | AG Chungalan Construction | Completed | |
|
Bokod | Ambuklao | Construction of Waiting Shed, Bayembeng, Bangao | 220,000.00 | 20% PDF CY 2016 | AG Chungalan Construction | Completed | Completed on January 31, 2018 |
|
Bokod | Ekip | Concreting of FMR at Ekip, Bokod, Benguet | 150,000.00 | 20% PDF CY 2016 | AG Chungalan Construction | Completed | |
|
Buguias | Baculongan Norte | Construction of Multi-purpose Building (Additional), Baculongan Norte | 700,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Completed on April 26, 2017 |
|
Buguias | Abatan | Completion of Buguias Federation Senior Citizen's Association Multi-Purpose Building, Completion of Buguias Federation Senior Citizen's Association MPB Phase II | 2,000,000.00 | 20% PDF CY 2016 | JYP General Construction | Completed | Satisfactorily Completed with LD. Revised target completion date to May 6, 2017
A)completion of buguias federation senior citizen ass'n. multi-purpose bldg. B)completion og Buguias federation ass'n multi-purpose bldg. phase II @ abatan buguias |
|
Buguias | Bangao | CLUSTER: Improvement of Halsema - Gulodan FMR at Bangao | 650,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Clustered b) Control No.: 02-16-00057 - On Top Construction
Completed on July 1, 2017 |
|
Buguias | Loo | Construction of Loo Elementary School Athletic Oval Retaining Wall | 850,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | CLUSTERED b) Control No. 02-16-00063 c) 02-16-00056- On Top Construction
Clustered "H" Projects - a) const of Loo E/S athletic Oval Retaining Wall @ Loo, Buguias; b)impv't of Obanga Day Care Center Grounds @ Baculungan Sur, Buguias |
|
Buguias | Baculongan Sur | Improvement of Obanga Day Care Center Grounds | 850,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | CLUSTERED- a) Control No.: 02-16-00055 b) 02-16-00063 - On Top Construction
Completed on June 19, 2017 |
|
Buguias | Poblacion | Improvement of Asinan Creek and Hot Spring | 650,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Clustered a) Control No.: 02-16-00054- On Top Construction Completed on June 25, 2017 |
|
Buguias | Baculongan Norte | Improvement of Lam-ayan FMR | 600,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Clustered b) Control No.: 02-16-00059 - On Top Construction
Completed on June 16, 2017 |
|
Buguias | Baculongan Norte | Construction of Sebseb - Takadang Creek Flood Control | 600,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Clustered a) Control No.: 02-16-00058 - On Top Construction
Completed on June 23, 2017 |
|
Buguias | Amlimay | Construction of Tonglo Domestic Water Supply | 200,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Revised target completion date to November 24, 2017 |
|
Buguias | Amlimay | Extension/Improvement of Damang - Besbes FMR | 500,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Completed and post inspected on April 4, 2018 |
|
Buguias | Amgaleyguey | Construction of Riprap along Nansabatan - Baso FMR | 400,000.00 | 20% PDF CY 2016 | Bosongan Construction | Completed | |
|
Buguias | Loo | Construction of Baybay Footbridge | 850,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | CLUSTERED- a) Control No.: 02-16-00055 C) 02-16-00056 - On Top Construction |
|
Buguias | Catlubong | Improvement / Extension of Abatan - Gatiley Luboy FMR | 1,000,000.00 | 20% PDF CY 2016 | ICO Construction | Completed | Temporarily suspended November 6, 2017 pending issuance of CNC from DENR. |
|
Buguias | Poblacion | Opening of Lower Naybo - Benged FMR, Cayabyab | 1,000,000.00 | 20% PDF CY 2016 | Hillstone Builders | Completed | 75% Completed - Total Cost Incurred PhP 746,153.25 as of April 30, 2018 |
|
Buguias | Amlimay | Improvement of Guioeng - Kimpit FMR | 500,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | Completed on December 16, 2017 |
|
Itogon | Dalupirip | Improvement of Waterworks System at Calew | 650,000.00 | 20% PDF CY 2016 | Jessie Construction Services | Completed | Cluster "C" - Control No.: 02-16-00068 Jessie Construction Services |
|
Itogon | Dalupirip | Improvement of Sayo Waterworks System | 650,000.00 | 20% PDF CY 2016 | Jessie Construction Services | Completed | Cluster "C" - Control No.: 02-16-00067 Jessie Construction Services
a)imp. of waterworks system @ calew b)imp. of sayo waterworks system @ dalupirip |
|
Itogon | Ampucao | Improvement of foot trail from Dam3 going to Viewdeck of San Roque Dam in Ampucao | 500,000.0 | 20% PDF CY 2016 | Babecor Builders | Completed | |
|
Itogon | Ampucao | Improvement of riprap at PLDT-Cruz road | 1,000,000.00 | 20% PDF CY 2016 | Aljune Builders | Completed | |
|
Itogon | Dalupirip | Improvement of Karil FMR | 800,000.00 | 20% PDF CY 2016 | Jessie Construction Services | Completed | |
|
Itogon | Gumatdang | Construction of Orengao-Muyot Footbridge | 500,000.00 | 20% PDF CY 2016 | Compass Rose Builders | Completed | |
|
Kabayan | Ballay | Improvement along Bagto - Bacanganga FMR | 1,000,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | |
|
Kabayan | Gusaran | Construction of Shed, Barangay Ground | 1,500,000.00 | 20% PDF CY 2016 | Solonio Construction | Completed | |
|
Kabayan | Gusaran | Construction of Culture and Arts Building at Kamora National High School (Phase 2) | 1,000,000.00 | 20% PDF CY 2016 | Solonio Construction | Completed | |
|
Kabayan | Ballay | Improvement of Tongotong FMR | 1,500,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | |
|
Kabayan | Ballay | Improvement of Dinamili - Bolagabog Takitak FMR | 1,070,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | |
|
Kabayan | Bashoy | a) Construction (Extension/Continutation) of FMR along Palansa - Pinanshay b)Widening and Construction of FMR access along Palansa - Pinanshay | 450,000.00 | 20% PDF CY 2016 | Solonio Construction | Completed | |
|
Kabayan | Ballay | Improvement along Besocol FMR | 500,000.00 | 20% PDF CY 2016 | Akiki Builders | Completed | |
|
Kabayan | Ballay | Tirepathing of Upper Dumipayas | 100,000.00 | 20% PDF CY 2016 | Akiki Builders | Completed | project contract cluster "D" a)tirepathing of upper dumipayas ballay, kabayan b)const. of tirepath along kubo-tinaleb fmr ballay,kabayan both located @ ballay, kabayan, benguet |
|
Kabayan | Ballay | Construction of Tirepath along Kubo - Tinaleb FMR | 100,000.00 | 20% PDF CY 2016 | Akiki Builders | Completed | contract cluster "D" a)tirepathing of upper dumipayas ballay, kabayan b)const. of tirepath along kubo-tinaleb fmr ballay,kabayan both located @ ballay, kabayan, benguet |
|
Kabayan | Lusod | Improvement of Baay - Ballay - Lusod FMR (Proper Lusod Section) | 980,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | CLUSTERED Control No.: b) 02-16-00085 - Jamil Sean |
|
Kabayan | Ballay | Improvement along Lower Taaw FMR | 980,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | CLUSTERED Control No.: a) 02-16-00084 - Jamil Sean Construction |
|
Kabayan | Lusod | Road Opening at Lusod - Dagdag FMR | 2,300,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | Completed on March 6, 2018 |
|
Kabayan | Gusaran | Construction of Sub-Clinic | 800,000.00 | 20% PDF CY 2016 | Solonio Construction | Completed | Completed and usable with underrun and liquidated damages. |
|
Kabayan | Bashoy | Construction of Tirepath along Nandupit Junction along Dumamay FMR | 250,000.00 | 20% PDF CY 2016 | Solonio Construction | Completed | Completed and usable with underrun and liquidated damages |
|
Kabayan | Batan | Improvement of Washington - Colong - Bajen - Agpay FMR | 250,000.00 | 20% PDF CY 2016 | 4 Brothers Construction | Completed | Clustered a) imp of Batan FMR; b) imp of washington-colong-bajen-agpay FMR @ Batan, Kabayan |
|
Kabayan | Tawangan | a) Tawangan - Lusod National High School Ground Levelling with Riprap and Retaining Wall b) Riprap and Leveling of Lusod-Tawangan National High School Grounds | 1,500,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | contract a)riprapping & improvement of Lusod-Tawangan national high school grounds @ tawangan, kabayan, benguet B)riprap of lusod-tawangan national high school ground @ tawangan kabayan be |
|
Kabayan | Ballay | Improvement of Dinamili - Tinaleb FMR | 500,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | Clustered L projects - b) imp of tinaleb - naybo FMR @ Ballay, Kabayan; c) imp of tinaleb - pangawan FMR @ Ballay, kabayan |
|
Kabayan | Ballay | Improvement along Taaw - Kubo FMR | 1,000,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | |
|
Kabayan | Ballay | Improvement of Tinaleb - Naybo FMR | 500,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | |
|
Kabayan | Ballay | Improvement of Tinaleb - Pangawan FMR | 500,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | Clustered L projects - b) imp of tinaleb - naybo FMR @ Ballay, Kabayan; c) imp of tinaleb - pangawan FMR @ Ballay, kabayan |
|
Kabayan | Eddet | Construction of Eddet Elementary School Stage | 800,000.00 | 20% PDF CY 2016 | Akiki Builders | Completed | Completed on February 27, 2018 |
|
Kabayan | Bashoy | Construction of Comfort Room, Bashoy, Kabayan | 600,000.00 | 20% PDF CY 2016 | Akiki Builders | Completed | Completed on February 15, 2018 |
|
Kapangan | Sagubo | Construction of steps, Sagubo Elementary School, Kapangan, Benguet | 200,000.00 | 20% PDF CY 2016 | Balangcod Construction | Completed | |
|
Kapangan | Kapangan Central | Construction of Gym in KCNHS, Kapangan | 5,000,000.00 | 20% PDF CY 2016 | Family Circle Construction | Completed | |
|
Kapangan | Kapangan Central | Construction of Gymnasium for KNHS (additional) | 5,000,000.00 | 20% PDF CY 2016 | Family circle construction/Marcos P. Luma-ang | Completed | payment of partial accomplishment of clustered projects a)const. of a gymnasium in kapangan central national high school, central kapangan, beguet b)const. of a gymnasium for kapangan national high school.
|
|
Kibungan | Palina | Construction of Pikwila Building & Toilet, Palina | 800,000.00 | 20% PDF CY 2016 | Akip Construction and Enterprise | Completed | |
|
Kibungan | Palina | Construction of Multi-Purpose Waiting Shed at Gotong, Palina | 150,000.00 | 20% PDF CY 2016 | Akip Construction and Enterprise | Completed | |
|
La Trinidad | Wangal | Construction of Multi-Purpose Shed for Horse Back Riding Area, Children's Park | 950,000.00 | 20% PDF CY 2016 | On Top Construction | Completed | CLUSTERED b) Control No.: 02-16-00110 - On Top Construction |
|
Kibungan | Madaymen | Tirepathing of Sagangasang-Dalumpit FMR, Madaymen, Kibungan | 150,000.00 | 20% PDF 2016 | akip construction and ent/bobby wayan | Completed | clustered "D" projects with same funding source but different project on, a. tirepathing of sagangasang-dalumpit fmr madaymen kibungan benguet |
|
Kibungan | Tacadang | Improvement of Batangan Elementary School Building | 500,000.00 | 20% PDF 2016 | akip construction and enterprises/ bobby wayan | Completed | |
|
Kibungan | Lubo | Improvement of Amselwing FMR | 800,000.00 | 20% PDF 2016 | Akip Construction and Enterprise | Completed | |
|
Kibungan | Lubo | Construction of Cottage in Lubo Elementary School, Kibungan, Benguet (additional) | 1,000,000.00 | 20% PDF CY 2016 | Akip Construction and Enterprise | Completed | |
|
La Trinidad | Cruz | Continuation of Construction of Covered Canal at Sunshine Alley | 300,000.00 | 20% PDF CY 2016 | | Completed | 63.22% accomplishment with under run
Update coordinates |
|
La Trinidad | Poblacion | Concreting of Access Road to Upper Buyagan Central - Balili | 400,000.00 | 20% PDF CY 2016 | akip construction and enterprises/ bobby wayan | Completed | Input the accurate coordinates of the project |
|
La Trinidad | Betag | Improvement of EQA Laboratory at BeGH | 137,000.00 (clustered) | 20% PDF CY 2016 | ICO Construction | Completed | contract under cluster g: a) concreting of shilan-jappa brgy road, shilan, la trinidad; b) imp of eqa laboratory, begh, la trinidad |
|
La Trinidad | Lubas | Improvement of Sidewalk along Proper Lubas | 950,000.00 (clustered) | 20% PDF CY 2016 | On Top Construction | Completed | CLUSTERED a) Control No.: 02-16-001016 - On Top Construction
contract under cluster "O" projects - b)imp of sidewalk along proper lubas, L Trinidad; c)const of covered canal @ upper bayabas, pico, LTB |
|
La Trinidad | Lubas | Construction of Covered Canal at Upper Lubas | 250,000.00 (clustered) | 20% PDF CY 2016 | On Top Construction | Completed | Input the accurate coordinates
contract under cluster "O" projects - b)imp of sidewalk along proper lubas, L Trinidad; c)const of covered canal @ upper bayabas, pico, LTB |
|
La Trinidad | Ambiong | Improvement of Upper Ambiong FMR | 612,000.00 | 20% PDF CY 2016 | Summerlin Construction | Completed | Completed with under run.
|
|
La Trinidad | Wangal | Improvement of School Building at Benguet Technical School | 1,000,000.00 | 20% PDF CY 2016 | Leo Heirs Construction | Completed | |
|
La Trinidad | Pico | Road Improvement at Pinebreeze, Shamolog | 700,000.00 | 20% PDF CY 2016 | Hillbrand Engineering | Completed | 98.76% completed with under run.
Input the accurate coordinates |
|
La Trinidad | Poblacion | Improvement of Road Windy Hill, Concreting of the Road at Upper Central Buyagan | 450,000.00 | 20% PDF CY 2016 | Sangin General Construction | Completed | Concreting of the Road at Upper Central Buyagan - Project Completed on February 24, 2017 |
|
La Trinidad | Ambiong | Construction of Footbridge at Lanas Creek, Takinan | 300,000.00 | 20% PDF CY 2016 | Pulicay Grandson's Construction | Completed | Input the accurate coordinates |
|
Mankayan | Suyoc | Slope protection of Mayangyang Road, Suyoc, Mankayan | 500,000.00 | 20% PDF CY 2016 | Cabuguiasan Builders | Completed | |
|
La Trinidad | Puguis | Finishing of Waiting Lounge at CTS Puguis | 200,000.00 | 20% PDF CY 2016 | JURICMARC CONSTRUCTION | Completed | |
|
Bokod | Bila | Improvement of FMR along Gwiling-Yabo in Palansa, Bila | 100,000.00 | SB #2 CY 2016 | SRBA General Construction | Completed | |
|
Bokod | Bila | Improvement of FMR along Gwiling-Yabo in Palansa, Bila | 100,000.00 | SB #2 CY 2016 | SRBA General Construction | Completed | |
|
Sablan | Banangan | Rehabilitation of Keddeng Tramline | 1,000,000.00 | 20% PDF CY 2016 | Anas Construction | Completed | |
|
Sablan | Kamog | Concreting of Lower Tinekey FMR, Kamog, Sablan | 350,000.00 | 20% PDF 2016 | Guardian Construction | Completed | lustered "A" projects a.) concreting of lower tinekey fmr, kamog sablan, benguet b.) const of footpath and installation of hand drills at sitio botot |
|
Sablan | Bagong | Cluster "S" a.) Riprapping and Installation of Footpath Railings from Sitio Depnac - Cayapes | 350,000.00 | 20% PDF CY 2016 | Guardian Construction | Completed | CLUSTERED - b) Control No.: 02-16-00138 - Guardian Construction |
|
Sablan | Bayabas | const of footpath and installation of hand drills at sitio botot | 350,000.00 | 20% PDF 2016 | Guardian Construction | Completed | CLUSTERED - a) Control No.: 02-16-00137 - Guardian Construction
clustered "A" projects a.) concreting of lower tinekey fmr, kamog sablan, benguet b.) const of footpath and installation of hand drills at sitio botot |
|
Sablan | Balluay | Completion of Building: Sablan National High School | 700,000.00 | 20% PDF CY 2016 | Guardian Construction | Completed | Completed on February 27, 2018 |
|
Tuba | Twin Peaks | Construction of Comfort Room, Twin Peaks, Tuba | 700,000.00 | 20% Project Development Fund - 2016 | Roben Runas Construction | Completed | |
|
Tuba | Taloy Sur | Concreting of Extension of Palina Balinsuay FMR, Taloy Sur | 500,000.00 | 20% PDF CY 2016 | Roben Runas Construction | Completed | |
|
Tuba | Tadiangan | Construction of Flood control at Altaverde | 250,000.00 | 20% Project Development Fund - 2016 | anas construction/ dionisio anas | Completed | Verify Date |
|
Tuba | Camp 4 | Construction of Fire Hydrant | 1,000,000.00 | 20% PDF CY 2016 | Roben Runas Construction | Completed | |
|
Tuba | Camp 3 | Construction of Loading Platform | 250,000.00 | 20% PDF CY 2016 | roben runas construction/roben runas | Completed | For validation of amount (JC)
contract,construction of loading platform antamok camp 3 located at camp 3 tuba benguet |
|
Tuba | Tabaan Sur | Construction of Water Works System | 500,000.00 | 20% Project Development Fund - 2016 | roben runas construction/roben runas | Completed | |
|
Tuba | Camp 3 | Opening of Agpay FMR | 2,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
Tublay | Ambassador | Construction of Day Care Center Sto. Nino, Ambassador, Tublay, Benguet | 800,000.00 | 20% PDF CY 2016 | Aguinsod Construction | Completed | |
|
Kibungan | Sagpat | Improvement along Kibungan Junction - Sagpat Provincial Road | 2,000,000.00 | 20% PDF CY 2016 | | Completed | Completed on June 4, 2017 |
|
La Trinidad | Shilan | Improvement along Shilan - Sagpawe Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | Drichloui Construction | Completed | Completed on March 26, 2017 |
|
La Trinidad | Alno | Construction of PCCP along Alno - Pangablan Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | Universal De Leon Construction and Aggregates | Completed | |
|
Atok | Topdac | Improvement along Mencio Junction - Topdac Provincial Road | 1,500,000.00 | 20% PDF CY 2016 | Hillstone Builders | Completed | |
|
Atok | Cattubo | Improvement along Tulodan - Sayangan Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
Tublay | Tublay Central | Construction of PCCP along Tublay Gate - Tublay Presidencia Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | bosongan construction/jun-jun wag-e | Completed | |
|
Itogon | Poblacion | Improvement of Diversion Road from Batuang - Poblacion Carantes Road (Provincial Road) | 1,000,000.00 | 20% PDF CY 2016 | Babecor Builders | Completed | Completed on March 2, 2017 |
|
Tuba | Tadiangan | Improvement of Yagyagan - Ampusa Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | Balangcod Construction | Completed | Completed on February 10, 2017 with liquidated damages |
|
Itogon | Ucab | Improvement of Tram - Ucab Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | wdg construction and supply/winson galangco | Completed | Completed on October 27, 2017 |
|
Mankayan | Tabio | Improvement along Mankayan - Bato Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | Donato Sakiwat Construction | Completed | Completed on September 30, 2017 |
|
Tuba | Taloy Sur | Improvement of Pugo - Balangbang Vehicular Bridge | 1,500,000.00 | 20% PDF CY 2016 | Roben Runas Construction | Completed | Completed on February 15, 2018 |
|
Mankayan | Balili | Improvement along Atayan, Balili Provincial Road | 800,000.00 | 20% PDF CY 2016 | ZMC General Construction | Completed | Completed August 15, 2018 |
|
Kibungan | Sagpat | Improvement along Sagpat - Sapdaan Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | Drichloui Construction | Completed | Completed on August 25, 2017 |
|
Tuba | Twinpeaks | Construction of PCCP along Camp 1 - Indaoac -Twin Peaks Provincial Road | 5,000,000.00 | 20% PDF CY 2016 | | Completed | with Liquidated Damages |
|
Tublay | Daclan | Construction of PCCP along Bangho - Asin Provincial Road | 2,000,000.00 | 20% PDF CY 2016 | hillstone builders/ hudson depolio | Completed | 99.50% completed due to under run and also with liquidated damages. |
|
Sablan | Poblacion | Improvement along Sablan - Sablan Old Presidencia Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
La Trinidad | Wangal | Improvement along Wangal - Banengbeng Provincial Road | 3,500,000.00 | 20% PDF CY 2016 | Cliff Construction and Aggregates, Junifer Bosleng | Completed | with Liquidated Damages |
|
Bakun | Dalipey | Improvement along Sipitan - Palidan Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
La Trinidad | Beckel | Improvement along Beckel - Balangbang Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | Sej General Construction and Aggregates, Eric De L | Completed | |
|
Bokod | Daclan | Improvement along Daclan - Bonagan - Tickey - Camanggaan Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | Almond Engineering and Construction | Completed | with Liquidated Damages |
|
La Trinidad | Bahong | Improvement along Camp Dangwa - Bahong - Sadag Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | EaJr De Leon Construction, Edwardo De Leon Jr | Completed | |
|
Kapangan | Labueg | Improvement of Datakan - Alapang - Camp 66 Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | Bolds Engineering and Construction | Completed | 99.75% completed due to under run |
|
Sablan | Kamog | Improvement of PCCP along Calot - Kamog - Pappa Provincial Road | 1,000,000.00 | 20% PDF CY 2016 | Anas Construction | Completed | |
|
Atok | Topdac | Construction of Topdac Elementary School Cottage | 500,000.00 | 20% PDF CY 2016 | Hillstone Builders | Completed | |
|
Bokod | Nawal | Improvement of Danas Footbridge | 586,000.00 | 20% PDF CY 2016 | | Completed | Completed on July 25, 2016 |
|
Buguias | Catlubong | Improvement of Ponopon-Lusab FMR | 500,000.00 | 20% PDF CY 2016 | SEJ Construction and Aggregates | Completed | |
|
Buguias | Catlubong | Improvement of Wallayan-Abbatan FMR | 1,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Amgaleyguey | Improvement of Polis Kiok Road | 100,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Baculongan Sur | Improvement of Bad-ayan E/S Ground | 200,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Natubleng | Construction of Concrete Footpath, Lamut | 100,000.00 | 20% PDF CY 2016 | | Completed | |
|
Kabayan | Ballay | Improvement of Liang FMR, Ballay | 500,000.00 | 20% PDF CY 2016 | | Completed | Completed on July 18, 2016 |
|
Kabayan | Ballay | Improvement along Tamangan FMR, Ballay | 500,000.00 | 20% PDF CY 2016 | | Completed | Completed on July 12, 2016 |
|
Kapangan | Kapangan Central | Improvement of Basketball Court at Kapangan Central School | 350,000.00 | 20% PDF CY 2016 | | Completed | Completed on July 18, 2016 |
|
La Trinidad | Puguis | Improvement of Buhaw Road | 800,000.00 | 20% PDF CY 2016 | Sej General Construction and Aggregates/ Eric De L | Completed | |
|
Mankayan | Bulalacao | Improvement of Lower Inga-an - Damoslog FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | Completed on June 30, 2016 |
|
Mankayan | Bulalacao | Construction of Concrete Pavement, Lower Inga-an - Damoslof FMR | 150,000.00 | 20% PDF CY 2016 | | Completed | Completed on July 26, 2016 |
|
Mankayan | Bulalacao | Improvement of Cotcot - Napitkey FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | Completed on July 26, 2016 |
|
Itogon | Tuding | Construction of Vehicular Bridge, Mangga-Luneta | 3,000,000.00 | 20% PDF CY 2016 | Ico Construction Services/ Jerico A. Palangdan | Completed | |
|
Atok | Topdac | Improvement of Nalseb-Topdac FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | Completed on September 22, 2016 |
|
Bakun | Dalipey | Riprapping of Sipitan Health Clinic Ground | 200,000.00 | 20% PDF CY 2016 | Apaklo Kin Construction | Completed | Completed on September 29,2016 |
|
Bokod | Ekip | Improvement of Whetig-Sacba Foot Trail | 300,000.00 | 20% PDF CY 2016 | | Completed | Completed on September 5, 2016
|
|
Buguias | Amgaleyguey | Amgaleyguey FMR | 1,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Abatan | Improvement of Bauknit FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Baculongan Sur | Improvement of Balintag - Aligan FMR | 1,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Sebang | Improvement of Paneg-an FMR | 1,500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Baculongan Norte | Improvement of Lagan - Naduguan FMR | 1,000,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Loo | Improvement along Loo-Modayan-Kitongan FMR | 800,000.00 | 20% PDF CY 2016 | | Completed | |
|
Itogon | Tinongdan | Construction of Bleachers at Tinong's Gym | 1,000,000.00 | 20% PDF CY 2016 | WDG Construction and Supply/Winson D. Galangco | Completed | |
|
Itogon | Loacan | Road Improvement along Beda FMR | 1,000,000.00 | 20% PDF CY 2016 | WDG Construction and Supply/Winson D. Galangco | Completed | |
|
Kabayan | Tawangan | Improvement of Proper Nakilo FMR, Tawangan | 1,000,000.00 | 20% PDF CY 2016 | | Completed | Completed on September 9, 2016 |
|
Kabayan | Anchukey | Improvement of Upper Agat Rice Field Access | 200,000.00 | 20% PDF CY 2016 | 4 Brothers Construction | Completed | Cluster "A" - 4 Brothers Construction |
|
Kabayan | Anchukey | Construction of Tirepath along Anchukey, Baok | 150,000.00 | 20% PDF CY 2016 | 4 Brothers Construction | Completed | Cluster "A" - 4 Brothers Construction |
|
La Trinidad | Bahong | Construction of Flood Control at Tomay Creek | 1,000,000.00 | 20% PDF CY 2016 | Illstone Builders, Hudson Depolio | Completed | Completed on September 19, 2016 |
|
La Trinidad | Shilan | Improvement of Road in Balukas, Shilan | 1,000,000.00 | 20% PDF CY 2016 | Sej Construction & Aggregates, Mr. Eric De Leon | Completed | Completed on September 26, 2016 |
|
La Trinidad | Balili | Improvement of Footpath with Steel Railings, Tebteb | 100,000.00 | 20% PDF CY 2016 | Almond Engineering and Construction | Completed | Completed on September 15, 2016 |
|
La Trinidad | Balili | Construction of Footpath at Botiwtiw, Balili | 100,000.00 | 20% PDF CY 2016 | Almond Engineering and Construction | Completed | Completed on September 22, 2016
payment of contract clustered a)const. foothpath in Botiwtiw, Balili, La Trinidad b)const. of foothpath, Tabangaoen, Balili, La Trinidad |
|
La Trinidad | Balili | Construction of Footpath at Tabangaoen, Balili | 200,000.00 | 20% PDF CY 2016 | Almond Engineering and Construction/ Rogelio L. Al | Completed | Completed on September 16, 2016
contract due on const. footpath and concrete cover of drainage canal at tabangaoen, balili balili la trinidad |
|
Tuba | Ansagan | Improvement of Bes-ig FMR, Camp 1 | 1,000,000.00 | 20% PDF CY 2016 | | Completed | Completed on September 4, 2016 |
|
Tuba | Tadiangan | Improvement of Obbog Footpath | 150,000.00 | 20% PDF CY 2016 | | Completed | Completed on September 10, 2016 |
|
Tublay | Caponga | Improvement of Kapungan Footbridge | 150,000.00 | 20% PDF CY 2016 | Hillstone Builders | Completed | Completed on September 22, 2016 |
|
Bokod | Daclan | Improvement of Landing FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | Completed on August 15, 2016 |
|
Buguias | Baculongan Sur | Improvement of Nangodey - Baney FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Buyacaoan | Improvement of Tablaan - Godogodan FMR at Bekes | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Buyacaoan | Improvement of Bayoyo FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Abatan | Improvement of Galudan FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Itogon | Tuding | Improvement of Abeo - Duclos Road, Tuding | 500,000.00 | 20% PDF CY 2016 | Bemada Construction/ Benny M. Daliling | Completed | |
|
Kabayan | Eddet | Improvement of Nanchupit FMR, Eddet | 1,000,000.00 | 20% PDF CY 2016 | | Completed | Completed on August 31, 2016 |
|
Kabayan | Tawangan | Improvement of Proper Nambangawan FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | Completed on August 11, 2016 |
|
Kapangan | Gadang | Construction of BeMONC Building, Gadang | 250,000.00 | 20% PDF CY 2016 | | Completed | Completed on August 2, 2016 |
|
Kapangan | Pudong | Improvement of Ambalading Footbridge, Toplac | 300,000.00 | 20% PDF CY 2016 | | Completed | Completed on August 19,2016 |
|
La Trinidad | Shilan | Improvement of Road at Besil-Safid | 700,000.00 | 20% PDF CY 2016 | Babecor Builders/ Marcos P. Bacoy | Completed | Completed on August 8, 2016 |
|
Mankayan | Cabiten | Concreting of Pathway at Baed | 300,000.00 | 20% PDF CY 2016 | | Completed | Completed on August 5, 2016 |
|
Mankayan | Balili | Improvement of Solsolatan - Dagadag FMR | 400,000.00 | 20% PDF CY 2016 | | Completed | Completed on August 4, 2016 |
|
Mankayan | Bulalacao | Improvement of Daycog - Demang FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | Completed on August 13, 2016 |
|
Sablan | Pappa | Improvement of Balingew - Taya FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Tuba | Tabaan Norte | Improvement of Parasipis - Marconil FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | Completed on August 4, 2016 |
|
Tuba | Taloy Sur | Improvement of Tawalan - Andil FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | Completed on August 1, 2016 |
|
Bokod | Ekip | Improvement of Ekip - Naswak Footpath | 800,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Baculongan Sur | Improvement of Sinto - Lamagan FMR | 500,000.00 | 20% PDF CY 2016 | JYP Construction | Completed | Cluster "A" - JYP Construction a) Control No. 02-16-00243 b) Control No. 02-16-00234 |
|
Kapangan | Kapangan Central | Improvement of Padang, Central Foot trail | 150,000.00 | 20% PDF CY 2016 | Balangcod Construction | Completed | Completed on November 22, 2016 |
|
Kibungan | Madaymen | Improvement of Pakpakitan Elementary School | 600,000.00 | 20% PDF CY 2016 | Bosongan Construction | Completed | Completed on November 18, 2016 |
|
La Trinidad | Bineng | Improvement/Expansion of Bineng Waterworks System | 1,000,000.00 | 20% PDF CY 2016 | JCA General Construction and Engineering Services | Completed | |
|
La Trinidad | Wangal | Construction of Perimeter Fence at Wangal Nursery | 250,000.00 | General Fund - All Offices CY 2016 | Anas Construction | Completed | |
|
La Trinidad | Puguis | Construction of Drainage Canal at DSWD-Veterans Building | 500,000.00 | 20% PDF CY 2016 | Drichloui Construction | Completed | |
|
Sablan | Poblacion | Improvement of Tinekey Waterworks System, Lower Poblacion | 500,000.00 | 20% PDF CY 2016 | HGW=3 Engineering & Construction | Completed | |
|
Buguias | Bangao | Construction of Labayan Vehicular Bridge | 2,000,000.00 | 20% PDF CY 2016 | | Completed | with liquidated damages |
|
Buguias | Sebang | Improvement of Guipadan - Pasbol FMR | 500,000.00 | 20% PDF CY 2016 | | Completed | |
|
Buguias | Sebang | Improvement of Pasbol - Ibisan FMR | 100,000.00 | 20% PDF CY 2016 | JYP Construction | Completed | Cluster "A" - JYP Construction |
|
Itogon | Tuding | Improvement of Bua-Cemetery Road | 500,000.00 | 20% PDF CY 2016 | Gacoscos Construction | Completed | |
|
Kabayan | Anchukey | Construction of Tirepath along Anchokey FMR | 100,000.00 | 20% PDF CY 2016 | 4 Brothers Construction | Completed | Cluster "A" - 4 Brothers Construction |
|
Kabayan | Anchokey | Construction of Tirepath along Anchokey FMR, Baok | 150,000.00 | 20% PDF CY 2016 | | Completed | Completed on September 28, 2016 |
|
Kabayan | Ballay | Construction of Riprap along Tuidan FMR | 250,000.00 | 20% PDF CY 2016 | Jamil Sean Construction | Completed | Completed on October 4, 2016 |
|
Kabayan | Pacso | Improvement of Sitio Champeg Waterworks System | 200,000.00 | 20% PDF CY 2016 | Solonio Construction | Completed | Completed on October 18, 2016 |
|
Kapangan | Datakan | Construction of Foot Bridge at Dassip - Panakbakan - Pongayan | 500,000.00 | 20% PDF CY 2016 | | Completed | Completed on October 3, 2016 |
|
La Trinidad | Shilan | Improvement of Roads in Jappa - Shilan | 700,000.00 | 20% PDF CY 2016 | Hillstone Builders, Hudson Depolio | Completed | Completed on October 13, 2016 |
|
La Trinidad | Alno | Construction of Concrete Fence at the Southwest Portion of the BeNHS Alno Annex | 150,000.00 | 20% PDF CY 2016 | Hillstone Builders | Completed | Completed on October 7, 2016 |
|
Tuba | Camp 4 | Construction of Flood Control, Goldstream, Camp 1 | 500,000.00 | 20% PDF CY 2016 | Roben Runas Construction | Completed | Completed on October 25, 2016 |
|
La Trinidad | Balili | Construction of Drainage Canal at Central Balili | 500,000.00 | 20% PDF CY 2016 | Almond Engineering and Construction | Completed | Completed on October 30, 2016 |
|
Tuba | Camp 1 | Concreting along Gusaran Pathway, Camp 1 | 150,000.00 | 20% PDF CY 2016 | Roben Runas Construction | Completed | Completed on October 16 , 2016 |
|
Tuba | Tabaan Norte | Installation of Box Culvert at Tabaan Norte | 150,000.00 | 20% PDF CY 2016 | Roben Runas Construction | Completed | Completed on October 15, 2016 |
|
Mankayan | Cabiten | Construction of Lubban Waiting Shed, Camanpaguey, Cabiten | 100,000.00 | 20% PDF CY 2016 | Baldas Construction | Completed | Completed on February 21, 2018 |
|
Buguias | Amlimay | Construction of Barangay Multi-Purpose Hall Comfort Room | 500,000.00 | 20% PDF CY 2016 | JuricMarc Construction | Completed | |
|
Kabayan | Tawangan | Completion of Tawangan Multi-Purpose Building/Hall | 100,000.00 | 20% PDF CY 2016 | Haight's Construction | Completed | |
|
Atok | Paoay | Cluster A: a) Tiling of Wall of the Operating Room / Delivery Room of Atok District Hospital | 544,000.00 | 20% PDF CY 2016 | Haight's Construction | Completed | Cluster "A"
b) Improvement of Emergency Room and Shade at Atok District Hospital
c) Improvement / Extension of Stockroom at Atok District Hospital
d) Replacement of Roofing Garage and Ramp Located at Atok District Hospital |
|
Atok | Paoay | Cluster A: b) Improvement of Emergency Room and Shade at Atok District Hospital | 544,000.00 | 20% PDF CY 2016 | Haight's Construction | Completed | Cluster "A"
a) Tiling of Wall of the Operating Room / Delivery Room of Atok District Hospital
c) Improvement / Extension of Stockroom at Atok District Hospital
d) Replacement of Roofing Garage and Ramp Located at Atok District Hospital |
|
Atok | Paoay | Cluster A: c) Replacement of Roofing Garage and Ramp Located at Atok District Hospital | 544,000.00 | 20% PDF CY 2016 | Haight's Construction | Completed | Cluster "A"
a) Tiling of Wall of the Operating Room / Delivery Room of Atok District Hospital
b) Improvement of Emergency Room and Shade at Atok District Hospital
d) Improvement / Extension of Stockroom at Atok District Hospital |
|
Atok | Paoay | Improvement / Extension of Stockroom at Atok District Hospital | 544,000.00 | 20% PDF CY 2016 | | Completed | Cluster "A"
a) Tiling of Wall of the Operating Room / Delivery Room of Atok District Hospital
b) Improvement of Emergency Room and Shade at Atok District Hospital
c) Replacement of Roofing Garage and Ramp Located at Atok District Hospital |
|
La Trinidad | Beckel | Construction of Centralized Drainage Canal at Beckel | 200,000.00 | 20% PDF CY 2016 | ICO Construction | Completed | 100% Completed as of April 3, 2018 with 199,474.44 Total Cost Incurred. |
|
Bakun | Dalipey | Concreting of Masalin Footpath, Dalipey, Bakun | 100,000.00 | 20% PDF CY 2016 | NAIR Construction & Engineering | Completed | Completed on February 19, 2018 |
|
Bakun | Dalipey | Construction of Catwalk Shed, Talbino Elementary School, Dalipey Bakun Benguet | 150,000.00 | 20% PDF CY 2016 | NAIR Construction & Engineering | Completed | Completed on February 15, 2018 |
|
Buguias | Baculongan Norte | Construction of Pugo Day Care Center Baculongan Norte | 1,200,000.00 | 20% PDF CY 2016 | HGW=3 Engineering & Construction | Completed | 1) 2 suspensions
2) 100% Completed
3) Revised target date completion - October 19, 2018 |
|
Kapangan | Balakbak | Construction of Senior Citizen Building at Balakbak, Kapangan | 1,500,000.00 | 20% PDF CY 2016 | Balangcod Construction | Completed | 1) This project was previously suspended due to RROW Clearance from the DPWH (Date of Resume: 11/20/2017)
2) Completed with liquidated damage |
|
Bokod | Poblacion | Cluster | 400,000.00 | 20% PDF CY 2016 | Hillbrand Engineering | Completed | Cluster "C" b) Control No. 02-16-00269 c) Control No. 02-16-00041 d)
Hillbrand Engineering |
|
Bokod | Ambuklao | Cluster | 400,000.00 | 20% PDF CY 2016 | Hillbrand Engineering | Completed | Cluster "C" a) Control No. 2-16-00268 c) Control No. 02-16-00041 d)
Hillbrand Engineering |
|
Buguias | Lengaoan | Improvement of Pilando - Igang Footpath | 150,000.00 | 20% PDF CY 2016 | | Completed | Completed with LD |
|
Itogon | Dalupirip | Improvement of Togi - Ayosip FMR | 1,000,000.00 | 20% PDF CY 2016 | babecor builders/ marcos bakoy | Completed | Completed and usable |
|
Mankayan | Cabiten | Construction of Multi-Purpose Building (Phase I) located at Gueweng Cabiten | 400,000.00 | 20% PDF CY 2016 | | Completed | Completed on March 24, 2018 |
|
Sablan | Banangan | Construction of Pasalubong Tourist Information Center, Viewdeck Banangan | 500,000.00 | 20% PDF CY 2016 | Anas Construction | Completed | 100% Completed - Total Cost Incurred PhP 469,972.82 as of April 30, 2018 |
|
Tuba | Tadiangan | Construction of Sinco Footpath, Sayapan | 100,000.00 | 20% PDF CY 2016 | Anas Construction | Completed | Completed on February 23, 2018 |
|
Tuba | Taloy Sur | Construction of Quarantine Checkpoint along Marcos Highway, Tuba Benguet | 400,000.00 | 20% PDF CY 2016 | Anas Construction | Completed | |
|
Tuba | Nangalisan | Improvement of Nangalisan E/S Ground, Nangalisan Tuba Benguet | 300,000.00 | 20% PDF CY 2016 | Roben Runas Construction | Completed | Completed on March 19, 2018 |
|
Kabayan | Ballay | Improvement of Minac-Batuan FMR, Ballay, Kabayan | 800,000.00 | 20% PDF CY 2016 | Solonio Construction | Completed | |
|
Mankayan | Balili | Construction of Farmers Bodega, Mankengaw, Balili, Mankayan | 250,000.00 | 20% PDF CY 2016 | Juricmarc Construction | Completed | Completed on May 5, 2018, with 224,915.99 total cost incurred |
|
Mankayan | Cabiten | Concreting of Siksiko Road, Cabiten, Mankayan | 600,000.00 | 20% PDF CY 2016 | Sharamelle Construction and General Engineering | Completed | |
|
Buguias | Buyacaoan | Improvement of Northern Benguet District Hospital Kitchen, Bekes, Buyacaoan, Buguias, Benguet | 300,000.00 | 20% PDF - 2016 | AIP Construction | Completed | |
|
Tuba | Tabaan Sur | Construction of Multi-Purpose Hall, Tabaan Sur, Completion | 500,000.00 | 20% PDF 2016 | Sapdoy Enterprises | Completed | Completed and usable. |
|
Sablan | Banangan | Construction of Banangan Footpath,Ambacuag | 200,000.00 | 20% PDF-2016 | Anas Consruction | Completed | |
|
La Trinidad | for verification | Improvement of School fence and Entrance Gate and Ground Improvement | 600,000.00 | 20% PDF-2016 | Drichloui Construction | Completed | |
|
Kibungan | Tacadang | Construction of Footbridge - Bileng 1 in Tacadang, Kibungan | 350,000.00 | 20% PDF - 2016 | Akip Construction & Enterprise | Completed | |
|
Kabayan | Tawangan | Completion of Multi-Purpose Building (Phase II), Tawangan, Kabayan | 500,000.00 | 20% PDF 2016 | Akiki Builders | Completed | |
|
Atok | Pasdong | Completion of Banayakew Multi-Purpose Building with Watertank & Ground Improvement at Pasdong, Atok, Benguet | 800,000.00 | 20% PDF 2016 | Four Brothers Construction | Completed | Ongoing with LD; Revised target date= 06/16/2019.
1 suspension |
|
Kabayan | Ballay | Improvement of Basketball Court in Besocol, Ballay | 300,000.00 | 20% PDF 2016 | Four Brothers Construction | Completed | |
|
Sablan | Bagong | Concreting of Barangay Clinic Grounds, Depnac, Bagong, Sablan | 150,000.00 | 20% PDF 2016 | Guardian | Completed | |
|
Kabayan | Pacso | Construction of Barangay Multi-Purpose Building/Hall Comfort Room | 500,000.00 | 20% PDF 2016 | Akiki Builders | Terminated | 1 suspension.
Suspended on December 10, 2018 due to site problem |
|
Tublay | Ambongdolan | Construction of Teachers Cottage, Langbis Primary School, Ambongdolan, Tublay, Benguet | 800,000.00 | 20% PDF 2016 | Sandstream Construction | Terminated | For Termination |
|
Itogon | Tinongdan | Improvement/Phase III Of X-Ray Completion Of Multi-Purpose Laboratory Complex | 500,000.00 | 20% PDF - 2016 | Reko General Construction | Completed | |
|
Tuba | Taloy Sur | Re-opening and Improvement along Begis-Poyopoy Provincial Road | 2,000,000.00 | 20% PDF 2016 | Boyet Builders | Temporarily suspended | Suspended; Waiting for ECC to be issued by DENR |
|
Atok | Poblacion | Improvement of Banayakeo-Poblacion Barangay Road | 500,000.00 | 20% PDF CY 2017 | | Completed | |
|
Atok | Abiang | Improvement of Guiweng-Boy-otan Barangay Road | 500,000.00 | 20% PDF CY 2017 | | Completed | Completed on December 11, 2017 |
|
Bakun | Kayapa | Improvement of Kayapa FMR | 500,000.00 | 20% PDF CY 2017 | SRBA General Construction / Ray Angluben | Completed | Completed as per plan. |
|
Bakun | Poblacion | Construction of Catwalk Shed from Bakun National High School to Bakun Central School | 500,000.00 | 20% PDF CY 2017 | Pulicay Grandsons Construction | Completed | Completed as per plan with liquidated damages. |
|
Bakun | Gambang | Improvement of Alam-am Nasayotean FMR | 500,000.00 | 20% PDF CY 2017 | NAIR Construction & Engineering | Completed | 1) Cluster "D" -
2) Completed on January 24, 2018
|
|
Tuba | Twin Peaks | Improvement / Construction of PCCP along Camp 1 - Indaoac - Twin Peaks Provincial Road | 5,000,000.00 | 20% PDF CY 2017 | Roben Runas Construction | Completed | Completed on October 30, 2017 |
|
Bokod | Nawal | Fencing of Critical Section of Ambagat Foot Trail, Nawal, Bokod | 200,000.00 | 20% PDF CY 2017 | AG Chungalan Construction | Completed | |
|
Buguias | Poblacion | Improvement of Bolo - Tocdo FMR | 500,000.00 | 20% PDF CY 2017 | ICO Construction | Completed | Completed on December 4, 2017 |
|
Buguias | Bangao | Improvement of Cotcot - Labayan FMR | 500,000.00 | 20% PDF CY 2017 | On Top Construction | Completed | Completed on December 2, 2017 |
|
Buguias | Loo | Rehabilitation of JNR Modayan - Kitongan FMR | 500,000.00 | 20% PDF CY 2017 | HGW=3 Engineering & Construction | Completed | Completed on November 22, 2017 with under run |
|
Buguias | Buyacaoan | Construction of Flood Control at Gusadan (a,b,c,d) | 2,400,000.00 | 20% PDF CY 2017 | Kalahan General Construction and Supply | Completed | Completed on December 10, 2017 |
|
Buguias | Lengaoan | Improvement of Beling - Paingan FMR | 500,000.00 | 20% PDF CY 2017 | | Completed | Completed on December 15, 2017 |
|
Buguias | Baculongan Sur | Improvement along Bad-ayan - Cayapas Road at Lamangan Section | 500,000.00 | 20% PDF CY 2017 | | Completed | Completed on November 27, 2017 |
|
Buguias | Natubleng | Construction of Lamut Flood Control | 500,000.00 | 20% PDF CY 2017 | | Completed | Completed on December 26, 2017 |
|
Kapangan | Balakbak | Concreting of Open Canal Along National Road-Sitio Buyot, Balakbak, Kapangan, Benguet | 300,000.00 | 20% PDF - 2017 | Akip Construction and Enterprise | Completed | Completed: 07/19/2018 with LD
Revised Target Date of Completion: 06/21/2018 |
|
Kabayan | Duacan | Improvement of Bekes - Balangbang FMR | 500,000.00 | 20% PDF CY 2017 | Akiki Builders | Completed | |
|
Kabayan | Tawangan | Improvement of Nadaklan - Pangaya FMR | 500,000.00 | 20% PDF CY 2017 | Jamil Sean Construction | Completed | |
|
Kabayan | Gusaran | Concreting of Adereg - Aponan Footpath | 200,000.00 | 20% PDF CY 2017 | Jamil Sean Construction | Completed | |
|
Kabayan | Kabayan Barrio | Construction of Cauliflower Drying Shed, Balaban | 500,000.00 | 20% PDF CY 2017 | Solonio Construction | Completed | Completed on March 20, 2018 with liquidated damages |
|
Itogon | Loakan | Construction of waiting shed at Dampingan, frontage of Lipma Office | 150,000.00 | 20% PDF CY 2017 | Aljune Builders | Completed | |
|
Itogon | Loakan | Construction of waiting shed at Sabkil (in front of UCCP) | 150,000.00 | 20% PDF CY 2017 | Aljune Builders | Completed | |
|
Kapangan | Pongayan | Concreting of Footpath, Sagapa-Gaswiling, Pongayan, Kapangan | 250,000.00 | 20% PDF CY 2017 | | Completed | |
|
Itogon | Ampucao | Improvement of Pasiday-Tocod FMR Ampucao | 500,000.00 | 20% PDF CY 2017 | Aljune Builders / alma domagto | Completed | Completed on January 19, 2018
contract under cluster c: a) imp of pasiday-tocod fmr, ampucao, itogon; b) concreting of road portion and canal along upper mangga road, tuding, itogon |
|
Itogon | Tuding | Construction of Road Portion and Canal along Upper Mangga Road | 300,000.00 | 20% PDF CY 2017 | Aljune Builders / alma domagto | Completed | Completed on January 6, 2018
contract under cluster c: a) imp of pasiday-tocod fmr, ampucao, itogon; b) concreting of road portion and canal along upper mangga road, tuding, itogon |
|
Kapangan | Balakbak | Improvement of Balok Barangay Road, Datakan, Kapangan | 1,500,000.00 | 20% PDF CY 2017 | vanket engineering & construction / frankie diano | Completed | Needs additional fund so that the road can reach the nearby barangay |
|
Kapangan | Gadang | Concreting of Sitio Namon-ao, Gadang Foot trail | 500,000.00 | 20% PDF CY 2017 | | Completed | Revised target date completion on November 22, 2017 due to suspension/change order. |
|
La Trinidad | Puguis | Improvement of Buhao Road in Puguis, La Trinidad, Benguet | 500,000.00 | 20% PDF CY 2017 | SEJ Construction and Aggregates | Completed | 10% completed as of April 15, 2018 with 43,509.54 total cost incurred. (-) 3.95% slippage. Completed as of June 1, 2018 |
|
Kapangan | Pongayan | Concreting of footpath, Gaswiling, Pongayan | 500,000.00 | 20% PDF - 2017 | Ebtitiwa General Engineering & Construction Servic | Completed | Clustered "G" projects - b) concreting of footpath, sagapa-gaswiling, pongayan, kapangan, benguet |
|
La Trinidad | Puguis | Improvement of Buhaw Road in Puguis, La Trinidad, Benguet | 500,000.00 | 20% PDF CY 2017 | SEJ Construction and Aggregate | Completed | Completed on June 10, 2018 with liquidated damages |
|
Kapangan | Pudong | Construction along Sacdoan FT (Toplac), Pudong, Kapangan, Benguet | 200,000.00 | 20% PDF CY 2017 | guardian copnstruction/ruben pacheco jr. | Completed | Completed on January 16, 2018 |
|
Kibungan | Palina | Perimeter Fencing of Palina Brgy. Health Station and Multi-Purpose Brgy. Hall, Palina, Kibungan, Benguet | 500,000.00 | 20% PDF CY 2017 | Lincee General Construction | Completed | |
|
La Trinidad | Wangal | Fencing of School Perimeter with Ground Improvement at Benguet Technical School | 800,000.00 | 20% PDF CY 2017 | Drichloui Construction | Completed | Completed on February 5, 2018. |
|
La Trinidad | Shilan | Concreting of Shilan - Jappa Barangay Road | 500,000.00 | 20% PDF CY 2017 | | Completed | Completed on January 14, 2018 |
|
La Trinidad | Poblacion | Improvement of Drainage Canal at Upper Central Buyagan | 500,000.00 | 20% PDF CY 2017 | ICO Construction | Completed | Completed on January 12, 2018 with liquidated damages. |
|
La Trinidad | Betag | Construction of Septic Tank Drainage at BeGH | 1,000,000.00 | 20% PDF CY 2017 | RNAA Builders | Completed | |
|
La Trinidad | Ambiong | Construction of Drainage Canal at Ambiong E/S to Central Ambiong | | 20% PDF CY 2017 | JuricMarc Construction | Completed | |
|
Kapangan | Taba-ao | Construction of Concrete Footpath at Ubod, Taba-ao, Kapangan | 250,000.00 | 20% PDF 2017 | Random Builders | Completed | Completed 07/17/2018 |
|
Mankayan | Bulalacao | Improvement of Cotcot-Ambingan Bulalacao Barangay Road | 500,000.00 | 20% PDF CY 2017 | | Completed | Need additional fund |
|
Mankayan | Tabio | Construction of Road Protection Wall and Riprapping with Canal along Patpat Barangay Road, Tabio, Mankayan | 500,000.00 | 20% PDF CY 2017 | Sharamelle Construction and General Engineering | Completed | Completed on February 12, 2018 |
|
Mankayan | Guinaoang | Improvement of Guinaoang Multi-Purpose Hall, Guinaoang, Mankayan | 500,000.00 | 20% PDF CY 2017 | Malco Construction | Completed | Completed on March 7, 2018 |
|
Mankayan | Cabiten | Improvement of Maduto-Baguyos Barangay Road Cabiten, Mankayan | 500,000.00 | 20% PDF CY 2017 | Malco Construction | Completed | Completed on January 4, 2018 |
|
Mankayan | Bedbed | Improvement of Daguay-Payeo, Bedbed Barangay Road, Bedbed, Mankayan | 500,000.00 | 20% PDF CY 2017 | | Completed | Completed on February 18, 2018 |
|
Mankayan | Poblacion | Improvement of Rural Health Unit (RHU) Building, Poblacion, Mankayan | 500,000.00 | 20% PDF CY 2017 | | Completed | Completed on January 22, 2018 |
|
Sablan | Banengbeng | Improvement of Japos-Botot FMR | 500,000.00 | 20% PDF CY 2017 | Anas Construction | Completed | |
|
Sablan | Kamog | Improvement of Doddo-Kamog FMR | 500,000.00 | 20% PDF CY 2017 | Anas Construction | Completed | Completed on January 18, 2018 |
|
Sablan | Bayabas | Perimeter Fencing at Agri-Eco Farm (by phase) | 1,000,000.00 | 20% PDF CY 2017 | Aguinsod Construction | Completed | Resumed on August 3, 2018 with a revised target completion date of August 10, 2018 |
|
Tuba | San Pascual | Improvement of San Pascual - Bokyagan-Talnag Road, San Pascual, Tuba | 500,000.00 | 20% PDF CY 2017 | | Completed | |
|
Tuba | San Pascual | Construction of Sheep and Goat Sheds, San Pascual, Tuba | 500,000.00 | 20% PDF CY 2017 | Roben Runas Construction | Completed | |
|
Tuba | Tabaan Norte | Road Improvement along Binungbong - Toybongan FMR | 500,000.00 | 20% PDF CY 2017 | | Completed | Completed and usable. |
|
Tuba | Nangalisan | Improvement of Lasilas Footpath, Nangalisan, Tuba | 200,000.00 | 20% PDF CY 2017 | Roben Runas Construction | Completed | |
|
Tuba | Tadiangan | Improvement of Sipitan-Tadiangan FMR, Tadiangan Tuba Provincial Road (Concreting) | 500,000.00 | 20% PDF CY 2017 | Roben Runas Construction | Completed | |
|
Tuba | Camp 4 | Concreting of Liwliw Barangay Road | 500,000.00 | 20% PDF CY 2017 | Quieges Builders and Enterprise | Completed | |
|
Tublay | Baayan | Improvement of Baayan, Tacarang, Sitio Section, Baayan, Tublay | 500,000.00 | 20% PDF CY 2017 | Roben Runas Construction | Completed | contract under cluster e: a) imp of baayan brgy rd, tacarang, sitio section, baayan, tublay; b) const of ripra/slope protection at moran e/s, tuel, tublay
Completed on February 12, 2018. The project was previously suspended due to road sinking along Sayatan - Tacarang Road an on going project of the Municipality of Tublay. Resume on January 6, 2018 |
|
Tublay | Tuel | Construction of Riprap/Slope Protection at Moran Elementary School, Tuel, Tublay, Benguet | 500,000.00 | 20% PDF CY 2017 | Roben Runas Construction | Completed | Completed on February 12, 2018, the project was previously suspended due to the on going project by the DPWH-CAR at the area. Resumed on January 6, 2018 |
|
Tublay | Basil | Construction of Riprap, Barangay Multi-Purpose Hall, Basil, Tublay, Benguet | 500,000.00 | 20% PDF CY 2017 | Sangin Construction | Completed | |
|
Tublay | Ambassador | Improvement of Gongel-Belong Barangay Road, Ambassador, Tublay | 500,000.00 | 20% PDF CY 2017 | Sangin Construction | Completed | |
|
Tublay | Tublay Central | Construction of shed along the Footpath going to Tublay Elementary School and TSHI, Tublay Central | 250,000.00 | 20% PDF CY 2017 | | Completed | Completed as programmed and usable |
|
Tublay | Ambongdolan | Improvement of Betwag-Pachel FMR, Ambongdolan, Tublay | 500,000.00 | 20% PDF CY 2017 | roben runas construction/roben runas | Completed | cluster s: a) imp of betwag-pachel fmr, ambongdolan, tublay |
|
Tublay | Ambassador | Construction of Footpath at Los-ok Diktewan, Ambassador, Tublay, Benguet | 200,000.00 | 20% PDF CY 2017 | roben runas construction/roben runas | Completed | clustered projects: b) const of shed along footpath going to tublay e/s and c) tshi, const of footpath at los-ok-dictewan, ambassador, tublay |
|
Mankayan | Bedbed | Improvement / Construction of PCCP along Mankayan - Bedbed Provincial Road | 5,000,000.00 | 20% PDF CY 2017 | Donato Sakiwat Construction | Completed | Completed on December 24, 2017 |
|
Tuba | Taloy Sur | Improvement / Construction of PCCP along Begis - Poyopoy Provincial Road | 5,000,000.00 | 20% PDF CY 2017 | HDG Construction and Enterprise | Completed | Completed on December 16, 2017 |
|
Kabayan | Gusaran | Improvement / Construction of PCCP along National Road Junction - Diboong - Bangao Provincial Road | 5,000,000.00 | 20% PDF CY 2017 | Kuatako Construction and General Construction | Completed | Completed on September 17, 2017 with PCCP deficiency |
|
Bokod | Daclan | Improvement / Construction of PCCP along Daclan - Bonagan - Tikey Camanggaan Provincial Road | 5,000,000.00 | 20% PDF CY 2017 | Summerlin Construction | Completed | with PCCP deficiency |
|
Kapangan | Sagubo | Improvement / Construction of PCCP along Lomon - Sagubo Provincial Road | 5,000,000.00 | 20% PDF CY 2017 | Sangin General Construction | Completed | partial accomplishment: imp/const of pccp along lomon-sagubo provincial road, kapangan as of March 30, 2018 |
|
La Trinidad | Lubas | Fencing of La Trinidad National High School, Lubas | 500,000.00 | 20% PDF CY 2017 | SEJ Construction | Completed | 100%Completed - Total Cost Incurred PhP 479,663.72 as of April 30, 2018 |
|
La Trinidad | Alapang | Improvement of Bahong Dapiting - Alapang BENECO Road | 500,000.00 | 20% PDF CY 2017 | SEJ Construction | Completed | Completed on October 23, 2018 |
|
Kibungan | Madaymen | Improvement of Nangayangan - Masala FMR, Masala | 500,000.00 | 20% PDF CY 2017 | Pulicay Grandsons Construction | Terminated | Terminated for change of title and location |
|
La Trinidad | Tawang | Construction of Footsteps at Upper Boted, Tawang, La Trinidad | | 20% PDF CY 2017 | | Completed | 78.00% completed with 330,676.69 total cash incurred as of May 2018. |
|
Kibungan | Lubo | Improvement of Lubo - Sayangan Barangay Road, Lubo | 500,000.00 | 20% PDF CY 2017 | Balangcod Construction | Completed | 1) Completed: April 11,2018 - Total Cost Incurred PhP 498,621 as of April 30, 2018
2)Suspended effective February 7, 2018 awaiting action for the submitted realignment of the project to "Improvement for Madaymen - Namul -acan - Masala FMR" of BLGU - Resumed effective March 20, 2018; Revised Target Completion Date on April 22, 2018 |
|
La Trinidad | Wangal | Improvement of Barangay Road at Upper Gayasi, Wangal | 500,000.00 | 20% PDF CY 2017 | Sangin Construction | Completed | Completed on March 2, 2018 |
|
Sablan | Banangan | Improvement of Ambacuag, Oring FMR | 500,000.00 | 20% PDF CY 2017 | Aguinsod Construction | Completed | Completed on March 12, 2018 |
|
Sablan | Bagong | Improvement of Bagong FMR | 500,000.00 | 20% PDF CY 2017 | Guardian Construction | Completed | Completed on April 2, 2018 with Php 498,828.15 total cost incurred |
|
Mankayan | Taneg | Improvement of Baayasan - Sabean FMR | 500,000.00 | 20% PDF CY 2017 | Sharamelle Construction and General Engineering | Completed | Completed on May 30, 2018, with 498,454.47 total cost incurred |
|
Kabayan | Ballay | Construction of Concrete Canal and Riprapping along Dimipiyas FMR | 500,000.00 | 20% PDF CY 2017 | Jamil Sean Construction | Completed | Completed on March 23, 2018 |
|
Kabayan | Lusod | Improvement of Proper Lusod Ba-ayan FMR | 500,000.00 | 20% PDF CY 2017 | Jamil Sean Construction | Completed | Completed on March 21, 2018 - for Post inspection |
|
Mankayan | Balili | Improvement of Atayan - Macawawa Dasoy Barangay Road | 5,000,000.00 | 20% PDF CY 2017 | Toclo Construction | Completed | Completed on March 13, 2018 |
|
Mankayan | Suyoc | Construction of Pacda FMR, Roadside Riprap, Pacda, Suyoc Palasaan | 500,000.00 | 20% PDF CY 2017 | Toclo Construction | Completed | Completed on March 17, 2018 |
|
Mankayan | Sapid | Improvement of Lower Tubo FMR | 500,000.00 | 20% PDF CY 2017 | Toclo Construction | Completed | Completed on February 19, 2018 |
|
Kapangan | Taba-ao | Construction of Concrete Footpath at Abiang,Taba-ao | 250,000.00 | 20% PDF CY 2017 | ADL Construction | Completed | |
|
Atok | Naguey | Construction of Tirepath along Sawingan to Bua Barangay Road | 500,000.00 | 20% PDF CY 2017 | Haight's Construction | Terminated | |
|
Buguias | Catlubong | Improvement of Bot-oan - Ponopon FMR | 500,000.00 | 20% PDF CY 2017 | Juricmarc Construction | Completed | For post inspection |
|
Itogon | Tuding | Road Protection along Lower Mangga Road, Tuding (Phase II) | 200,000.00 | 20% PDF CY 2017 | | Completed | |
|
Kibungan | Sagpat | Construction of Slope Protection and Drainage Canal at Akbab, Sagpat, Kibungan, Benguet | 300,000.00 | 20% PDF 2017 | | Completed | |
|
Kabayan | Batan | Construction of Multi-Purpose Building, Bajen (Phase I and Phase II) | 800,000.00 | 20% PDF CY 2017 | Sangin Construction | Completed | |
|
Kapangan | Paykek | Improvement along Lomon Kapangan Provincial Road | 5,000,000.00 | 20% PDF CY 2017 | BTCJR Construction and Engineering Services | Completed | 22.80% Completed - Total Cost Incurred PhP 1,159,066.19 as of April 13, 2018 |
|
Atok | Cattubo | Improvement of Barangay Road at KM. 54 to Tulodan | 500,000.00 | 20% PDF CY 2017 | Haight's Construction | Completed | |
|
Bakun | Ampusongan | Improvement along Ampusongan to Nakanga Road | 500,000.00 | 20% PDF CY 2017 | Reasons Construction | Completed | |
|
Bakun | Sinacbat | Improvement of Ba-ey - Cangaw to Dalingoan FMR | 1,000,000.00 | 20% PDF CY 2017 | Reasons Construction | Completed | Completed |
|
Bakun | Bagu | Improvement of Maliteng - Saddle FMR | 500,000.00 | 20% PDF CY 2017 | Pulicay Grandsons Construction | Completed | Completed(97.19%) on March 4, 2018 with underrun. |
|
Buguias | Sebang | Improvement of Mankaet-Pasbol FMR (Extension) | 500,000.00 | 20% PDF CY 2017 | Random Builders | Completed | Completed on February 26, 2018 |
|
Kapangan | Labueg | Concreting of Longboy - Tacal - Busoc FMR | 500,000.00 | 20% PDF CY 2017 | guardian copnstruction/ruben pacheco jr. | Completed | Completed on January 29, 2018 |
|
La Trinidad | Betag | Improvement of Barangay Road (near Depayso's Residence) | 500,000.00 | 20% PDF CY 2017 | ICO Construction | Completed | Completed on January 25, 2018 |
|
Itogon | Gumatdang | Rehabilitation of Besil - Narba Footbridge, Gumatdang | 500,000.00 | 20% PDF CY 2017 | Aljune Builders | Completed | Completed and usable
cluster h contracts at itogon : a) rehab of besil-narba footbridge, b)const of waiting shed @ dampingan, c) const of waithing shed @ sakbil |
|
Bokod | Daclan | Improvement of the Linen and Laundry Section, DMMH | 340,000.00 | 20% PDF CY 2017 | DMCD Engineering and Construction | Completed | |
|
Kapangan | Paykek | Completion of Ricemill Facility Housing and Accessories at Cadtay Kapangan | 500,000.00 | 20% PDF CY 2017 | Vanket Engineering and Construction | Completed | 100% Completed - Total Cost Incurred PhP 493,595.29 as of April 30, 2018 |
|
Kibungan | Badeo | Construction of Mocgao Day Care Center Building, Badeo, Kibungan | 1,000,000.00 | 20% PDF CY 2017 | Remnant Builders | Completed | Completed
Revised Target Date of Completion: August 6, 2018 |
|
Kibungan | Madaymen | Construction of Concrete Pavement along Tagapaya-Salong FMR | 1,000,000.00 | 20% PDF CY 2017 | Hillbrand Engineering | Completed | COMPLETED: Reported and recommended for no payment since the project was completed prior to the release of the NTP; for termination |
|
La Trinidad | Alno | Construction of Footpath with Railings from Elementary to National High School, Alno | 586,000.00 | 20% PDF CY 2017 | DMCD Engineering and Construction | Completed | Completed with slippage on April 23, 2018 |
|
La Trinidad | Tawang | Concreting of Purok 4, Tawang Barangay Road Towards Tawang - Lubas - Ambiong National Road | 300,000.00 | 20% PDF CY 2017 | Sangin Construction | Completed | Completed on February 28, 2018 |
|
La Trinidad | Cruz | Construction of Slope Protection at Sitio Kangas, Cruz | 500,000.00 | 20% PDF CY 2017 | Guardian Construction | Completed | Completed on March 30, 2018 |
|
Sablan | Bayabas | Construction of Waiting Shed, Pidawan, Bayabas | 330,000.00 | 20% PDF CY 2017 | Anas Construction | Completed | |
|
Sablan | Palali | Construction of Septic Tank and Site Improvement of a Quarantine Checkpoint along Naguilian Road | 150,000.00 | 20% PDF CY 2017 | Anas Construction | Completed | Completed on February 4, 2018 |
|
Tublay | Tublay Central | Improvement of School Ground at TSHI Extension, Tublay Central , Tublay Benguet | 250,000.00 | 20% PDF CY 2017 | Sangin Construction | Completed | |
|
Buguias | Buyacaoan | Construction of flood control, Gusadan | 500,000.00 | 2017 20% PDF | MacGat Construction | Completed | Completed: 07/18/2018 with 1 suspension
Revised target date of completion: 07/24/2018 |
|
Kabayan | Eddet | Improvement of Balang-Sokong-Pinanchay-Talukip-Cable FMR, Eddet, Kabayan | 500,000.00 | 2017 20% PDF | | Completed | |
|
Kibungan | Sagpat | Improvement along Sagpat - Sapdaan Provincial Road | 5,000,000.00 | 20% PDF CY 2017 | Sangin General Construction | Completed | 18.44% Completed with 11.51% Slippage - Total Cost Incurred PhP 308,342.67 as of April 13, 2018. |
|
Bokod | Daclan | Construction of Stage for Bokod National High School, Ambangeg Campus, Daclan | 400,000.00 | 20% PDF CY 2017 | Sangin Construction | Completed | Completed |
|
Sablan | Bayabas | Construction of Barn House, OPAG, Bulala | 1,000,000.00 | 20% PDF - 2017 | Anas Construction | Completed | |
|
Atok | Cattubo | Improvement/ Construction of PCCP along Tuludan - Sayangan Provincial Road | 5,000,000.00 | 20% PDF - 2017 | Buganheirs Eng'g and Construction | Completed | 88.55% completed with a revised target date of completion = 09/27/2018 |
|
Kapangan | Kapangan Central | Construction of Grouted Riprap,Central,Kapangan (below Barangay Hall),Central,Kapangan,Benguet | 500,000.00 | 20% PDF - 2017 | Pulicay Grandsons Construction | Completed | |
|
Buguias | Bangao | Improvement of Loading Platform-Quarantine Checkpoint Located at Cotcot, Bangao, Buguias, Benguet | 300,000.00 | 20% PDF - 2017 | On Top Construction | Completed | |
|
Sablan | Bagong | Construction of waiting shed, Cayapes | 250,000.00 | SB #1, CY 2017 | Guardian Construction | Completed | |
|
La Trinidad | Puguis | Construction of Irrigation Tank at CTS, Puguis | 200,000.00 | 20% PDF 2017 | JURICMARC CONSTRUCTION | Completed | |
|
La Trinidad | Bineng | Improvement of Sitio Kagiskis Barangay Road at Bineng, La Trinidad, Benguet | 500,000.00 | 20% PDF 2017 | On Top Construction | Completed | |
|
Itogon | Loacan | Construction of Public Toilet at Geweng,Loacan,Itogon,Benguet | 200,000.00 | 20% PDF CY 2017 | Aljune Builders | Completed | |
|
Buguias | Baculongan Sur | Completion of Obanga CDC Building | 700,000.00 | 20% PDF 2017 | MACGAT Construction | Completed | Completed, Rough Phase. |
|
Tuba | Taloy Sur | Construction of Additional Watertank | 200,000.00 | 20% PDF | Roben Runas Construction | Completed | Completed on November 5, 2018 |
|
Kapangan | Pudong | Concreting Along Alimuyos Foot-trail (Bacatey - Toplac | 300,000.00 | 20% PDF 2017 | Juricmarc Construction | Completed | Completed and usable. |
|
Tublay | Daclan | Construction of Footbridge at Meril, Daclan, Tublay, Benguet | 500,000.00 | 20% PDF-2017 | Hillstone Builders | Completed | |
|
Kapangan | Cayapes | Construction of Grouted Riprap in School Boundaries, Cayapes | 500,000.00 | 20% PDF 2017 | E.B Titiwa General Eng'g & Construction | Completed | |
|
Bokod | Ekip | Improvement of Multi-Purpose Building | 500,000.00 | 20% PDF 2017 | Hillbrand Engineering | Completed | |
|
La Trinidad | Wangal | Construction of 3rd Floor Roofing and Improvement of Buildings, Benguet Technical School, Wangal, La Trinidad | 2,500,000.00 | 20% PDF 2017 | On Top Construction | Completed | Ongoing with 45.90% completion as of January 2019 |
|
Tuba | Camp 6 | Construction of quarantine Checkpoint along Kennon Road, Tuba, Benguet | 400,000.00 | 20% PDF 2017 | Ruben B. Runas Construction | Completed | Completed and usable |
|
Buguias | Amlimay | Completion of Dagway Box Culvert | 500,000.00 | 20% PDF 2017 | SEJ Construction | Completed | |
|
Kabayan | Anchokey | Construction of Tirepath Along Anchokey FMR, Abat, Anchokey | 500,000.00 | 20% PDF 2017 | Four Brothers | Completed | |
|
Kabayan | Pacso | Improvement of Apanberang-Washington Acess Road, Pacso, Kabayan | 500,000.00 | 20% PDF 2017 | Four Brothers Construction | Completed | |
|
Kabayan | Gusaran | Improvement of Farm to Market Road at Maebat | 600,000.00 | 20% PDF 2017 | Jamil Sean Construction | Completed | Suspended effective November 29, 2018 due to closed access road caused uncleared slides on various sections
1 suspension |
|
Sablan | Balluay | Improvement of Balluay - Perrel FMR | 500,000.00 | 20% PDF 2017 | Guardian Construction | Completed | 1 Suspension
Revised Target Date=3/4/2019
|
|
La Trinidad | Wangal | Fencing of School Perimeter with Ground Improvement | 500,000.00 | 20% PDF 2017 | Drich Loui Construction | Completed | Completed February 5, 2018 |
|
Buguias | Calamagan | Construction of Camanbeey - Calamagan Road Pavement/Tirepath | 500,000.00 | 20% PDF - 2017 | JYP Construction | Completed | |
|
Kapangan | Boklaoan | Improvement of Barangay Road, Boklaoan, Kapangan, Benguet | 500,000.00 | 20% PDF 2017 | Drich Loui Construction | Completed | Completed with Under run |
|
La Trinidad | Tawang | Construction of Handrail of Footsteps at Upper Boted, Tawang, La Trinidad | 200,000.00 | 20% PDF 2017 | ICO Construction | Completed | Completed on June 28, 2018 with liquidated damages |
|
Kabayan | Pacso | Road Opening Pacso, Kabayan | 500,000.00 | 20% PDF 2017 | Akiki Builders | Terminated | |
|
Kibungan | Madaymen | Construction of Concrete Pavement along Tagpaya - Salong | 1,000,000.00 | 20% PDF 2017 | Hillbrand Engineering | Terminated | Reported and recommended for no payment and for termination since the project was already completed |
|
La Trinidad | Balili | Completion of Shed From BSU Horticulture Along CHED, Ogas Store UCCP Church Balili, La Trinidad, Benguet | 500,000.00 | 20% PDF 2017 | Haight's Construction | Terminated | Mutually terminated
Recommended for reprogramming |
|
Kibungan | Madaymen | Improvement of Madaymen - Namul-acan - Masala FMR, Kibungan | 500,000.00 | 20% PDF 2017 | NAIR Construction and Engineering | Completed | |
|
Kibungan | Madaymen | Construction of Enrique Jose Elementary School Waterworks System, Madaymen | 800,000.00 | 20% PDF - 2017 | Four Brothers | Completed | |
|
Bakun | Dalipey | Construction of Conacon Footbridge | 200,000.00 | 20% PDF CY 2017 20% PDF CY 2016 | NAIR Construction & Engineering | Completed | 1) Construction of Conacon Footbridge (additional) - 20% PDF CY 2017 (Php 150,000.00)
2) Construction of Conacon Footbridge - 20% PDF CY 2016 (PhP 50,000.00)
3) Completed on February 19, 2018. |
|
Bakun | Kayapa | Improvement of Kayapa to Bulisay FMR | 2,000,000.00 | 20% PDF 2018 | SRBA General Construction /Ray Angluben | Completed | 98.92% accomplishment; completed with underrun |
|
Bakun | Poblacion | Tirepathing of Limosan-Tenging FMR | 500,000.00 | 20% PDF 2018 | Pulicay Grandsons Construction | Completed | 96.04% completed with underrun and liquidated damages. |
|
Tuba | Twin Peaks | Improvement of Bacaog-Bayating to Bawek FMR, Twin Peaks | 750,000.00 | 20% PDF CY 2018 | Sapdoy Enterprises | Completed | Completed = 09/20/2018 Revised Target Date of Completion = 10/01/2018
1 suspension |
|
Mankayan | Tabio | Improvement of Baguingey to Piled Panad Road,Tabio,Mankayan,Benguet | 300,000.00 | 20% PDF - 2018 | Dipas Builders | Completed |
Completed on 10-23-18
|
|
Buguias | Abatan | Improvement of Halsema - Upper Nakiangan FMR,Abatan,Buguias,Benguet | 500,000.00 | 20% PDF - 2018 | NAIR Construction | Completed | Completed with LD |
|
Buguias | Loo | Improvement of Loo-Panayaoan FMR, Loo, Buguias | 250,000.00 | 20% PDF - 2018 | MACGAT Construction | Completed | |
|
Tuba | Camp 6 | Improvement of Pathway with Shed Leading to Lower Green Valley to Millsite,Camp 6,Tuba,Benguet | 1,000,000.00 | 20% PDF - 2018 | Roben B. Runas Construction | Completed | 1 suspension |
|
Tuba | Poblacion | Rehabilitation of Badiwan Road | 500,000.00 | 20% PDF - 2018 | Sapdoy Enterprises | Completed | Completed = 09/04/2018, Revised Target Date of Completion = 09/17/2018
2 Suspensions |
|
Kapangan | Taba-ao | Concreting of Cotocot-Abiang Foot Trail, Abiang, Taba-ao, Kapangan,Benguet | 250,000.00 | 20% PDF - 2018 | EBTITIWA General engineering and Construction Services | Completed | Completed on November 14, 2018 |
|
Bokod | Bila | Construction of Grouted Riprap along the area of rural Health Center (RHC) Bila,Bokod,Benguet | 300,000.00 | 20% PDF - 2018 | SRBA General Construction | Completed | update as of January 2019 |
|
Buguias | Baculongan Sur | Improvement along Nakagang-Sayangan-Beleng-Paing,Baculungan Sur | 1,000,000.00 | 20% PDF - 2018 | MACGAT Construction | Completed | Revised Target Date=08/12/2018. 1 Suspension
|
|
Kabayan | Ballay | Improvement of Ballay liang to taaw FMR | 2,000,000.00 | 20% PDF 2018 | Jamil Sean Construction | Completed | |
|
La Trinidad | Puguis | Improvement of Access road at Buhaw, Puguis, La Trinidad | 1,000,000.00 | 20% PDF 2018 | Akip Contruction | Completed | 100% completed. |
|
Kabayan | Ballay | Improvement of Barangay Road at Tinaleb, Ballay, Kabayan, Benguet | 500,000.00 | 20% PDF | | Completed | |
|
Mankayan | Balili | Rehabilitation of Water Works System, Balili E/S, Balili, Mankayan | 500,000.00 | 20% PDF - 2018 | Donato-Sakiwat Construction | Completed | Completed as programmed and usable. |
|
Bakun | Ampusongan | Improvement of Ampusongan to Nakanga Road | 1,000,000.00 | 20% PDF - 2018 | Pulicay Grandson's Construction | Completed | |
|
Buguias | Loo | Improvement of Nabellang (Nagutikan Section) | 1,500,000.00 | 20% PDF 2018 | | Completed | |
|
Bokod | Pito | Construction of Tire path | 500,000.00 | 20% PDF 2018 | BLDY Engineering & Construction | Completed | 1) 1 suspension
2) on going with 15% completion as of January 2019 |
|
Atok | Caliking | Construction of Barangay Health Station, Km. 24, Caliking | 2,500,000.00 | 20% PDF 2018 | Drichloui Construction | Completed | |
|
Bakun | Gambang | Improvement of Liwang - Bolbolo FMR, Gambang | 1,000,000.00 | 20% PDF 2018 | Drichloui Construction | Completed | |
|
Kapangan | Cuba | Concreting of Bocao Foot Trail | 300,000.00 | 20% PDF CY 2018 | CJ OLIVIA Construction | Completed | Completed and usable, final inspection, March 8, 2019. |
|
La Trinidad | Wangal | Improvement of Access Road and Site Development of Bahay Pag-asa Center Wangal | 5,000,000.00 | 20% PDF 2018 | SEJ Construction & Aggregate | Completed | |
|
Tuba | Ansagan | Construction of Terterem Flood Control, Ansagan, Proper | 1,200,000.00 | 20% PDF 2018 | Reasons Construction | Completed | |
|
Tuba | Tadiangan | Improvement of Gymnasium at Tadiangan, Tuba | 500,000.00 | 20% PDF 2018 | Four Brothers Construction | Completed | Completed and usable |
|
Buguias | Baculungan Sur | Construction of Obanga Drainage Canal (Bad-ayan - Obanga - Paing FMR) | 1,000,000.00 | 20% PDF 2018 | JYP Construction | Completed | |
|
Bokod | Pito | Construction Of Tirepath At Simbonan, Pito, Bokod, Benguet | 500,000.00 | 20% PDF 2018 | BLDY Eng'g & Construction | Completed | |
|
Buguias | Abatan | Improvement of Hospital Building and Annexes:Construction of Dental Room with Annexes,Construction of Gen. Expert Room,Abatan,Buguias | 1,800,000.00 | 20% PDF-2018 | AIP Construction | Completed | |
|
Itogon | Ampucao | Construction of footbridge at Sitio Limingaling | 2,000,000.00 | 20% PDF 2018 | HGW=3 Eng'g & Construction | Completed | Completed with underrun.
|
|
La Trinidad | Wangal | Construction of PCCP with Drainage Canal at Provincial Housing Project,Phase II,Wangal | 2,000,000.00 | 20% PDF-2018 | Pulicay Grandson's Construction | Completed | |
|
Mankayan | Guinaoang | Completion of Guinaoang Multi-purpose Hall,Guinaoang,Mankayan,Benguet | 1,000,000.00 | 20% PDF - 2018 | Malco Construction | Completed | |
|
La Trinidad | Ambiong | Construction of Concrete Perimeter Fence (Phase II) to Enclose the Ambiong Elementary School | 200,000.00 | 20% PDF CY 2017 | | Completed | On-going with 85.08% accomplishment as of January 8, 2018 with liquidated damages. |
|
Tuba | Camp 6 | Improvement of pathway with shed leading to lower Green Valley to Millsite, Tuba Camp 6 | 1,000,000.00 | 20% PDF 2018 | Ruben Runas Construction | Completed | Project Completed revised target date - 12/13/18 |
|
Sablan | Kamog | Improvement of Multi-Purpose Hall at Central Kamog, Sablan | 1,200,000.00 | 20% PDF - 2018 | Guardian Construction | Completed | |
|
Kibungan | Madaymen | Construction of PCCP along Tagpaya-Matikid FMR, Madaymen, Kibungan | 1,500,000.00 | 20% PDF 2018 | Pulicay Grandson Construction | Completed | Completed with LD & Under run |
|
Buguias | Amgaleyguey | Completion of Km. 73 Multi-Purpose Hall, Amgaleyguey | 1,500,000.00 | 20% PDF 2018 | Drichloui Construction | Completed | |
|
Buguias | Baculungan Sur | Improvement along Bad-ayan - Manhuyuhuy Provincial Road | 5,000,000.00 | 20% PDF - 2018 | Drichloui Construction | Completed | Completed on June 24, 2019 with liquidated damages
|
|
Mankayan | Suyoc | Rehabilitation of Gueday Waterworks System, Suyoc, Mankayan | 800,000.00 | 20% PDF - 2018 | MALCO Construction | Completed | |
|
Tublay | Ambassador | Construction of Barangay Health Station at Ambassador, Tublay, Benguet | | 20% PDF - 2018 | Elfer Construction and Enterprise | Completed | |
|
La Trinidad | Bineng | Improvement along La Trinidad - Capitol - Bineng Provincial road | 5,000,000.00 | 20% PDF 2018 | Sangin Gen. Construction | Completed | - Completed as of October 4, 2019.
- 6 sections |
|
Kabayan | Gusaran | Construction of PCCP Along National Road JCT - Diboong - Bangao Provincial Road at Kabayan | | 20% PDF 2018 | Solonio Construction (Ritchie Solonio) | Terminated | Terminated due to site problem.
Contract terminated as of June 28, 2019
|
|
Mankayan | Guinaoang | Slope Protection at Ambabag - Poy-oc FMR, Guinaoang, Mankayan, Benguet | 1,000,000.00 | 20% PDF 2018 | | Completed | |
|
Buguias | Baculungan sur | Rehabilitation of Nakagang-Sayangan-Beleng-Paing-Obanga FMR | 600,000.00 | 20% PDF-2019 | Macgat Construction | Completed | |
|
Bakun | Gambang | Improvement of Sookan-Gambang Barangay Road, Gambang | 1,000,000.00 | 20% PDF 2019 | Drichloui Construction | Completed | Images taken on June 18, 2019 |
|
Buguias | Loo | Slope Protection and Improvement of Panayaoan - Loo Barangay Road | 1,000,000.00 | 20% PDF 2019 | HGW=3 Engineering and Construction | Completed | |
|
Buguias | Buyacaoan | Improvement of Bekes - Bayoyo FMR, Buyacaoan | 500,000.00 | 20% PDF 2019 | Macgat Construction | Completed | |
|
Buguias | Poblacion | Improvement of Posel-Demang FMR, Poblacion, Buguias | 500,000.00 | 20% PDF 2019 | Macgat Construction | Completed | |
|
Buguias | Poblacion | Improvement of Insalong-Padongay FMR | 1,000,000.00 | 20% PDF 2019 | BTCJR Construction and Eng'g Services | Completed | |
|
Buguias | Poblacion | Improvement of Sidel Balakbak-Nilawitan FMR | 500,000.00 | 20% PDF 2019 | On Top Construction | Completed | |
|
Bokod | Bobok-Bisal | Construction of Multi-purpose Gym at Bobok-Bisal,Bokod,Benguet | 4,000,000.00 | 20% PDF - 2019 | Hillbrand Engineering | Completed | |
|
Itogon | Ampucao | Concreting of Lumbag Road,Ampucao,Itogon,Benguet | 500,000.00 | 20% PDF - 2019 | Queges Builders & Enterprise | Completed | |
|
Tuba | Camp 4 | Construction of Flood Control Along Bued Riverside,Camp 6,Tuba,Benguet | 2,400,000.00 | 20% PDF - 2019 | 2,227,206.94 | Completed | |
|
Tublay | Ambassador | Construction of PCCP,Coroz-Tabeo-Sto. Nino E/S Extension,Ambassador,Tublay,Bengeut | 2,000,000.00 | 20% PDF - 2019 | Tagel Construction | Completed | completed |
|
La Trinidad | Bahong | Rehabilitation along Bahong-Sadag Provincial Road | 1,000,000.00 | 20% PDF 2019 | SEJ Construction | Completed | |
|
La Trinidad | Shilan | Improvement along Km. 12 (Shilan) - Sagpawe Provincial Road | 5,000,000.00 | 20% PDF 2019 | SEJ Construction | Completed | |
|
La Trinidad | Beckel | Improvement along Beckel - Balangbang Provincial Road | 5,000,000.00 | 20% PDF 2019 | Drichloui Construction (Roy M. Balay-odao) | Completed | |
|
Atok | Cattubo | Improvement along Tulodan - Sayangan Provincial Road | 5,000,000.00 | 20% PDF 2019 | Efler Construction and Enterprise | Completed | 1.) Suspension recommended effective June 27, 2019 pending the issuance of ECC;
2.) Actual date of completion: November 16, 2020.
|
|
Bakun | Kayapa | Construction of Box Culvert at Kayapa-Bulisay FMR, Kayapa, Bakun | 1,200,000.00 | 20% PDF 2019 | SRBA General Construction | Completed | |
|
La Trinidad | Wangal | Ground Improvement and Completion of Indigenous Building | 500,000.00 | SB # 2 2020 | On Top Construction | Completed | Project Engineer: Ceasar Wacay
Geotagged by: J G. C |
|
La Trinidad | Wangal | Repair of PEO Building, Wangal, La Trinidad, Benguet | 1,000,000.00 | 2018 20% PDF | LBJ Construction | Completed | Project Engineer: Porter B. Camsol
Geotagged by: Jeffrey G. Cabato |
|
La Trinidad | Wangal | Improvement of PEO Building/Extension Phase II (Planning ROW, Survey Section & Motor-pool Division | 6,500,000.00 | GSO-2019 | LBJ Construction | Completed | Project Engineer: Porter B. Camsol
Geotagged by: JC |
|
Tublay | Caponga | Construction of Perimeter Fence at Palew ES | | 20% PDF 2017 | James Palangdan | Completed | |
|
Tublay | Basil | Rehabilitation of Danis Water Works System, Basil Tublay | 800,000.00 | SB-No.1-2019 | FMCwarriors Construction | Completed | |
|
La Trinidad | Wangal | Construction of Multi-purpose Building at Wangal | 2,000,000.00 | 20% PDF CY 2016 General Fund CY 2015 | JCA Construction anfd Engineering Services | Temporarily suspended | Suspended effective July 18, 2017 due to site problem.
1 suspension.
Mutual Termination on process.
|
|
Kabayan | Eddet | a) Consruction of Daket-Oguban Footbridge, Eddet, Kabayan; b) Construction of Daket-Oguban Footbridge, Eddet (Additional) | 1,764,000.00 | 20% PDF-2014 & SB # 02 - 2016 | Random Builders | Completed | |
|
La Trinidad | Tawang | Construction of Senior Citizen's Building at Barangay Tawang | 1,600,000.00 | 20% PDF CY 2015 , SB No. 2 CY 2015 CCO - 20% PDF | Leo Heirs Construction | Completed | Based from the picture taken on May 18, 2018, the building is not yet physically completed. |
|
La Trinidad | Ambiong | Improvement of Gulon Road at Ambiong | 1,800,000.00 | 20% PDF CY 2015, SB No. 5 CY 2015 | Drichloui Construction | Completed | |
|
Tuba | Tadiangan | Concreting of Hydro 2-Absay Footpath at Tadiangan | 460,000.00 | SB No. 05 & GF 2015 | Roben Runas Construction | Completed | Cluster "H" a) Control No. 08-16-00013 - Roben Runas Construction |
|
Bakun | Ampusongan | Construction of Multi-purpose Building (Additional) | 4,500,000.00 | SB No. 5 CY 2015 & 20% PDF CY 2016 | Reasons Construction | Completed | Completed as per plan. |
|
Kabayan | Ballay | Improvement of Inuman WWS, Ballay | 150,000.00 | SB #2 - 2015 & 20%PDF-2016 | Four Brothers | Completed | |
|
Kabayan | Pacso | Construction of Mangoto Day Care Center (Phase 1 and Phase 2) | 1,050,000.00 | 20% PDF CY 2015 SB No. 2 CY 2016 | Bosongan Construction | Completed | Completed on February 25, 2018 |
|
Tuba | Tabaan Norte | a.) Construction of Parasipis Health Station (Phase II); b.)Construction of Barangay Health Station (Additional) Parasipis Tabaan Norte, Tuba | 939,000.00 | 20% Project Development Fund - 2015 & SB #2 GF-2016 | Roben Runas Construction | Completed | |
|
Tublay | Ambongdolan | Construction of Sante Footbridge at Payay,Ambongdolan (Additional),Tublay,Benguet | 400,000.00 | 20% PDF - 2017 | Sandstream Construction | Completed | |
|
Itogon | Virac | Improvement along Provincial Road Construction of Diversion Road - Batuang Provincial Road | 873,000.00 | 20% PDF CY 2016, SB No. 2. CY 2016 GF | ICO Construction | Completed | Completed on May 22, 2017
clustered
a) improvement along baguio - balatoc - itogon provincial road; b) const of diversion road - batuang prov'l road @ virac, itogon |
|
Bakun | Poblacion | Construction of Beyeng Barrio School | 1,110,000.00 | 20% PDF CY 2016 SB No. 1 2017 | Reasons Construction | Completed | 1)Completed on February 20, 2018
2) 20% PDF CY 2016 (PhP 1,000,000.00) SB No. 1 CY, GF (PhP 110,000.00) |
|
Tuba | San Pascual | Establishment of Provincial organic swine and poultry farm, San Pascual, Tuba (Construction of Phase I-Storage Building for feeds, supplies and tools for organic / native swine demo farm) | 400,000.00 | 20% PDF 2016 & SB # 1 2017 | Ruben Runas Construction | Completed | Completed (rough finishing) |
|
Kapangan | Balakbak | a) Fencing of Heritage Park Balakbak Elementary School, Kapangan; b) Fencing of Heritage Park Balakbak Elementary School, Kapangan - Additional | 312,000.00 | 20% PDF 2017 & SB# 1 2017 | Four Brothers Construction | Completed | |
|
La Trinidad | Betag | Improvement of Benguet General Hospital Annex B Building | 150,000.00 | SB # 01 - 2017, 20% PDF | ADL Construction | Completed | |
|
Buguias | Lengaoan | Construction of Gymnasium at Lengaoan - Waking Elementary School | 5,000,000.00 | 20% PDF CY 2016 PSBF CY 2016 | Almond Engineering and Construction | Completed | Completed on June 9, 2017 |
|
Mankayan | Bulalacao | a) Construction of Sr. Citizen Building and b.) Construction of Sr. Citizen building additional, Bulalacao, Mankayan | 900,000.00 | SB No. 6 2015 and 20% PDF CY 2015 | | Completed | Need additional funding for full completion |
|
Sablan | Bayabas | Construction of Multi-Purpose Building at Agri-Eco farm | 2,000,000.00 | SB No. 5 CY 2012 and SB No. 5 CY 2013 | | Completed | Completed and usable |
|
Buguias | Loo | Construction of Taba-ao Waterworks System at Patpat | 100,000.00 | SB No. 2 CY 2014 | | Completed | For post inspection |
|
Buguias | Abatan | Improvement of Buguias Federated Senior Citizen's Building Located at Abatan | 100,000.00 | SB No. 2 CY 2014 | Juricmarc Construction | Completed | |
|
Tuba | San Pascual | Construction of Piggery Building | 1,600,000.00 | 20% PDF 2014 | Queges Builders and Enterprise | Terminated | Suspended due to site problem.
Terminated as of February 03, 2020.
|
|
Bakun | Sinacbat | Construction of Sinacbat Public Toilet with Shower Room | 500,000.00 | SB No. 4 CY 2015 | FMC Warriors Construction | Completed | Completed as per plan. |
|
Buguias | Loo | Improvement of Lanas - Taba-ao - Nagutikan FMR | 150,000.00 | SB No. 2 CY 2016 GF | | Completed | Completed on December 21, 2017 |
|
Buguias | Catlubong | Construction of Bekes-Palakad Tirepath at Bekes-Palakad | 500,000.00 | SB No. 5 CY 2015 | Mel-Soc Construction | Completed | Revised target completion date on April 16, 2017. Deducted PhP 500.00 due to substandard billboard. |
|
Buguias | Buyacaoan | Cementing of Tirepath at Duntog | 300,000.00 | SB No. 5 CY 2015 | | Completed | Completed on December 12, 2017 |
|
Buguias | Amgaleyguey | Concrete Tirepathing of Dangwa FMR at Guiwe | 300,000.00 | SB No. 5 CY 2015 GF | | Completed | Completed on December 15, 2017 |
|
Bokod | Ekip | Improvement of Multi-Purpose Hall Pethal, Ekip, Bokod | 1,700,000.00 | SB No. 5 CY 2015 | Aroboan Construction | Completed | CLUSTERED b) Control No.: 01-15-00052 - Aroboan Construction
85.21% completed with LD |
|
Kabayan | Ballay | Construction of Multi-Purpose Building at Tinaleb | 1,000,000.00 | SB No. 5 CY 2015 | | Completed | Completed and usable with liquidated damages |
|
Kabayan | Eddet | Construction of Eddet Waterworks System | 1,000,000.00 | SB No. 5 CY 2015 | | Completed | Completed and usable with underrun and liquidated damages. |
|
Kabayan | Batan | Improvement of Batan FMR | 150,000.00 | SB No. 5 CY 2015 | 4 Brothers Construction | Completed | |
|
Kabayan | Poblacion | Improvement of Poblacion Barangay Hall | 1,000,000.00 | SB No. 5 CY 2015 | Akiki Builders | Completed | 90.00% Completed with liquidated damages - Total Cost Incurred PhP 898,621.05 as of March 2018; post-inspected on January 15, 2018 |
|
Kabayan | Bashoy | Improvement of Day Care Center, Pulag, Bashoy | 800,000.00 | SB No. 5 CY 2015 | Aroboan Construction | Completed | Completed on February 22, 2018 |
|
Kibungan | Madaymen | Construction of Masala Day Care Center, Madaymen, Kibungan | 800,000.00 | SB #2 CY 2015 | | Completed | |
|
Kibungan | Tacadang | Construction of Litalit Footrail, Tacadang, Kibungan | 300,000.00 | SB No. 5 CY 2015 | | Completed | |
|
Itogon | Dalupirip | Improvement of Footrail at Sitio Tivang Pigingan, Dalupirip | 75,000.00 | SB No.1 CY 2015 | jessie construction and services/ jessie palangdan | Completed | Clausters
project construction of waiting shed at tenedy, itogon, benguet and improvement of foottrail at sitio tivang to mt. pigingan at dalupirip, itogon, benguet. |
|
Itogon | Ampucao | Establishment of Botanical Garden at Ampucao | 150,000.00 | SB No. 2 CY 2015 | MK Construction | Completed | cluster c: a) concreting of bito-pasiday fmr (phase II) in apmucao, itogon; b) establishment of botanical garden at ampucao, itogon |
|
Kapangan | Kapangan Central | Construction of Garage and Warehouse, KMCH, Kapangan, Benguet | 1,000,000.00 | SB No. 1 CY 2015 | Balangcod Construction | Completed | |
|
Kapangan | Cuba | Construction of Multi-Purpose Building, Cuba, Kapangang, Benguet | 500,000.00 | SB No. 5 CY 2015 | Balangcod Construction | Completed | |
|
La Trinidad | Poblacion | Improvement of Benguet Museum Building | 1,000,000.00 | SB No. 03 CY 2015 GF | Haight's Construction | Completed | 1) Completed March 21, 2018
2) This project was suspended on December 1, 2017 to January 17, 2018 |
|
Tublay | Ambongdolan | Construction of Footpath at Payay, Ambongdolan | 150,000.00 | SB No. 6 CY 2015 | Sangin Construction | Completed | |
|
La Trinidad | Beckel | Improvement of Barangay Road at Pagal | 150,000.00 | SB No. 5 CY 2015 GF | SEJ Construction | Completed | 75.43% Completed with under run. |
|
La Trinidad | Poblacion | Construction of MRF at Buyagan | 200,000.00 | SB No. 5 CY 2015 GF | SEJ Construction | Completed | Input the accurate coordinates of the project |
|
La Trinidad | Betag | Improvement of Walkway at Benguet General Hospital | 500,000.00 | SB No. 1 CY 2015 | Balangcod Construction | Completed | |
|
La Trinidad | Betag | Improvement of Benguet General Hospital Building | 265,000.00 | SB No. 1 CY 2015 | Balangcod Construction | Completed | |
|
Mankayan | Bulalacao | Const'n of Ambingan-Cotcot Footpath, Bulalacao | 4,000,000.00 | SB No. 5 CY 2015 | | Completed | Need additional fund for fully completion |
|
Mankayan | Cabiten | Construction of Waiting Shed at Poked Las-igan, Cabiten, Mankayan | 350,000.00 | SB No. 05 CY 2015 | Baldas Construction | Completed | Cluster "G" b) Control No. 03-15-00028 c) 02-16-000122 - Baldas Construction |
|
Mankayan | Guinaoang | Tirepathing (Phase I) at Lower Dowag, Guinaoang, Mankayan | 350,000.00 | SB No. 5 CY 2015 | Baldas Construction | Completed | Cluster "G" a) Control No. 03-15-00027 c) 02-16-000122 - Baldas Construction |
|
Sablan | Bagong | Cluster 'HH' Construction of Duban-Tufil Footpath at Bagong Sablan | 600,000.00 | SB No. 5 CY 2015 | Anas Construction | Completed | |
|
Sablan | Bayabas | Construction of Multi-Purpose Building at Bayabas | 1,200,000.00 | SB No. 5 CY 2015 | Anas Construction | Completed | |
|
Sablan | Bayabas | Cluster "Q" a) Construction of Deepwell with Jet matic at Sitio Matal-og | 217,798.41 | SB No. 3 CY 2015 | Sangin Construction | Completed | |
|
Bokod | Poblacion | Improvement of Mangagew FMR | 299,000.00 | SB No. 5 CY 2015 | | Completed | |
|
Buguias | Catlubong | Wallayan-Abbatan Road Construction | 1,000,000.00 | SB No. 5 CY 2015 | | Completed | |
|
Sablan | Bayabas | Riprapping along Bekes - Talete FMR | 300,000.00 | SB No. 5 CY 2015 GF | | Completed | |
|
Sablan | Poblacion | Construction of Deepwell with Jetmatic (Phase I) Exploration at Matal-og | 81,100.00 | SB No. 4 CY 2015 | | Completed | |
|
Kabayan | Tawangan | Riprap of Lusod - Tawangan NHS Grounds at Tawangan | 1,000,000.00 | SB No. 5 CY 2015 GF | | Completed | Completed on July 18, 2016 |
|
Kapangan | Gaswiling | Completion of Barangay Health Station | 200,000.00 (Initial appropriation) | SB No. 5 CY 2015, SB No. 5 CY 2015 General Fund | family circle construction/marcos luma-ang | Completed | |
|
Mankayan | Balili | Construction of Road at Bila - Cabacab | 1,000,000.00 | SB No. 5 CY 2015 GF | | Completed | Completed on June 30, 2016 |
|
Itogon | Tuding | Construction of Day Care Center (Phase II), Lucnab | 990,000.00 | SB No. 5 CY 2015 | Ico Construction Services/ Jerico A. Palangdan | Completed | |
|
Buguias | Abatan | Construction of Concrete Riprap along Gal-udan - Abatan Access Road | 150,000.00 | SB No. 5 CY 2015 | Mel-Soc Construction | Completed | |
|
Tuba | Taloy Sur | Improvement of Poyopoy Elementary School Ground | 1,000,000.00 | SB No. 5 CY 2015 | | Completed | Completed - September 3, 2016 |
|
Tublay | Ambassador | Installation of PVC Pipes for Sewerage System | 230,000.00 | SB No. 5 CY 2015 | Hillstone Builders | Completed | Completed on September 29, 2016 |
|
Buguias | Loo | Puputak - Beka Road Construction | 1,000,000.00 | SB No. 5 CY 2015 | | Completed | |
|
Kapangan | Labueg | Construction of Barangay Hall (Additional), Labueg | 400,000.00 | SB No. 5 CY 2015 | Bolos Construction Engr. Edgar Baclawad | Completed | Completed on August 16, 2016 |
|
Kapangan | Labueg | Concreting of Canal along Longboy - Tacal FMR | 300,000.00 | SB No. 5 CY 2015 | Guardian Construction, Ruben Pacheco Jr. | Completed | Completed on August 9, 2016 |
|
Kapangan | Taba-ao | Concreting and Installation of handrails along Carel - Balete - Debeng Foot Trail at Daclan, Taba-ao | 200,000.00 | SB No. 5 CY 2015 | Balangcod Construction/Fermin D. Balangcod | Completed | Completed on August 6, 2016 |
|
Mankayan | Sapid | Construction of Nursery Bridge at Sapid | 1,500,000.00 | SB No. 5 CY 2015 | | Completed | Completed - August 15, 2016 |
|
Kapangan | Gadang | Cementing of Mangingeb to Bial Residence Footpath Trail, Namat-ican Gadang | 300,000.00 | SB No. 5 CY 2015 | Balangcod Construction | Completed | Completed on November 25, 2016 |
|
Kibungan | Poblacion | Construction of Kibungan Municipal Guest House Annex (Phase I) | 1,000,000.00 | SB No. 4 CY 2015 | | Completed | Completed on November 14, 2016 |
|
Kabayan | Batan | Construction of Bajeng Waterworks System, Batan | 200,000.00 | SB #5 - 2015 | Four Brothers | Completed | |
|
Bakun | Bagu | Improvement of Benggekan Road, Bagu | 500,000.00 | SB No. 5 CY 2015 | FMC Warriors Construction | Completed | Completed on October 10, 2016 |
|
Bokod | Ambuklao | Improvement of Ambuklao Elementary Stage | 200,000.00 | SB No. 5 CY 2015 | 4 Brothers Construction | Completed | Completed on October 6, 2016 (Backstage only) |
|
Kibungan | Sagpat | Construction of Flood Control at Sagpat | 500,000.00 | SB No. 5 CY 2015 | Pulicay Grandsons Construction | Completed | Completed on March 21, 2018 |
|
Itogon | Ampucao | Construction of Basketball Court (Phase II) at Cruz | 500,000.00 | SB No. 5 CY 2015, General Fund (Non Office) | Aljune Builders | Completed | Completed on March 6, 2018 |
|
Kapangan | Cayapes | Widening and Improvement of FMR from Barangay Central (Sagubo Junction) to Cayapes | 900,000.00 | SB # 5 2015 | Family Circle Construction | Completed | |
|
Tuba | Tadiangan | Construction of Marville Daycare Center, Tadiangan, Tuba | 1,000,000.00 | SB # 05 - 2015 | ANAS Construction | Completed | |
|
Tuba | Camp 6 | a.)Construction of Footbridge at Riverside, Camp 6, Tuba; b.)Construction of Footbridge at Riverside, Camp 6, Tuba (additional), Camp6, Tuba, Benguet | | a.)SB#05CY2015 b.)SB#012017 | Juricmarc Construction | Temporarily suspended | Suspended as of September 24, 2018.
1 suspension |
|
Atok | Abiang | Improvement of Banangan-Lower Abiang FMR | 750,000.00 | SB No. 2 CY 2016 | RNAA Builders | Completed | |
|
Bakun | Sinacbat | Construction of Footpath at Sinacbat to Bolibo | 150,000.00 | SB No. 2 CY 2016 | NAIR Construction & Engineering | Completed | Completed as per plan. |
|
Bakun | Sinacbat | Construction of Galvanized Water Tank at Bakun National High School - Extension | 50,000.00 | SB No. 2 CY 2016 | Sandstream Construction | Completed | Completed as per plan. |
|
Itogon | Loakan | Construction of waterworks system of purok II, Barangay Loakan | 500,000.00 | SB No. 2 CY 2016 | | Completed | |
|
Bakun | Poblacion | Construction of School Gymnasium | 5,000,000.00 | SB No. 2 CY 2016 | Reasons Construction | Completed | Completed as per plan. |
|
Bakun | Gambang | Construction of Kil-ingan Communal Forrest Nursery at Yago | 200,000.00 | SB No. 2 CY 2016 | Sandstream Construction | Completed | Completed with underrun. |
|
Bakun | Gambang | Improvement of Waterworks System at Cagam-is | 300,000.00 | SB No. 2 CY 2016 | Sandstream Construction | Terminated | |
|
Buguias | Sebang | Repair of Alapang - Lengaoan Footbridge | 300,000.00 | SB No. 2 CY 2016 GF | On Top Construction | Completed | Completed on March 6, 2017 |
|
Mankayan | Sapid | Improvement of Sapid - Pacda FMR | 2,000,000.00 | SB No. 2 CY 2016 & 20% PDF CY 2016 | | Completed | Need additional fund |
|
Mankayan | Taneg | Taneg Road Opening, Baayan, Sabian, Mankayan | 500,000.00 | SB No. 2 CY 2016 GF | Eugao Construction | Completed | |
|
Buguias | Sebang | Improvement of Pasbol - Ibisan in Sebang | 300,000.00 | SB No. 2 CY 2016 | SEJ Construction | Completed | Completed on March 7, 2017 |
|
Buguias | Catlubong | Improvement of Ponopon - Lusab FMR (Additional) | 500,000.00 | SB No. 2 CY 2016 | SEJ Construction | Completed | Completed on March 20, 2017 |
|
Buguias | Poblacion | Improvement of Padang - Naytoyab FMR | 2,000,000.00 | SB No. 2 CY 2016 | | Completed | Completed on March 18, 2017 |
|
Buguias | Baculongan Norte | Road Improvement at Pugo - Yuko-an Section | 800,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on March 28, 2017 |
|
Buguias | Poblacion | Construction of Pavement at Bolo - Tocdo - FMR at Poblacion | 1,000,000.00 | SB No. 2 CY 2016 | | Completed | |
|
Buguias | Catlubong | Improvement of Mansoysoy - Ambanglo FMR | 1,000,000.00 | SB No. 2 CY 2016 | | Completed | Project Completed with underrun and Liquidated Damages |
|
Buguias | Baculongan Norte | Improvement along Puo - Apunan - Ketang FMR | 500,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on September 22, 2017 |
|
Buguias | Amgaleyguey | Construction of Tirepath Junction Polis - Akiki FMR | 500,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on August 7, 2017 |
|
Buguias | Amgaleyguey | Construction of Basketball Court at Sagandoy Elementary School (Phase 2) | 250,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on August 16, 2017 with liquidated damages |
|
Buguias | Loo | Construction of Balakbak - Magubgubang Flood Control at Pusong | 500,000.00 | SB No. 2 CY 2016 | | Completed | Completed on September 22, 2017 |
|
Buguias | Bangao | Road Improvement at Macascasa | 500,000.00 | SB No. 2 CY 2016 | | Completed | Completed on September 26, 2017. |
|
Buguias | Bangao | Construction of Pavement at Amdodon FMR, Tinapan Section | 300,000.00 | SB No. 2 CY 2016 | | Completed | Completed on September 26, 2017. |
|
Buguias | Calamagan | Tirepathing at Palonsay | 400,000.00 | SB No. 2 CY 2016 | | Completed | Completed on September 12, 2017 |
|
Buguias | Calamagan | Construction of Comfort Room for Calamagan Elementary School | 400,000.00 | SB No. 2 CY 2016 | | Completed | Revised project completion date to September 25, 2017 |
|
Buguias | Sebang | Improvement of Panig-an - Butiki - Tamangan FMR | 500,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on September 9, 2017
Clustered E1 Project, a)imp of panig-an - butiki - tamangan FMR, Buguis (Add'l) @ Sebang, Buguias, Benguet |
|
Buguias | Amlimay | Improvement of Dagway - Toplac Waterworks System | 300,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on December 30, 2017 |
|
Buguias | Poblacion | Construction of Kiosk at Poblacion | 50,000.00 | SB No. 2 CY 2016 | On Top Construction | Completed | Completed on December 13, 2017 |
|
Buguias | Poblacion | Improvement of Sabyatan - Tocdo - Nilawitan FMR | 1,000,000.00 | SB No. 2 CY 2016 | ICO Construction | Completed | Completed on January 21, 2018 |
|
Buguias | Bangao | Road Improvement at Camanggaan, Natugtugan | 500,000.00 | SB No. 2 CY 2016 GF | ICO Construction | Completed | Completed on February 26, 2018 |
|
Buguias | Baculongan Norte | Ground Improvement of Bano-oy Elementary School | 500,000.00 | SB No. 2 CY 2016 | | Completed | Completed - December 30, 2017 For post inspection |
|
Buguias | Buyacaoan | Improvement of Day Care Center at Magmagaling | 450,000.00 | SB # 2 - 2016 | On Top Construction | Completed | |
|
Buguias | Poblacion | Construction of 2 Classroom Building for Enggay - Willie Primary School | 1,900,000.00 | SB No. 2 CY 2016 PSBF | HGW=3 Engineering & Construction | Completed | 1) Revised target completion date April 12, 2018 |
|
Buguias | Buyacaoan | Improvement of Day Care Center at Magmagaling | 450,000.00 | SB # 2 - 2016 | On Top Construction | Completed | |
|
Buguias | Catlubong | Construction of Waiting shed at Padang - Palakad | 450,000.00 | SB # 2 - 2016 | On Top Construction | Completed | |
|
Kabayan | Ballay | Improvement of Unnoy - Taaw FMR | 1,000,000.00 | SB No. 2 CY 2016 | | Completed | |
|
Kabayan | Tawangan | Improvement of Lusod - Tawangan National High School Road at Tawangan | 400,000.00 | SB No. 2 CY 2016 | Jamil Sean Construction | Completed | |
|
Kabayan | Batan | Rehabilitation of Penged Waterworks System | 500,000.00 | SB No. 2 CY 2016 | Sangin General Construction | Completed | Completed and usable with liquidated damages |
|
Kabayan | Ballay | Improvement of Bagto - Akikian FMR at Ballay | 300,000.00 | SB No. 2 CY 2016 | Jamil Sean Construction | Completed | |
|
Kabayan | Ballay | Construction of Riprap along Taaw FMR at Ballay | 200,000.00 | SB No. 2 CY 2016 | Jamil Sean Construction | Completed | |
|
Kabayan | Ballay | Construction of Riprap along Tinaleb FMR at Ballay | 500,000.00 | SB No. 2 CY 2016 | Jamil Sean Construction | Completed | |
|
Kabayan | Gusaran | Improvement of Road at Bangao - Gusaran | 500,000.00 | SB No. 2 CY 2016 | Solonio Construction | Completed | |
|
Kabayan | Gusaran | Construction of Footpath at Tekeng - Mogaben, Gusaran, Kabayan | 250,000.00 | SB No. 2 CY 2016 | Akiki Builders | Completed | 95.00% Completed with liquidated damages - Total Cost Incurred PhP 236,829.11 as of March 2018; Post-inspected on January 5, 2018 |
|
Kabayan | Gusaran | Construction of Footpath at Naysuyoc | 250,000.00 | SB No. 2 CY 2016 | Akiki Builders | Completed | |
|
Kabayan | Adaoay | Concreting of Pathway along Adaoay National High School, Binado | 300,000.00 | SB No. 2 CY 2016 | Akiki Builders | Completed | |
|
Kabayan | Lusod | Construction of Community Public Comfort Rooms at Proper Lusod | 300,000.00 | SB No. 2 CY 2016 | | Completed | |
|
Kabayan | Tawangan | Improvement of Lubban - Hahagod FMR | 200,000.00 | SB No. 3 CY 2016 | | Completed | |
|
Kabayan | Adaoay | Extension of COMPAC at Adaoay | 500,000.00 | SB No. 4 CY 2016 | | Completed | |
|
Kapangan | Beling-Belis | Completion of Day Care Center Beling-Belis | 500,000.00 | SB No. 2 CY 2016 | Balangcod Construction, Fermin Balangcod | Completed | Completed as planned |
|
Kapangan | Labueg | Improvement of Longboy-Tacal Road in Labueg, Kapangan, Benguet | 700,000.00 | SB No. 2 CY 2016 | RNAA Builders | Completed | |
|
Kapangan | Cayapes | Construction of Footbridge, Pilo, Cayapes | 300,000.00 | SB No. 2 CY 2016 | Balangcod Construction | Completed | Contract under cluster e: a) const of footbridge at pilo, cayapes, kapangan; b) const of multi-purpose building at cuba kapangan (add'l) |
|
Kibungan | Sagpat | Construction of Senior Citizen Building, Sagpat, Kibungan | 1,200,000.00 | SB No. 2 CY 2016 | RNAA Builders | Completed | 1) Duration-158.20 Calendar Days
2) 100.00% Completed - Total Cost Incurred PhP 1,157,715.09 as of May 2018 |
|
Kibungan | Tacadang | Rehabilitation of Pingew Footbridge | 350,000.00 | SB No. 2 CY 2016 | Akip Construction and Enterprise | Completed | |
|
Itogon | Ampucao | Slope protection-Sinco, Ampucao | 1,000,000.00 | SB No. 2 CY 2016 | MK Construction | Completed | |
|
Itogon | Ampucao | Concreting of Bito-Pasiday FMR (Phase II) | 250,000.00 | SB No. 2 CY 2016 | MK Construction | Completed | contract under cluster c: a) concreting of bito-pasiday fmr (phase II) in apmucao, itogon; b) establishment of botanical garden at ampucao, itogon |
|
Itogon | Loacan | Construction of footpath with railings at Anteg-in | 200,000.00 | SB No. 2 CY GF | BEMADA Construction | Completed | Completed on January 5, 2018
contract under cluster c: c) const of footpath with railings at anteg-in, loacan, itogon |
|
La Trinidad | Puguis | Improvement of Bato - Longlong FMR | 1,000,000.00 | SB No. 2 CY 2016 | RNAA builders Roy K. Kepes | Completed | |
|
La Trinidad | Tawang | Improvement of Tawang Viewdeck | 300,000.00 | SB No. 2 CY 2016 | Universal De Leon Construction and Aggregates | Completed | Writing were found on the viewdeck |
|
La Trinidad | Wangal | Improvement of Cosaran Barangay Road | 300,000.00 | SB No. 2 CY 2016 | Universal De Leon Construction and Aggregates | Completed | |
|
La Trinidad | Puguis | Improvement of Guadayan Road | 1,200,000.00 | SB No. 2 CY 2016 | RNAA Builders | Completed | |
|
La Trinidad | Ambiong | Construction of Perimeter Fence of Ambiong Elementary School | 200,000.00 | SB No. 2 CY 2016 | Universal De Leon Construction and Aggregates | Completed | Completed with liquidated damages |
|
La Trinidad | Tawang | Improvement of Cruz - Tawang Road | 500,000.00 | SB No. 2 CY 2016 | Universal De Leon Construction and Aggregates | Completed | |
|
La Trinidad | Poblacion | Concreting of Road at Upper Buyagan (Additional) | 500,000.00 | SB No. 2 CY 2016 | Universal De Leon Construction and Aggregates | Completed | |
|
La Trinidad | Tawang | Improvement of Road from Barangay Hall to Cemetery | 500,000.00 | SB No. 2 CY 2016 | | Completed | |
|
La Trinidad | Balili | Construction of Flood Control and Pathway Railings at Bell Church Creek | 1,200,000.00 | SB No. 2 CY 2016 | Leo Heirs Construction, Emmanuel Leo | Completed | Completed as planned |
|
La Trinidad | Balili | Construction of Sidewalk - Central Balili - PAGASA | 500,000.00 | SB No. 2 CY 2016 | Leo Heirs Construction, Emmanuel Leo | Completed | Input the accurate coordinates of the project |
|
La Trinidad | Beckel | Construction of Senior Citizen's Building (Phase II) | 800,000.00 | SB No. 5 CY 2015, GF | ICO Construction | Completed | 1) Completed
2) Suspended January 31, 2018 - March 21, 2018
3) Revised target date of completion = April 2, 2018 |
|
La Trinidad | Poblacion | Completion of Fencing Jail Perimeter at PGO Jail | 200,000.00 | SB No. 2 CY 2016 | | Completed | |
|
La Trinidad | Poblacion | Improvement of School Ground at La Trinidad Central School | 400,000.00 | SB No. 2 CY 2016 | RNAA builders, Roy k. Kepes | Completed | |
|
La Trinidad | Poblacion | Construction of Concrete Pavement at Bato, Puguis | 200,000.00 | SB No. 2 CY 2016 | RNAA builders, Roy k. Kepes | Completed | Clusters: a)imp of school ground, La Trinidad Central School, Pob, LTB; b)const of concrete pavement @ Bato, Puguis, LTB |
|
Mankayan | Suyoc | Construction of Grouted Riprap along Pacda Barangay Road, Suyoc | 200,000.00 | SB No. 2 CY 2016 GF | Eugao Construction | Completed | |
|
Sablan | Bagong | Cluster "HH" a.) Construction of Footpath at Cayapes, Bagong, Sablan | 600,000.00 | SB No. 2 CY 2016 | Anas Construction | Completed | |
|
Sablan | Kamog | Cluster 'HH' b.) Riprapping and Construction of Pavement Along Lower Tenekey FMR in Kamog, Sablan | 600,000.00 | SB No. 2 CY 2016 | Anas Construction | Completed | |
|
Sablan | Kamog | Construction of Walkway Shade in Sablan NHS | 100,000.00 | SB No. 2 CY 2016 | Sangin Construction | Completed | |
|
La Trinidad | Betag | Improvement of CT Scan Building (Electrical Cabling) | 1,200,000.00 | SB No. 1 CY 2016 | | Completed | |
|
La Trinidad | Shilan | Construction of FMR Connet Shilan | 500,000.00 | SB # 2 - 2016, GF | SEJ Construction and Aggregate | Completed | |
|
Bakun | Poblacion | Construction of Senior Citizen's Multi-Purpose Building, Poblacion Bakun | 1,000,000.00 | SB No. 2 CY 2016 | Pulicay Grandsons Construction | Completed | |
|
La Trinidad | Puguis | Improvement of Access Road in Puguis La Trinidad (DSWD Lingap Center to Veterans Building Area) | 500,000.00 | SB No. 2, CY 2016, GF-Non Office | RNAA Builders | Completed | Completed on March 30, 2018 |
|
Buguias | Abatan | Improvement of Halsema - Nakiangan Barangay Road, Abatan, Buguias, Benguet | 500,000.00 | 20% PDF CY 2017 | Cliff Construction | Completed | |
|
Bakun | Poblacion | Improvement of Bagiw Foottrail Phase I | 300,000.00 | SB No. 2 CY 2016 | Pulicay Grandsons Construction | Completed | Completed on March 17, 2018 with underrun |
|
Buguias | Poblacion | Improvement of the School Ground of Buguias Central School in Poblacion, Buguias, Benguet | 500,000.00 | SB No. 3 CY 2016 | SEJ Construction | Completed | |
|
Buguias | Abatan | Improvement of Hospital Building, NBDH Bekes | 800,000.00 | SB No. 2 CY 2016 | AIP Construction | Completed | 1) 1 Suspension
2) Revised Target Date of Completion is on November 11, 2018
3) Completed, 2nd Revised Target Date of Completion = 11/11/2018
|
|
Buguias | Baculongan Sur | Construction of Tirepath at Kelong Section along Balintag-Palintaang FMR | 200,000.00 | SB No. 2 CY 2016 GF | Macgat Construction | Completed | Completed on February 20, 2018 |
|
Kabayan | Tawangan | a) Improvement of Kapalan FMR at Tawangan b) Improvement of Nanhabitan - Kapalan Extension FMR | 1,000,000.00 | SB No. 2 CY 2016 | Jamil Sean Construction | Completed | Completed: 07/08/2018
Revised target date of completion: per suspension order no. 1 is on 07/24/2018 |
|
Kapangan | Kapangan Central | Construction of Barangay Hall, Central Kapangan | 1,500,000.00 | SB No. 2 CY 2016 | Balangcod Construction | Completed | |
|
La Trinidad | Beckel | Road Improvement - Sapsing and Beckel (Phase II) | 500,000.00 | SB No. 2 CY 2016 | SEJ Construction and Aggregates | Temporarily suspended | 1) Suspended Aug. 18, 2017; The Barangay officials and end users had requested for the mutual termination of this project to pave way for the preparation of a new program of work.
2) Update as of June 2018 |
|
Mankayan | Bulalacao | Construction of Flood Control at Lower Demang, Bulalacao | 100,000.00 | SB No. 2 CY 2016 | Sharamelle Construction and General Engineering | Completed | Completed on February 26, 2018 |
|
Mankayan | Bulalacao | Improvement along Gawaan - Akmet Road, Bulalacao | 500,000.00 | SB No. 2 CY 2016 | Eugao Construction | Completed | Completed on March 20, 2018 |
|
Mankayan | Colalo | Concreting of Busan Pathway, Busan, Colalo | 200,000.00 | SB No. 2 CY 2016 | Dipas Builders | Completed | Completed on March 20, 2018 |
|
Tuba | Camp 4 | Road Opening and Construction of Grouted Riprap Retaining Wall at Lalab, Camp 4, Tuba,Benguet | 700,000.00 | SB # 3 - 2016 | Sapdoy Enterprise | Completed | 1 suspension |
|
Sablan | Balluay | Improvement of Talwan - Peril FMR | 800,000.00 | 20% PDF CY 2016 | Guardian Construction | Completed | Ongoing, 70% completed |
|
Bakun | Poblacion | Improvement of Bagiw Footbridge | 280,000.00 | SB No. 1 CY 2017 | Pulicay Grandsons Construction | Completed | 1) Cluster "G" Pulicay Grandsons Construction
2) Completed on February 22, 2018. |
|
Bakun | Poblacion | Improvement of Bagiw Foottrail | 500,000.00 | SB No. 1 CY 2017 | Pulicay Grandsons Construction | Completed | 1) Cluster "G" Pulicay Grandsons Construction
2) Completed on February 6, 2018 |
|
La Trinidad | Betag | Improvement of Betag Road (Passing by INC Church) | 2,000,000.00 | SB No.1 CY 2017 GF | Buganheirs Engineering Construction | Completed | Completed on June 26, 2018 |
|
Sablan | Banangan | Completion of Oriyao Footpath | 700,000.00 | SB No. 1 CY 2017 | Anas Construction | Completed | Completed on February 2, 2018 |
|
La Trinidad | Wangal | Construction of Corridor and Upper Bleachers for the Multi-Purpose Gym at Benguet Sports Center | 416,000.00 | SB No. 1 CY 2017 | RNAA Builders | Completed | Completed on February 23, 2018 |
|
La Trinidad | Wangal | Construction of Guard House (Benguet PAG-ASA Center) | 500,000.00 | SB No. 1 CY 2017 | Random Builders | Completed | 16.55% Completed - Total Cost Incurred PhP 82,562.87as of February 2018 |
|
Bokod | Karao | Improvement of Poblacion to Karao FMR Located at Karao | 1,500,000.00 | SB No. 1 CY 2017 | Summerlin Construction | Completed | Completed with revised target completion date of May 20, 2018 |
|
Bokod | Karao | Improvement of Boligueng Turning Point, Karao Road | 1,500,000.00 | SB No. 1 CY 2017 | Summerlin Construction | Completed | 1) Suspended as of March 6, 2018 and resumed on April 18, 2018;
2) Suspended again on July 16, 2018;
3) Resumed on November 7 ;
4) Completed w/ LD;
|
|
Mankayan | Colalo | Construction of Quarantine Checkpoint at Colalo, Mankayan, Benguet | 550,000.00 | SB No. 2 2017 | EUGAO Construction | Completed | |
|
Kabayan | Ballay | Ground Levelling and Construction of Retaining Wall at Ballay Elementary School Coumpound | 1,000,000.00 | SB # 1 2017 | Jamil Sean Construction | Completed | |
|
Bokod | Ekip | Construction of Comfort Rooms, Bokod National High School, Poodan, Ekip, Bokod | 1,000,000.00 | SB No. 1 CY 2017 | Hillbrand Engineering | Temporarily suspended | 2 suspensions
Suspended as of March 6, 2018;
Resumed on September 5, 2018.
Revised Target Date of Completion January 8, 2019
Awaiting for the endorsement of the Mayor of Bokod for resumption. |
|
Atok | Paoay | Construction of Kochi-Benguet Sisterhood Park Waterworks System | 509,000.00 | SB No.1 CY 2017 | Haight's Construction | Completed | |
|
Atok | Caliking | Improvement of Sayet-Ammey Farm to Market Road | 500,000.00 | SB No.1 CY 2017 | Sangin General Construction | Completed | |
|
Buguias | Baculongan Sur | Construction of Box Culvert at Kandapig Creek | 500,000.00 | SB No. 1 CY 2017 | Macgat Construction | Completed | 1) 98.23% Completed - Total Cost Incurred PhP 498,093.66 as of April 30, 2018 - For post inspection
2) Revised Target Completion Date April 19, 2018 |
|
Buguias | Bangao | Construction of Vegetable Processing Center | 3,200,000.00 | SB No. 1 CY 2017 | AIP Construction | Completed | Revised target date of completion: 07/09/2018
2 suspensions |
|
Buguias | Baculongan Sur | Improvement along Balintag - Teguing - Palintaang FMR | 500,000.00 | SB No. 2 CY 2016 | Macgat Construction | Completed | 1) 100% Completed - Total Cost Incurred PhP 497,216.36 as of April 30, 2018
2) Revised Target Completion Date May 2, 2018
3) For post inspection |
|
Kapangan | Gaswiling | Construction of Riprap Retaining Wall for Gaswiling BeMONC | | SB No. 1 CY 2017, GF | Pulicay Grandsons Construction | Completed | Completed on March 5, 2018 |
|
La Trinidad | Wangal | Rehabilitation of Provincial Housing Project Road Section | 2,700,000.00 | SB No. 1 CY 2017 | SEJ Construction | Completed | 100.00% completed with 2,667,976.02.
Completed May 19, 2018 |
|
Mankayan | Paco | Rehabilitation of Concrete Canal at Pukitan | 150,000.00 | SB No. 1 CY 2017 | Dipas Builders | Completed | Completed on February 5, 2018 |
|
Sablan | Bagong | Repair and Painting of Gonzales Elementary School Library | 490,000.00 | SB No. 1 CY 2017 | Guardian Construction | Completed | |
|
Bokod | Pito | Rehabilitation of Akbot Waterworks System | 500,000.00 | SB No. 1 CY 2017 | DMCD Engineering and Construction | Completed | Revised Start Date (Orig. February 1, 2018) and Target Completion Date (Orig. March 26, 2018) |
|
Bokod | Ekip | Concreting of Ekip FMR/Barangay Road | 200,000.00 | SB No. 1 CY 2017 | Vanket Engineering and Construction | Completed | Completed on March 19, 2018 |
|
Bokod | Ekip | Construction of Pangis Footbridge in Ekip, Bokod | 495,000.00 | SB No. 1 CY 2017 | Vanket Engineering and Construction | Completed | Completed |
|
Tuba | Tadiangan | Improvement / Construction of PCCP along Yagyagan - Ampusa Provincial Road | 2,000,000.00 | SB No. 1 CY 2017 | Anas Construction | Completed | 80.76% Completed - Total Cost Incurred PhP 1,608,679.13 as of April 13, 2018 |
|
Mankayan | Suyoc | Construction of FMR Riprap, Suyoc, Mankayan | 500,000.00 | SB No. 1 2017 | A.L Sagandoy Construction | Completed | |
|
Buguias | Amlimay | Completion of Barangay Health Station (Clinic) Amlimay,Buguias,Benguet | 1,000,000.00 | SB # 01-2017 | Pulicay Grandsons Construction | Completed | |
|
Kabayan | Lusod | Consruction of Lusod Proper Footbridge, Lusod, Kabayan | 1,000,000.00 | SB # 01 - 2017 | Haight's Construction | Completed | Completed with 1 suspension and 1 extension
Revised Target Date =11/21/2018 |
|
Buguias | Buyacaoan | Construction of Salingao to Ikip Flood Control (Batbatoan Section) | 1,000,000.00 | SB no. 2-2017 | Juricmarc Construction | Completed | |
|
Kapangan | Balakbak | Construction of Comfort Room at the Heritage Park, Balakbak, Kapangan | 500,000.00 | SB # 1 - 2017 | Precious Gold Builders | Completed | Completed, final inspection, March 8, 2019. |
|
La Trinidad | Wangal | Construction of Four Bathrooms (2 Male Bathrooms, 2 Female Bathrooms) and Laundry Area with Water Tank at Benguet Bahay Pag-asa Center La Trinidad, Benguet | 1,000,000.00 | SB # 1-2017 | NAIR Construction & Engineering | Completed | Completed and usable. |
|
Buguias | Natubleng | Construction of Police Substation and Tourism Information and assistance Center at Natubleng (Additional) | 450,000.00 | SB # 1 - 2017 | On Top Construction | Completed | |
|
Itogon | Tinongdan | Construction of Ambowet Footbridge at Sitio Domolpos | 300,000.00 | SB #1 2017 | YKJ - LHAT General Construction | Completed | Completed and usable. |
|
Tublay | Daclan | Improvement of Alukip Barangay Road | 500,000.00 | 20% PDF 2017 | Hillstone Builders | Completed | Completed |
|
La Trinidad | Betag | Improvement of Sewage Treatment Plant (Phase II), BeGH, Betag, La Trinidad, Benguet | 1,000,000.00 | 20% PDF 2017 | AKIP Construction and Enterprise | Completed | 1 suspension |
|
Itogon | Loacan | Completion of Perimeter Fence at Loacan National High School | 150,000.00 | SB #1 2017 | YKJ-LHAT General Construction | Completed | Completed |
|
Atok | Paoay | Installation of Electricity of Senior Citizens Building, KM 46, Paoay, Atok | | Sb # 1-2018, PEO | Four Brothers | Completed | |
|
Bokod | Ambuklao | Development of Historical Sites and Prospective Tourist Destinations of Barangay Ambuklao, Bokod, Benguet | 500,000.00 | 20% PDF 2018 | | Completed | |
|
Kibungan | Madaymen | Construction of concrete pavement along Tagpaya-Salong FMR | 2,500,000.00 | SB#02 2018 | HGH=3 Eng'g & Construction | Completed | |
|
Itogon | Tinongdan | Improvement of the Hospital Building and Cottages at Itogon District Hospital at Itogon,Benguet | 2,500,000.00 | SB # 01-2019 | Tepanlu Construction and Supply | Completed | |
|
Mankayan | Bulalacao | Construction of Concrete Pavement along Halsema Junction-CotCot-Bulalacao FMR, Bulalacao, Mankayan | 600,000.00 | SB #1 CY 2017 GF | Nair Construction & Engineering | Completed | |
|
Itogon | Tinongdan | A) Construction of Garage and Morgue and OPD CR; B) Construction of Hospital Morgue Garage, Outside Male and Female CR; C) Upgrading of Facility, IDH | 1,800,000.00 | SB # 2 - 2014 / 20% PDF-2015 | WDG Construction | Completed | Completed and usable.
|
|
Itogon | Tinongdan | A)Construction of Garage and Morgue and OPD CR ; B) Const.of Hospital Morgue Garage, Outside Male and Female CR; C) Upgrading of the Facility, IDH. | 1,800,000.00 | SB # 02 - 2014 / 20% PDF-2015 | WDG Construction | Completed | Completed .Revised Target Date=26/10/2018
|
|
Itogon | Tinongdan | Construction of Guardhouse Itogon Hospital ; Construction of Guardhouse at Itogon Hospital (Add'l.) | 180,000.00 | SB # 02 - 2015 & 20% PDF-2014 | Bemada Construction | Completed | |
|
Kibungan | Poblacion | Construction of Senior Citizen Building (Phase II), Poblacion Kibungan | 2,000,000.00 | SB No. 2 CY 2016 20% PDF CY 2016 | Efler Construction | Completed | 100.00% Completed - Total Cost Incurred PhP 1,999,671.60 as of April 30, 2018 |
|
Buguias | Natubleng | Construction of Natubleng E/S Open Gym (Phase 1), Construction of Gym (Additional) Natubleng E/S, Construction of Gymnasium at Natubleng E/S | 5,000,000.00 | SB No. 4 CY 2015 GF, 20% PDF CY 2016, SEF CY 2016 | | Completed | Completed on March 27, 2017 |
|
La Trinidad | Poblacion | Improvement/ Installation of Roofing for the Third Floor of the Warehouse (DILG Office) | 300,000.00 | LDRRMF Trust fund | Hillstone Builders | Completed | |
|
Buguias | Amgaleyguey | Construction of Divsersion Canal and Open Tank Protected by Gabion | 835,000.00 | LDRRMF CY 2013 | | Completed | For Post Inspection |
|
Bakun | Gambang | Construction of Slope Protection as Batanes Primary School | 900,000.00 | LDRRMF CY 2015 | Drichloui Construction | Completed | Completed as per plan |
|
Buguias | Bangao | Rehabilitation of Bailey Bridge, Lapalap | 330,000.00 | LDRRMF CY 2015 | On Top Construction | Completed | |
|
La Trinidad | Wangal | Construction of Additional RC Retaining Wall | 1,130,000.00 | LDRRMF CY 2015 Trust Fund | | Completed | Input the accurate coordinates of the project |
|
Bakun | Poblacion | Rehabilitation/Improvement of Poblacion Canal System | 2,903,000.00 | LDRRMF CY 2015 Trust Fund | | Completed | Completed on July 18, 2016 with liquidated damages |
|
La Trinidad | Bineng | Improvement / Fencing of Day Care Center | 500,000.00 | LDRRMF CY 2015 Trust Fund | | Completed | Completed on September 20, 2016 |
|
Bakun | Poblacion | Construction of Concrete Drainage Canal & Footpath at Wagangan, Poblacion, Bakun | 350,000.00 | LDRRMF CY 2016-Trust Fund | NAIR Construction and Engineering | Completed | |
|
Buguias | Loo | Construction of Retaining Wall and Restoration of Concrete Pavement along Lanas- Taba-ao Farm to Market Road | 700,000.00 | LDRRMF 2016 | Drich Loui Construction | Completed | |
|
Bokod | Daclan | Construction of Slope Protection at the Dennis Molintas Memorial Hospital Daclan, Bokod, Benguet | 350,000.00 | LDRRMF-2016,Trust Fund | Pulicay Grandsons Construction | Completed | |
|
Itogon | Virac | Rehabilitation along Baguio - Balatoc Provincial Road | 8,016,454.94 | LDRRMF Trust Fund | Compass Rose Builders/ Daniel T. Sibelius | Completed | Completed on June 6, 2017 with liquidated damages |
|
Itogon | Virac | Improvement along Baguio - Balatoc Provincial Road | 2,000,000.00 | LDRRMF CY 2016 | ICO Construction | Completed | Completed on January 2, 2017 |
|
Kapangan | Pudong | Improvement of Cadtay - Pudong Provincial Road | 1,000,000.00 | LDRRMF CY 2016 | Balangcod Construction, Fermin D. Balangcod | Completed | with under run and Liquidated Damages |
|
Kabayan | Gusaran | Improvement along National Road Junction - Diboong - Bangao Provincial Road | 2,000,000.00 | LDRRMF CY 2016 | | Completed | |
|
Mankayan | Balili | Improvement along Mankayan - Balili Provincial Road | 2,000,000.00 | LDRRMF CY 2016 | | Completed | With Liquidated Damages |
|
Kapangan | Sagubo | Improvement along Lomon - Sagubo Provincial Road | 3,000,000.00 | LDRRMF CY 2016 | Bolos Engineering & Construction, Edgar B. Baclawa | Completed | With under run and liquidated damages |
|
Kapangan | Paykek | Improvement along Lomon - Paykek Provincial Road | 2,000,000.00 | LDRRMF CY 2016 | Balangcod Construction, Fermin D. Balangcod | Completed | 99.047% completed due to under run |
|
Tublay | Ambassador | Improvement along Labey - Lacamen Provincial Road | 2,000,000.00 | LDRRMF CY 2016 | Leo Heirs Construction/ Emmanuel S. Leo | Completed | with Liquidated Damages |
|
Itogon | Virac | Diversion of Batuang Road (Rehabilitation along Baguio - Balatoc Provincial Road) | 3,000,000.00 | LDRRMF CY 2016 | ico construction services/jerico palangdan | Completed | |
|
Kabayan | Gusaran | Rehabilitation of Diboong Provincial Road | 1,000,000.00 | LDRRMF Trust Fund | | Completed | For updating of actual Completion |
|
Buguias | Baculungan Sur | Rehabilitation along Bad-ayan-Manhuyohoy Provincial Road | 1,500,000.00 | LDRRMF 2016 | | Completed | |
|
Sablan | Provincial Road Sablan (for updating) | Rehabilitation along Sablan -Sabalan old Presidential Provincial Road | 1,000,000.00 | LDRRMF 2016 | | Completed | For updating |
|
Bakun | Ampusongan | Improvement along Tongey Farm to Market Road | 5,000,000.00 | LDRRMF CY 2016 | | Completed | |
|
Kabayan | Ballay | Construction of Retaining Wall along Liang-Taaw FMR, Ballay, Kabayan | 350,000.00 | LDRRMF CY 2016 - TRUST FUND | Jamil Sean Construction | Completed | |
|
Mankayan | Guinaoang | Construction of Retaining Wall at Guinaoang | 767,000.00 | LDRRMF CY 2016 Trust Fund | Sharamelle Construction and General Engineering | Completed | Completed on May 19, 2018, with 748,224.05 total cost incurred. |
|
Buguias | Catlubong | Construction of Drainage Canal along Padang - Mankilet FMR | 350,000.00 | LDRRMF CY 2016 | Macgat Construction | Completed | Revised target completion date (May 2, 2018).
Completed with 340,717.06 total cost incurred.
For post inspection |
|
Bakun | Poblacion | Construction of Drainage Canal and Riprap at Bacung | 350,000.00 | LDRRMF 2016 | SRBA General Construction | Completed | |
|
Tublay | Ambassador | Rehabilitation of Langgay Bajating Barangay Road, Ambassador, Tublay, Benguet | 350,000.00 | LDRRMF - 2016, Trust fund | Sangin General Construction | Completed | |
|
Sablan | Bayabas | Construction of Slope Protection at Agri-Eco Farm, Bulala, Bayabas, Sablan | 1,300,000.00 | LDRRMF 2016 Trust Fund | HGW = 3 Eng'g & Construction | Completed | |
|
Atok | Naguey | Rehabilitation of Naguey Vehicular Bridge (Abutment Foundation) | 3,200,000.00 | LDRRMF CY 2017 | BTCRJ Construction and Engineering | Completed | 1) Target Completion Date to be determined upon issuance of Resume Order.
2) 85% Completed - Total Cost Incurred PhP 2,702,485.97 as of April 30, 2018
3. For post-inspection |
|
La Trinidad | Wangal | Construction of Grouted Riprap at the Site of Benguet Training Center | 320,000.00 | LDRRMF CY 2017 | | Completed | Input the accurate coordinates of the project |
|
La Trinidad | Bineng | Improvement along Capitol - Bineng Provincial Road | 1,500,000.00 | LDRRMF CY 2017 | SEJ Construction | Completed | 82.09% Completed - Total Cost Incurred PhP 1,230,086.50 as of March 2018 |
|
Mankayan | Taneg | Construction of Vehicular Bridge at Sitio Kil-ingan | 9,265,000.00 | LDRRMF CY 2017 | Compass Rose Builders | Completed | Suspended on March 5, 2018 due to change order (inclusion of pedestrian lane). Resumed on April 30, 2018. And Actual Date of Completion is May 16, 2018. |
|
Itogon | Virac | Improvement of Kias - Padcal - Philex Provincial Road | 1,500,000.00 | LDRRMF CY 2017 | ICO Construction | Completed | 36.42% Completed with 8.51% slippage- Total Cost Incurred PhP 545,502.79 as of April 13, 2018 |
|
La Trinidad | Wangal | Improvement/ Upgrading of PDRRM Equipment Shed Multi-purpose warehouse | | LDRRMF CY 2017 | Hillstone Builders | Completed | |
|
Itogon | Ampucao | Rehabilitation of Manganese Elementary School Building | 400,000.00 | LDRRMF Trustfund | Aljune Builders | Completed | completed on April 18, 2018 |
|
La Trinidad | Puguis | Construction of Drainage Canal and Concrete Pathway at Palmaville Subdivision, La Trinidad, Benguet | 500,000.00 | Trust Fund - LDRRMF 2018 | Akip Construction | Completed | |
|
Tuba | Twin Peaks | Improvement along Camp1, Indaoac, Twin Peaks Provincial Road | 1,000,000.00 | LDRRMF | Sapdoy Enterprise / William W. Sapdoy | Completed | Completed as Planned. |
|
Buguias | Abatan | Construction of Drainage Canal System and Concrete Retaining Wall Along the Sinking Section of the Central Business District Area, Buguias | 1,500,000.00 | LDRRMF 2018 | Wacaden Construction | Completed | |
|
Tublay | Ambongdolan | Construction of Riprap at Pungayan - Betwag FMR | 830,000.00 | LDRRMF-2018 | Akip Construction and Enterprise | Completed | |
|
Kibungan | Sagpat | A.) Improvement along Kibungan Junction - Sagpat Provincial Road; B.)Rehabilitation along JNR Sagpat-Sapdaan Provincial Road | 3,000,000.00 | LDRRMF 2018 and 2019 | Balangcod Construction | Completed | |
|
Kapangan | Datakan, Labueg, and Lomon | Rehabilitation along Datakan-Labueg-Lomon Provincial Road | 4,000,000.00 | LDRRMF | Balangcod Construction | Completed | Brief description of project: Road concreting, removed and replaced PCCP, grouted riprap, gabion, and retaining wall;
- 1 suspension (August 7-29, 2019);
- Date completed: September 27, 2019
|
|
Mankayan | Guinaoang, Suyoc, and Taneg | Construction of Two Terraced Retaining Wall along Guinaoang-Suyoc-Taneg Provincial Road | 1,600,000.00 | LDRRMF, Trust Fund | Dicay Construction Supply and Services | Completed | |
|
La Trinidad | Pico | Construction of Drainage Canal at Lower Capjaran - Obudan, Km. 4 | 700,000.00 | LDRRMF, Trust Fund | Hillstone Builders | Completed | completed |
|
Atok | Caliking | Rehabilitation along Jose Mencio Provincial Road (section not covered by PRDP) | 6,000,000.00 | LDRRMF TF 2019 | Almond Engineering and Construction (Rogelio D. Alimondo) | Completed | Completed as of February 26, 2020. |
|
Itogon | Balatoc | Rehabilitation along Baguio - Balatoc - Itogon Provincial Road | 500,000,000.00 | LDRRMF TF 2019 | A.L. Sagandoy Construction (Agapito L. Sagandoy) | Completed | by JC |
|
Buguias | Baculongan Norte | Improvement of Bano-oy Elementary School of Baculongan Norte, Buguias | 780,000.00 | PSB No. 9 CY 2015 | | Completed | |
|
Buguias | Poblacion | Completion of Gymnasium for Stage and Bleachers of Buguias Central School in Central Buguias (Additional) | 780,000.00 | PSBF CY 2015 | Random Builders | Completed | Revised target completion date to October 1, 2017. |
|
Kibungan | Lubo | Construction of Cottage in Lubo, Kibungan, Benguet (additional) | 1,000,000.00 | PSBF CY 2015 | Cabuguisan Builders | Completed | |
|
Mankayan | Tabio | Construction of Building Phase II for Lepanto National High School, Palatong Annex in Palatong Mankayan (additional) | 1,200,000.00 | PSBF CY 2015 | Donato Sakiwat Construction | Completed | Need additional fund |
|
Mankayan | Bedbed | Construction of Payew Primary School Building in Bedbed | 800,000.00 | PSBF CY 2015 | | Completed | |
|
Bokod | Ekip | Reconstruction of Naswak Elementary School Teacher's Cottage | 1,000,000.00 | PSBF CY 2015 | | Completed | Suspended on August 12, 2016 to September 5, 2016 |
|
Sablan | Bayabas | Construction of Multi-Purpose Building (Phase II), Agri-Eco Farm | 1,000,000.00 | 20% PDF CY 2015 | Anas Construction | Completed | |
|
Buguias | Abatan | Completion of School Building for Abatan Elementary School | 500,000.00 | PSBF CY 2016 | On Top Construction | Completed | For post inspection |
|
Kapangan | Sagubo | Rehabilitation of Tadayan Elementary School in Pudong, Kapangan, Benguet | 500,000.00 | PSBF-2016 | Balangcod Construction, Fermin Balangcod | Completed | Repair of tadayan elem school in pudong, kapangan |
|
Kapangan | Pudong | Repair of Tadayan Elementary School in Pudong, Kapangan, Benguet | 900,000.00 | PSBF CY 2016 | Balangcod Construction | Completed | |
|
Kapangan | Paykek | Construction of Sabagit Footpath, Cadtay, Paykek, Kapangan | 200,000.00 | SB No. 2 CY 2016 | Balangcod Construction | Completed | Contract under cluster l: a) construction of sabagit footpath, cadtay, paykek, kapangan |
|
La Trinidad | Beckel | Rehabilitation of Lamut Elementary School | 500,000.00 | PSBF CY 2016 | ICO Construction | Completed | 99.84% Completed with under run.
|
|
Sablan | Pappa | Completion of Senior Citizen's Building, Pappa | 500,000.00 | PSBF CY 2016 | Anas Construction | Completed | |
|
Bakun | Gambang | Completion of School Building for Tingbaoen - Galisen Elementary School at Gambang, Bakun | 500,000.00 | PSBF CY 2016 | SRBA Gen. Construction | Completed | Completed with LD |
|
Tublay | Ambassador | Repair of Dorencio Elementary School (Coroz Elementary School) Building in Ambassador, Tublay | 700,000.00 | PSBF CY 2016 | Leo Heirs Construction | Completed | |
|
Kabayan | Gusaran | Ground Development at Kamora NHS | 500,000.00 | PSBF CY 2016 | | Completed | |
|
Mankayan | Bulalacao | Completion of Caew Elementary School Building | 611,000.00 | PSBF CY 2016 | | Completed | |
|
Mankayan | Guinaoang | Improvement of Ambabag FMR | 500,000.00 | PSBF CY 2016 | Malco Construction | Completed | |
|
Bakun | Bagu | Improvement of Barbarit Primary School Building | 400,000.00 | PSBF CY 2016 | Apaklo Construction | Terminated | |
|
Bokod | Bila | Improvement of FMR along Gwiling-Yabo in Palansa, Bila | 100,000.00 | SB #2 CY 2016 | SRBA General Construction | Completed | |
|
Itogon | Dalupirip | Rehabilitation of Fianza Memorial National High School Waterworks System | 285,000.00 | PSBF CY 2017 | SFF Enterprise | Completed | Completed on March 2, 2018 |
|
Itogon | Dalupirip | Construction of Stage at Lawigen Elementary School | 500,000.00 | PSBF 2017 | Compass Rose Builders | Completed | Completed and Usable
|
|
Sablan | Poblacion | Repair of Damaged HE and Industrial Arts Building, Walk Shed and Flag Pole of Palali Elementary School in Palali, Sablan | 800,000.00 | SB No. 1 CY 2017-PSB, SB No. 1 CY 2017- GF PEO | HGW=3 Engineering & Construction | Completed | Completed on March 28, 2018 |
|
La Trinidad | Wangal | Construction of Multi-Purpose Gymnasium at the Benguet Sports Center (Phase VII), Wangal, La Trinidad | 4,993,676.18 | Trust Fund 2015 DILG Pamana | Anitos construction / marty manayos | Completed | Partial accomplishment (86.67..%)of his contract due on const. of multi-purpose gymnasium at benguet sports center (phase IV),wangal,la trinidad |
|
Buguias | Loo | Loo Farm to Market Road | 1,000,000.00 | 2015 SP Res. No. 15-377 Trust Fund | | Completed | |
|
Bakun | Dalipey | Opening/Improvement of Dagadangan-Copcopit Road | 32,000,000.00 | PAMANA 2015 | MAKJAY Construction and Bakun Construction | Terminated | 1) 85.94% completed - Total Cost Incurred PhP 27,587,513.54
2) Project terminated for default as of December 2018
3) Length - 4312 meters |
|
Kibungan | Madaymen | Tokbo Bailey Bridge | 5,000,000.00 | Pamana 2015 | Universal De Leon Construction and Aggregates | Completed | 1) Completed with underrun
2) 99.84% completion which is equivalent to Php 4,937,236.67 |
|
Kabayan | Tawangan | Improvement of Talabing - Tinoc Road, Tawangan | 12,000,000.00 | PAMANA 2016 | Cabuguisan Builders | Terminated | 1) 44.6821% completion which is equivalent to Php 4,202,384.37
2) Project terminated for default |
|
Kibungan | Sagpat | Opening from Bokes-Saddle to Lasilas, Tawang towards Badeo, Kibungan, Benguet | 10,000,000.00 | PAMANA 2016 | Cabuguisan Builders | Terminated | 1) Ongoing; Original Target Completion date: April 21, 2018
2) Suspension Order No. 1 Effective February 15, 2017 due to procurement of ECC and Tree Cutting Permit; Resumer Order No. 1: March 30, 2017.
3) Suspension Order No. 2 effective March 30, 2017 due to on-going project implemented by MLGU.
4) Suspension Oder No. 3 effective August 31, 2017 awaiting for the relocation of BENECO POST and for the action of the concerned office regarding the query of the contractor regarding the COA-AOM.
5) Resume order No. 3 issued and received on April 23, 2018
6) Completed 16.4% w/ -2.34% slippage - Total Cost Incurred PhP 1,148,036.40 - as of May 2018
7) for termination as directed by DILG |
|
Mankayan | Bulalacao | Construction of Manpey-as Concrete Canal and Flood Control | 3,000,000.00 | PAMANA 2016 | Donato Sakiwat Construction | Completed | 1) Completed with underrun.
2) 98.91% completion which is equivalent to Php 2,917,950.33 |
|
Mankayan | Cabiten | Concreting of Cabiten - Kamantaki Road at Cabiten, Mankayan | 20,000,000.00 | PAMANA 2016 | Rocky 5G | Terminated | 1) 58.19% completed - Total Cost Incurred PhP 11,626,938.36
2) Project terminated for default |
|
Mankayan | Cabiten | Concreting of Cabiten - Kamantaki Road at Cabiten, Mankayan | 8,333,637.00 | PAMANA 2016 | JYP Construction | Completed | Completed on February 23, 2018 |
|
Kabayan | Tawangan | Leveling and Improvement of Tawangan Elementary School Ground, Tawangan Kabayan | 300,000.00 | SB No. 2, 2016 | Akiki Builders | Completed | |
|
Tublay | Tublay Central | Construction of Gymnasium at Tublay School of Home Industries in Tublay Central, TUBLAY | 2,000,000.00 | PSB CY 2015 | Hillstone Builders/ Hudson W. Depolio | Completed | payment of projects. a)cons.of tublay central gymnasium @ tublay central.b)cons,of gymnasium @ TSHI in tublay central,tublay benguet. |
|
Kapangan | Sagubo | Rehabilitation of Amponget Barrio School in Sagubo, Kapangan (additional) | 500,000.00 | SEF CY 2016 MOOE | Bolos Engineering and Construction | Completed | For additional Funding |
|
Itogon | Gumatdang | Rehabilitation of Gumatdang Elementary School Building in Gumatdang, Itogon | 800,000.00 | Special Education Fund 2016 MOOE | Compass Rose Builders | Completed | Completed as of May 23, 2018 |
|
Bakun | Kayapa | Construction of Water Works System for Cadsi-Amoy Elementary School in Kayapa, Bakun | 400,000.00 | SEF CY 2016 CO | SRBA General Construction | Completed | Completed on March 5, 2018 |
|
La Trinidad | Beckel | Construction of Gymnasium for Beckel Elementary School in Beckel, La Trinidad (additional) | 1,000,000.00 | SEF CY 2016 | | Completed | |
|
Mankayan | Bulalacao | Completion of Ca-ew Elementary School Building in Bulalacao, Mankayan | 611,000.00 | SEF CY 2016 | | Completed | |
|
Tuba | Tadiangan | Improvement of Kiwas Elementary School in Tadiangan, Tuba | 460,000.00 | SEF CY 2016 | Roben Runas Construction | Completed | Cluster "H" b) Control No. 0203-15-00028 - Roben Runas Construction |
|
Atok | Topdac | Construction of School Building for Ja'pa Elementary School in Topdac, Atok | 800,000.00 | SEF CY 2016 | Sangin General Construction | Completed | |
|
Atok | Cattubo | Construction of two-storey building for Calasipan Elementary School at Calasipan | 3,293,218.00 | SEF 2018 SB #1 | Camrock construction | Completed | Completed and Geo-tagged on October 17, 2019. |
|
Tublay | Ambassador | Construction of Gymnasium for Pontino Elementary School in Ambassador, Tublay (additional) | 2,600,000.00 | Special Education Fund SB #1 CY 2018 | Pecdasen Builders | Completed | |
|
Bokod | Pito | Construction of Basketball Court for Pilpiok Elementary School in Pito, Bokod | 500,000.00 | SEF CY 2016 | | Completed | |
|
Kabayan | Kabayan Barrio | Ground Improvement of Kamora National High School | 500,000.00 | SEF CY 2016 | | Completed | |
|
Mankayan | Poblacion | Construction of Shed for Lepanto National High School in Mankayan (additional) | 1,000,000.00 | SEF CY 2016 | | Completed | |
|
Kapangan | Sagubo | Construction of Gymnasium for Kapangan National High School (additional) | 2,000,000.00 | SEF CY 2016 | Balangcod Construction, Fermin Balangcod | Completed | |
|
Atok | Abiang | Opening of Kisset - Moding FMR, Abiang | 500,000.00 | 20% PDF CY 2016 | SANGIN Gen. Construction | Temporarily suspended | Temporarily suspended pending issuance of CNC by DENR |
|
Atok | Abiang | Completion of Sub-Clinic, Bocao, Abiang | 300,000.00 | 20% PDF CY 2016 | Drichloui Construction | Completed | |
|
Itogon | Dalupirip | Bantic Water Works Systems | | 20% PDF 2016 | Compass Rose Builders | Completed | |
|
Kapangan | Datakan | Repair of Datakan Elementary School Building in Datakan, Kapangan, Benguet | 600,000.00 | SEF CY 2017 | Vanket Engineering and Construction | Completed | Completed on January 12, 2018 |
|
La Trinidad | Poblacion | Repair of Benguet National High School Slope Protection and Drainage | 500,000.00 | SEF CY 2017 | ICO Construction | Completed | Completed on January 26, 2018 with liquidated damages |
|
La Trinidad | Poblacion | Repair of Buyagan Elementary School Building | 150,000.00 | SEF CY 2017 | Ico Construction Services, Jerico Palangdan | Completed | contract under cluster h: a) repair of benhs slope protection and drainage, wangal; b) repair of buyagan e/s building , poblacion, la trinidad |
|
Tublay | Baayan | Repair of Baayan Elementary School Annex Building | 600,000.00 | SEF CY 2017 | Sangin General Construction | Completed | Completed on May 8, 2018, with 598,868.65 total cost incurred. |
|
La Trinidad | Wangal | Repair of SPED Center Slope Protection in Wangal | 500,000.00 | SEF CY 2017 | Guardian Construction | Completed | 1) Completed
2) Suspended effective February 27, 2018 pending preparation and approval of Change Order No. 01 |
|
La Trinidad | Wangal | Construction of Covered Court for Regional Science High School, Wangal, La Trinidad Benguet | 1,500,000.00 | SEF CY 2017 | SEJ Construction | Completed | |
|
Atok | Pasdong | Improvement of Dituan Barangay Road | 500,000.00 | 20% PDF 2017 | Drichloui Construction | Completed | |
|
Tuba | Ansagan | Construction of Fence at Ansagan E/S | 300,000.00 | SEF-2017 | FMC Warriors | Completed | |
|
Kabayan | Ballay | Construction of Fence at Ballay Elementary School, Ballay, Kabayan | 500,000.00 | SEF 2017 | Haight's Construction | Terminated | |
|
Kabayan | Ballay | Construction of Fence at Pallay Elementary School,Ballay,Kabayan,Benguet | 500,000.00 | SEF-2017 | YKJ-LHAT General Construction | Completed | |
|
La Trinidad | Shilan | Repair of Pagal Elementary School, La Trinidad, 3 Classrooms | 8000,000.00 | SEF | On Top Construction | Completed | Completed and usable. |
|
Bokod | Pito | Repair of Galsa Elementary School, Bokod - 3 Classrooms at Pito, Bokod, Benguet | 900,000.00 | SEF - 2018 | | Completed | |
|
Itogon | Ampucao | Construction of Walk with Shed for Manganese E/S Ampucao, Itogon, Benguet | 250,000.00 | SEF 2016, SB #3 | ICO Construction | Completed | |
|
Itogon | Virac | Rehabilitation of Drainage Canal along Baguio - Balatoc - Itogon Provincial Road | 980,000.00 | SLRF CY 2015 | ICO Construction | Completed | |
|
Sablan | Kamog | Rehabilitation of Drainage Canal along Calot - Kamog - Pappa Provincial Road | 1,960,000.00 | SLRF CY 2015 | Anas Construction | Completed | |
|
La Trinidad | Shilan | Rehabilitation of Drainage Canal along Shilan - Sagpawe Provincial Road | 1,960,000.00 | SLRF CY 2015 | ICO Construction | Completed | with liquidated damages |
|
La Trinidad | Wangal | Rehabilitation of Drainage Canal along Buyagan - Wangal Banengbeng Provincial Road | 2,438,073.40 | SLRF CY 2015 | Cliff Construction | Completed | with liquidated damages |
|
Tuba | Twin Peaks | Rehabilitation of Drainage Canal along Camp 1 - Indaoac Twin Peaks Provincial Road | 1,960,000.00 | SLRF CY 2015 | Bosongan Construction | Completed | |
|
La Trinidad | Bahong | Rehabilitation along Bahong - Sadag Provincial Road | 2,340,000.00 | 5% Calamity Fund 2015 and LDRRMF 2015 | EaJr De Leon Construction/ Edwardo De Leon Jr | Completed | Completed with Liquidated damages equivalent to 6,429.48 |
|
La Trinidad | Alapang | Improvement along Alapang - Alno Provincial Road | 2,000,000.00 | PDRRMF CY 2015 CO | Sangin General Construction | Completed | Completed on February 25, 2018 |
|
La Trinidad | Ambiong | Construction of of Open Gymnasium Phase II Ambiong Elementary School | 4,000,000.00 | GF 2017 | NORBANO BUILDERS | Completed | By J G. C |
|
La Trinidad | Wangal | Construction of Comfort Rooms With Lavatory (Cold Chain) | 1,500,000.00 | GF 2018 | Four Brothers Construction | Completed | by JC |
|
Kibungan | Madaymen | Concrete Pavement Along Madaymen-Daopyongo-Sagangasang FMR | 500,000.00 | SB 2019 | Akip Construction and Enterprise | Completed | Geotagged by J G. C |
|
Itogon | LabilAB | Construction of one-room kinder School Building Labilab | 1,200,000.00 | GF 2018 | Reko General Konstruct | Completed | Completed, Geotagged by JG. C |
|
Itogon | Tuding | Construction of Covered Court Phase II AMPHS Bua, Tuding, Itogon, Benguet | 3,000,000.00 | GF 2018 | AMSLEO Construction | Completed | Geottagged by J G. C |
|
Bokod | Bobok-Bisal | Rehabilitation of Yapas Potable Waterworks System-Extention | 300,000.00 | CHARMP 2 Trust Fund | Sangin General Construction | Completed | |
|
Kibungan | Madaymen | Road Upgrading and Improvement of Halsema - Madaymen Provincial Road Phase II | 45,244,985.00 | CMGP DILG | KVC Construction | Completed | |
|
Kapangan | Boklaoan | Road Upgrading and Improvement of Amburayan Boneng Provincial Road | 43,839,963.53 | CMGP DILG | JOMARCANN General Construction | Completed | Completed on April 17, 2019 with liquidated damages and underrun |
|
Kapangan | Sagubo | Rehabilitation along Landing Waterworks System | 2,930,046.44 | DOE-ER | bolos engineering & construction/edgar baclawad | Completed | |
|
La Trinidad | Wangal | Construction of Multi-Purpose Gymnasium at the Benguet Sports Center (Phase VIII) | 4,000,000.00 | SNAPB 2015 Trust Fund | | Completed | |
|
Mankayan | Colalo | Construction of Compac at Baguyos | 1,100,000.00 | LS | | Completed | |
|
Mankayan | Guinaoang | Improvement and Upgrading of Guinaoang - Suyoc Gambang Provincial Roads | 56,838,685.91 | KALSADA - DILG 2016 | Anitos Construction / STAY Construction JV | Completed | 79.43% Completed - Total Cost Incurred PhP 45,116,764.83 as of April 13, 2018 |
|
La Trinidad | Wangal | Construction of Coffee Trading Center | 2,672,000.00 | PRDP Trust Fund | ICO Construction | Completed | On going, resumed on June 22, 2020.
|
|
La Trinidad | Beckel | Construction of Slope Protection at Beckel | 8,013,000.00 | PRDP 2016 | APB Construction | Completed | Completed on March 23, 2018 with liquidated damages and under run |
|
La Trinidad | Alno | Construction of Slope Protection at Alno | 1,763,000.00 | PRDP 2016 | Rocky 5G Builders | Completed | 1) Completed June 30, 2018 with liquidated damages
2) Suspended on December 1, 2017 due to Variation Change Order No. 2. |
|
La Trinidad | Alapang | Construction of Slope Protection at Alapang | 4,086,000.00 | PRDP 2016 | Rocky 5G Builders | Completed | Completed September 6, 2017 |
|
Atok | Caliking | Improvement of Jose Mencio FMR | 202,336,809.93 | PRDP | Northern Builders/ Jomarcann Gen. Construction (JV) | Completed | Ongoing with -9.793% Slippage as of 06/21/2019.(Slippage might change due to revised s-curve due to time extension # 03.).Revised Target Date = 08/31/2019 #
Actual completion date: August 14, 2020.
|
|
Bakun | Bagu | Construction of Slope Protection, Bagu, Bakun, Benguet | 15,500,000.00 | PRDP | FB Bantales Engineering Construction | Completed | Completed on February 21, 2018 with 2 suspensions |
|
Kabayan | Batan | Improvement of KM 49 - Ambakian FMR | 203,655,000.00 | PRDP | FIAT CONSTRUCTION SERVICES | Terminated | 1) On-going with 15.29% accomplishment - Total Cost Incurred PhP 30,302,134.38 as of March 2018 with 9.35% slippage
2) Suspended as of November 15, 2017 for the preparation of Variation Order.
3) Still suspended as of October 2018 |
|
Bakun | Ampusongan | Construction of Consolidation Facility | 3,222,000.00 | GOP,PLGU,DA-PRDP-TRUST FUND | Reasons Construction and Supplies | Completed | Completed and usable |
|
Mankayan | Guinaoang-Suyoc | Improvement and road upgrading of Guinaoang-Suyoc-Gambang Provincial road | 11,500,000.00 | PRDP | Buganheirs Eng'g & Construction (Allan Fuchigami) | Temporarily suspended | Suspended as of June 7, 2019 |
|
La Trinidad | Puguis | Improvement along Pico - Stockfarm Provincial Road | 6,994,870.60 | PCF DILG 2015 | jca general construction and engineering services | Completed | with under run |
|
La Trinidad | Wangal | Construction of PDRRMF Office Building Located at Wangal | 4,000,000.00 | Performance Challenge Fund (PCF) 2016 | Remnant Builders | Completed | Completed on May 24, 2018 with 3,994,112.23 total cost incurred |
|
Kibungan | Madaymen | Improvement and Upgrading of Halsema - Madaymen Provincial Road | 53,390,374.20 | PNRDP 2016 Trust Fund | Stay Construction | Completed | with under run and liquidated damages |
|
Itogon | Ampucao | Construction of of Multi-Purpose Open Gym at Simpa, Ampucao (Phase II), Itogon | 4,000,000.00 | 20% PDF 2018 | Jessie Construction Services | Completed | with suspensions |
|
Kapangan | Lomon | Construction of Slope Protection at the Municipal Road | 1,000,000.00 | LDRRMF 2019 | Family Circle Construction | Completed | Project Engineer: Dianne Joy B. Sangiao
Geotag by: JC |
|
Mankayan | Suyoc | Construction of Retaining Wall Along Suyoc-Gambang Road, Mankayan, Bengeut | | CSR-ABOITIZ FUND 2017 | Malco Construction | Completed | Completed and usable. |
|
Atok | Naguey | Construction of Flood Control Along Sip-sip Naguey Provincial Road, Atok | 2,000,000.00 | LDRRMF TF - 2018 | REMNANT Builders | Completed | Completed |
|